Sök:

Sökresultat:

1114 Uppsatser om Road improvement - Sida 8 av 75

Ska åkerier leasa eller köpa? : Optimal kapitalstruktur för företag med stora investeringar

This study deals with the road freight sector's capital structure and how leases, loans and equity affect the ratios. The study is based on a ten-year period between 2000-2010 in Sweden. Investments in finance is a complex and interesting subject to study, there are many factors that can affect how the company best choose their investments when they have many great business investment the decisions plays a greater role. The aim is to find an optimal capital structure from a financial investment point of view. The purpose will be answered by the following research question: Are there significant differences between leases, loans and equity financed fleet of factors, profitability, tax, turnover, age, and cyclicality. The study will also examine how debt is related to profit margin, DuPont and the tax, all through a regression analysis. Then were plausible economic theories for the study.

High Orbit Ion Cannon : Går det att skydda sig?

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.

Objektskoncentration vid slutavverkning

The study is made on behalf of SCA Skog Jämtlands förvaltning which is one of five administration units that SCA Skog consists of. The purpose of the study is to investigate which reduced expenses there are according to spatial concentration of cutting areas. By increasing the spatial concentration of cutting areas it will reduce the need of movements by trailer, also reduce the number of roads that you use during the activities. To be able to perform the study, access to a annual cuttings in nine years have been made available. From this volume new annual cuttings has been created but more concentrated. The two different results have been compared and the results show that concentration of cutting areas generates reduced need for trailer transports and less km road that has to be maintained. But then, if it´s practical viable can be discussed.

SMED implementation vid slipoperation

The thesis has investigated how Sandvik Coromant could implement the SMED principle on one of their grinders groups and what improvements it would lead to. The aim of the thesis is to identify the current situation and investigate how their setup times would be affected by SMED. The work initiated with a literature analysis about the SMED principles and then proceeded with an analysis of the current situation where the activity was time mapped. The analysis consisted of time trials of the process that the thesis would include. The time studies revealed opportunities for structural improvements to create environment for a more structured process.

Prevalence of selected infectious diseases in Samoan dogs

SCA is the largest private owned forest owner in Sweden, with an ownership of 2 million hectares of productive forestland. To manage the planning of such large areas and to fit the traditional organization structure of a Swedish forest company, the planning approach is subdivided into three stages; strategic, tactical and operational. The strategic part, based on a statistic sample of stands, returns a harvest level estimate which should then be implemented at actual sites in the tactical part. This procedure can lead to incompatible solutions as the strategic solution is not necessarily possible to translate into actual sites in the tactical plan. The geographic aspect is important in tactical planning due to the large costs for moving equipment and maintenance of a large number of forest roads.

Cyklisters situation på 2+1-vägar

In this report the situation for cyclists on 2+1-roads is analysed and studied. Theseroads are often the old 13-meter roads that have been changed into 2+1 to increasethe security. Two road sections outside Motala in Sweden has been deep studiedand analysed. The different parts in the planning process show how the progressgoes. To begin with the change should be within the old 13 meters but after thepilot study was circulated for comments the result became a broadening to 13,75and 14,00 meters.

Skötsel av vägnära skog för trafiksäkerhet och naturupplevelse :

A great deal of the nature experience we get today is from travelling along our roads, which to a large extent go through the forest landscape. This makes the forest along our roads interesting to look at from a nature experience perspective. The main idea of this work is to increase the awareness of how we are affected by the forest when we travel through it and find out how the forest should be adapted to the road environment to create a pleasant nature experience as well as increase traffic safety. 0.9 % of Sweden's total forest area (equivalent to 200 000 hectares) is in close proximity to roads. Additionally, in Sweden 440 million hours are spent behind the wheel of which a great deal probably is spent on roads surrounded by forest in some form.

Utvärdering av en beslutsåterkopplad kanalestimator för tredje generationens mobiltelefonisystem

This Masters thesis work describes a comparison between two different methods for estimation of the down channel (base station to mobile subscriber) in Wide-band Code Division Multiple Access (WCDMA). The first estimation method, Optimal Feed-forward Channel Estimation (OFCE), is a conventional method that bases the estimates on data that is known to both sender and receiver, so called pilots. The second method, Decision Directed Channel Estimation (DDCE), is an elaboration of OFCE. It also uses user data for estimation. Simulations show that DDCE, in comparison to OFCE, does not attain an improvement in signal-to-noise-ratio (SNR) for high bit error rates (BER).

Information ochmaterialflödesförbättrings analys

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Utvärdering av en beslutsåterkopplad kanalestimator för tredje generationens mobiltelefonisystem

This Masters thesis work describes a comparison between two different methods for estimation of the down channel (base station to mobile subscriber) in Wide-band Code Division Multiple Access (WCDMA). The first estimation method, Optimal Feed-forward Channel Estimation (OFCE), is a conventional method that bases the estimates on data that is known to both sender and receiver, so called pilots. The second method, Decision Directed Channel Estimation (DDCE), is an elaboration of OFCE. It also uses user data for estimation. Simulations show that DDCE, in comparison to OFCE, does not attain an improvement in signal-to-noise-ratio (SNR) for high bit error rates (BER). An improvement is only seen when the BER becomes much lower than what is common in real situations. In conclusion DDCE is complicated, involves many mathematical operations and gives insignificant improvement of SNR when BER takes common values. It is legitimate to question if it is possible to use the method in a real mobile phone system..

Taktisk planering med geografisk hänsyn : fallstudie med Heureka PlanVis på SCA Skogs distrikt Liden

SCA is the largest private owned forest owner in Sweden, with an ownership of 2 million hectares of productive forestland. To manage the planning of such large areas and to fit the traditional organization structure of a Swedish forest company, the planning approach is subdivided into three stages; strategic, tactical and operational. The strategic part, based on a statistic sample of stands, returns a harvest level estimate which should then be implemented at actual sites in the tactical part. This procedure can lead to incompatible solutions as the strategic solution is not necessarily possible to translate into actual sites in the tactical plan. The geographic aspect is important in tactical planning due to the large costs for moving equipment and maintenance of a large number of forest roads.

Emballage för väggelement i trä : Paketering, hantering, lager och transport

As a company it is required to work with strategies to minimize costs such as packaging and logistic costs. The increased market of industrial produced wooden buildings results that the time and the cost which the packaging of prefabricated building elements consume, is experienced to be in greater need of development than before and demands a better solution. The aim with this dissertation was to discover how the development of the handling of the packaging can improve the packaging process. The goal was to present improvement proposals for a simplified and thereby a more efficient production in time and cost perspective.The packaging process which includes packaging, handling, storage and transport were studied. Interviews were made with participants from the market for manufacturers of wooden houses and a case study was made at the company A-hus.

En rörig historia : en fallstudie över Secorocs processflöde av DTH-rör

Abstract Title: A messy story ? a case study of Secorocs process flow of DTH-pipes Presentation date: 2010-06-02 Course: Bachelor thesis in businessAuthor: Kristoffer ForsmanAdvisor: Kjell GustafssonKeywords: Management control, process control, lean production, process flow analysisPurpose: The purpose of this bachelor thesis is to develop an overview of the process flow for a specific product, and with the help of this mapping based on a lean production philosophy show possible improvement proposals and how these can lead to a more efficient process flow.Methodology: I have used a case study of Secorocs DTH-pipes and my primary data are gathered through interviews and observations. I have used theoretical framework to establish a process flow analysis. This is to obtain data on process activities and whether they are creating value or not. This leads to a current mapping of the situation in Secoroc on DTH-pipes and then analyzed and suggestions for improvement are developed.Conclusions: That by using the above mentioned mapping of process flow of DTH-pipes, problem areas could be illustrated.

Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Processer för Systems Development : Kartläggning, problemanalys och ? prioritering

This master thesis was performed at Scania Research & Development. The given mission was to see where the department Systems Development should focus to improve their development work. Thus the purpose was to map the product development processes in which the department works today and within them identify improvements. To fulfil the purpose a theoretical study of relevant terms, such as improvement work, product development and processes, initially was formed. The mapping method used is called "walk trough" and meant to let the people working in the processes be guides in their own process.

<- Föregående sida 8 Nästa sida ->