Sök:

Sökresultat:

8905 Uppsatser om Project development - Sida 2 av 594

Omkonstruktion av testrigg för småskalig ångsmotor

The actual project presents the development of a testing rig for a steam engine. A short overviewabout the development of steam engines is presented, until arriving to the development of thepresent engine, which will require to be tested in different ways.The testing rig studied on this project (based on a Lanchester engine) will be used to testdifferent materials and layouts for the group Piston-Cylinder.The engine is a high performance steam power engine, which is going to have a highpower/dimensions ratio, what will lead to require high performance components and materials.An introduction to the testing rig is presented, and the entire design project is done in order toreplace the disappeared documentation of the current testing rig, built on the 1970?s. Also somemodifications done in the original testing rig are presented, as well as some detected problemsand their possible solutions..

Somnus Hushåll

A product and design development of a household device which shall dry food waste has beencarried out in collaboration with Smedlund Miljösystem AB.This project has been implemented through several brainstorms and a questionnaire study.A great insight of how it is to work in a project in real work life has this project been givenme. This is a slightly less straight road to a conclusion than in the academic world that I amused to..

OnTag Scorekort : Utveckling av en mobilapplikation för Android

In recent years seemingly everything has become digital. Some areas, like classical sports, have been slower to adapt to new technical development. Golf is an example of this. Usually when people play golf they bring their clubs, golf balls and a paper scorecard on to the golf course. The advantages of keeping score in a digital way areevident.

Design och konstruktion av sparkcykel för sommar- och vinteranvändning

This thesis has been carried out in collaboration with the IT Company MPQ consulting AB in Halmstad. The task we were assigned by MPQ concerned the development of a scooter that can be used year round. We have with the companydeveloped the criteria and requirements for the product in which the goal is toproduce a primary solution that meets the set criteria and fall within the project'sboundaries.The project involves a wide range of different design methods for idea generationand idea development. The project also addresses engineering methods such asprinciple and primary engineering. Occurringmethods in the project include FredyOlsson principle and primary engineering in cooperation with SVID's - Swedishindustrial design process, etc.The final solution will be presented in the form of sketches, CAD models withassociated drawings and a rendering from the program Keyshot..

Ligger grunden till problem inom projekt i initieringsfasen?

Project management has been a very popular way of conducting information system development in the past years. Among all major information system developing companies today, almost everyone work in some form of project management. Our objective with this study has been to find out if there are any problems that begin in the early part of the project. Problems that, if they aren?t solved directly, can become bigger problems later on in the project.

Sex on the table. The formation of a wide-ranging sex education

There is a settled stereotype for women and men which give them different possibilities in our society. The schools, which are one of the most important sources of knowledge, have a great possibility to influence. This is the reason why we are interested in how the schools are working with a project, which we will call X henceforth. What was the purpose with the project and what does it contain? What is missing in the former education, since the project was started? Are there any obstacles or prerequisite in the design of the project or in the school teaching on the basis of X? We have done interviews in the gathering of empirical material to find out all the answers to our questions.

Agil Systemutveckling : En studie av kravhantering och beställarroll i agila angreppsätt

This paper is a degree project on the C-level, 15 points at University West, Department of Business and IT dept. Informatics. This study is about agile methodology and its impact on IT projects. Requirements management is a process within an IT project, where customer has certain requirements that must be met by an IT system. The difference between the traditional and agile development is in the requirements management process and it can cause problems in a project.

Babels torn återuppstår : Den interna kommunikationens påverkan i agila projektteam.

Internal communication is an important factor in organisations today. For many system development teams it?s critical that the communication works well. Without communication, success would be impossible. This study aims to highlight the effect communication has on the members of agile project teams.

Svävare : Utforming av hytt

The project in question is a joint effort between students at Karlstad University and Marcus Norström at the company Hovercraft solutions. The project is divided into two parts, one focusing on the purely technical aspects of engineering the product and one focusing on the design aspects of the product development. The project described in this report is the design of the product. The assignment from Hovercraft solutions is regarding design engineering of a cabin for the hovercraft 380TD from the manufacturer Griffon hovercraft. The product lacks a cabin and none is offered from Griffon at the time being. 380TD is a relatively small hovercraft with a length of 6.8 metres and a width of 3.8 metres.The surface available for the cabin is not much different from the body of a car.Because of this, research has been focused primarily on car bodies.The product development process used in the project is following a systematic approach.From a chosen concept, the project was finalized with a CAD-modell as well as a detailed prototype.The weight target of 80 kg was reached and the ergonomic aspects were considered developing the sight field, roof- and entrance height.    .

Framtagning av äldreanpassad stol : the development of a chair suitable for the elderly

This report summarizes a Bachelor Degree Project in Integrated Product Development, carried out during the fall 2007 till spring 2008 by three students at the Product Design Engineering Program at the University of Skövde. The project was performed in cooperation with Lundbergs Möbler AB in Tibro. Lundbergs wants to start selling furniture to the public eldercare. The purpose of this project was to adjust one of their chairs. The project layout was to first make a preliminary investigation where the market, competitors? assortment and the purchasing process are studied.

Kartläggning och utvärdering av produkter och tjänster kopplat till begreppet Smart Grids

The Smart Grids development is driven by forces concerning safe electrictransmission done in an energy efficient way. Vattenfall Eldistribution AB has a visionto transform their electricity network into Smart Grids. To invest in Smart Grids theyhave a need to show their customers what advantages they will get from thedevelopment. This led to the formulation of this dissertation project where the aim isto identify products and services related to Smart Grids that will increase thecustomer satisfaction for Vattenfall Eldistributions private customers.The project started with a mapping of existing products and services on the Swedishelectricity market. From the mapping several development possibilities for VattenfallEldistribution were identified.

UML som stöd vid småskalig utveckling av ett inbyggt system

This project aims at investigating if the use of UML as a support to small-scale development ofan embedded system is relevant. The investigation is conducted by using UML during the initialphase of the development ofTelfafill, a filling machine by the company ?Telfafill AB?. The aimof the development of Telfafill is to separate the user interface from the control unit. In additionto this main objective, Telfafill AB would like possible changes to, and additions of,functionality of the filling machine to be investigated.Within the boundaries of this project, the development of Telfafill reached a full requirementspecification of the proposed system, and contact was made with potential external developers.No prototype construction had been started when the project ended.

Safe Sleeping Position

Project Safe Sleeping Position (SSP) contains all parts in a product development phase. The project comprises the whole cycle from idea to a complete product where all aspects are included. The scope is to develop an innovative solution for a common known problem and work with all parts within the man-machine-way. The result is an inflatable product which secures a child in the correct way for the seatbelt to work properly in the rearseat of a car. Ergonomics, technical extent, usability, design, construction, product solutions and market potential are some of all parts witch the project includes.

Hållbar utveckling i Viktoriasjö-regionen, del II : en fallstudie av bönders empowerment kopplat till participarory rural appraisal i Viskogen Masaka/Rakai, Uganda

This Master?s thesis is one of two parts of a combined project called Sustainable development around the Lake Victoria, the purpose of which is to investigate the importance of local anchoring and active participation in the work towards sustainable development. The present study aims to investigate whether men and women are empowered by the participatory rural appraisal (PRA) process promoted in their villages by the VI Agroforestry Project Masaka/Rakai. The study is primarily based on interviews with farmers within the project area and brings up a local perspective on the concepts sustainable development, active participation and empowerment. The study shows that to improve the farmers? livelihood and to create a sustainable development in the community, the farmers have to be actively involved in, and in control of, the process.

Native vs Webb : En analys av appstrukturer

This paper is a degree project on the C-level, 15 points at University West, Department of Business and IT dept. Informatics. This study is about agile methodology and its impact on IT projects. Requirements management is a process within an IT project, where customer has certain requirements that must be met by an IT system. The difference between the traditional and agile development is in the requirements management process and it can cause problems in a project.

<- Föregående sida 2 Nästa sida ->