Sökresultat:
3773 Uppsatser om Production models - Sida 20 av 252
Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system
BIM has been a trend in recent years when it comes to design and construction ofnew buildings. However, there has been less talk about what happens to BIM modelsafter the construction phase.This issue has been raised at the Forsmark construction documentation department.This thesis aims to look at how the information in a BIM model can be transferred tofacility management and GIS systems and thus add value, even after the constructionphase.Questions raises how such an exchange might look like and whether it is reliable.How should a claim be brought to planners for such an exchange to work.This thesis tested some of the most common methods for this kind of exchange ofinformation from BIM models to facility management and GIS. It was formats like IFC,Fi2xml and a database connectivity that was analyzed by a computer simulation of amodel provided by Forsmark. The model consisted of an existing office building atForsmark, modeled in Autodesk Revit.The results indicate that the formats tested require a precise plotting of the models.The loss of information that came to light in the simulation could be attributed tofailure modeling in Revit. Even such things as naming of areas must be consistent.
Milk production in dairy cows and goats : a case study in the Nyando district inSouth-Western Kenya
Water is an essential factor for both people and animals, and access to water is therefore of great importance. The water access also largely determines the availability of food for people and feed for animals. The aim of this study was to survey the affect of water access on milk production from dairy animals. The study included nineteen farm visits that were made in the Nyando district in Kenya between February and Mars 2011. Farm visits included interviews with questions about for example number of dairy animals, milk production, water access, feed and water routines.
Behovstyrd ventilation Ugglumsskolans gymnastikhall
Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.
Jämförelse av livscykelkostnad för värmeproduktionssystem i flerbostadshusområde
Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.
Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå
This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.
Theory of Constraints och Lean Production i High-mix Low-volume fo?retag
Konkurrensen i tillverkningsfo?retag o?kar sta?ndigt och detta medfo?r att det sta?lls ha?rda krav pa? produktkvalitet och fo?rma?gan att leverera produkter i tid. Fo?r att fo?retag ska kunna na? upp till dessa ma?l kra?vs utveckling och sta?ndiga fo?rba?ttringar i takt med den va?xande marknaden. Detta uppna?s pa? olika sa?tt men ett vanligt sa?tt a?r att arbeta med fo?rba?ttringsmetodiker.
Matrismodellen vs Two-part regressionsmodeller - effekter på Region Skånes resursfördelning
An important task for Region Skåne is to allocate resources to the health care districts. From 1999 to 2002 Region Skåne used needs-based resource allocation as a model for allocating resources. In a needs-based resource allocation individuals with the same socioeconomic and demographic characteristics are assumed to have the same level of need and are therefore allocated the same amount of resources. During the period of needs-based resource allocation a matrix model was used as a method. In the matrix model individuals were divided into cells after each combination of the socioeconomic and demographic variables.
International and national genetic evaluation of beef cattle : validation of national genetic evaluation models
After a workshop in Kuopio held in June 2006, Interbull decided to go forward with the development of a system for beef international genetic evaluation and a three year project called Interbeef was launched in June 2007. The participating countries are so far limited to Europe and the only trait evaluated at present is adjusted weaning weight (weight at 200 days). The results from a first international genetic evaluation have been shared with the countries but are not yet official. The evaluation is based on data from purebred Charolais and Limousin. To achieve good estimates of proofs in an international context it is important that methods for data validation and model selection are implemented.
Decentraliserat lager - ett steg mot flexibilitet
This study was conducted at Glimek AB, a company that has chosen to decentralize its central storage unit in order to increase production efficiencies. The purpose of the study was to identify the problems in the production cycle that lead to the decision to decentralize the central storage unit, as well as identifying what the decentralization entails. The effects of the decentralization have not been analyzed in the study, and consequently neither financial nor production disadvantages have been considered.Appropriate questions were formulated based on the chosen underlying theories, and were asked to selected individuals with relevant knowledge. The study is based on the information that was gathered from interviews with management as well as staff within the company. In addition, supporting information such as flowcharts, drawings, orders and decision support documents were supplied by the company.
Att reducera ledtiden i en produktion med hög variation och låg volym - En casestudie på Lab.gruppen
Due to increasing product availability and higher demands on fast deliveries, the competition between companies is growing. To be able to satisfy the customers? requests an efficient logistics system with short throughput time is required. By using tools associated with Lean production companies are able to make great improvements in their manufacturing systems and reduce lead times to satisfy customer demands.There are two classifications associated with manufacturing, high variety and low volume (HVLV) and low volume and high variety (LVHV). The general belief is that the concept of Lean production is difficult to implement in a production environment with high variety and low volume due to the concept being adapted to mass production.
Folksams trygghetsavtal och miljöpolicy. Utvärdering och Analys
Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.
Fiberarmerade betongkonstruktioner – Analys av sprickavstånd och sprickbredd
Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.
Energieffektiva småhus - en studie av ett fristående enfamiljshus
Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.
Pricing Credit Default Index Swaptions A numerical evaluation of pricing models
This study examines the background and nature of the credit default index swaption (CDIS) and presentsrelevant methods for modelling credit risk. A CDIS is a credit derivative contract that gives the buyerright to enter into a credit default index swap (CDS index) contract at a given point in time. ACDS index, in turn, is a multi-name credit default swap (CDS). Within the eld of research, thisthesis identi es the CDIS pricing models presented by Jackson (2005), Rutkowski & Armstrong (2009)and Morini & Brigo (2011) as the most recognized and developed. These models are evaluated byreconstruction in a numerical software environment.
Det lutar mot Lean : En jämförelse av arbetet med- och effekterna av arbetet med Lean på ASSA AB med teoretiska kunskaper inom ämnesområdet.
Sammanfattning Datum: 2011-01-14 Kurs: Kandidatuppsats i företagsekonomi Lärosäte: Mälardalens högskola Akademi: Akademin för hållbar samhälls- och teknikutveckling Handledare: Lennart Bogg Examinator: Cecilia Lindh Författare: Wilhelm Moby och Pia Robson Nyckelord: Lean Production, implementering, effekter. Titel: Det lutar mot Lean ? en jämförelse av arbetet med- och effekterna av Lean Production på ASSA AB med teoretiska kunskaper inom ämnesområdet. Problemfrågor: Hur har ASSA AB gått tillväga för att införa Lean Production och vilka faktorer har varit avgörande?Vilka effekter har införandet av Lean Production givit verksamheten? Syfte: Den här studien ämnar undersöka och sedan jämföra arbetet med- och effekterna av Lean Production hos ASSA AB med teoretiska kunskaper inom ämnesområdet. Metod: Metoden är av kvalitativ karaktär och med hjälp av djupare litteraturstudier och en semi-strukturerad intervju ska studiens syfte uppfyllas. Slutsatser: Resultatet av den här studien kan sammanfattas med att det som framkommit i den empiriska undersökningen mycket väl överrensstämmer med det som sägs i den teoretiska referensramen. ASSA AB har först infört verktygen 5S och standardiserat arbetssätt, vilket möjliggjort införandet av andra verktyg såsom kanban. Inget av detta hade dock varit möjligt med ett lyckat resultat om inte personalen först blivit utbildade och en leankultur skapats.