Sök:

Sökresultat:

3773 Uppsatser om Production models - Sida 21 av 252

Separator: Aktionsforskning i en dansproduktion där ledarskap undersöks samtidigt som en ny organisationsform introduceras

There is a common belief that the arts contain knowledge of creativity that can enrich the business world. Similarly, the arts are in need of additional support from the private sector and know-how of business practices. In short, there is a need for mutual understanding. With my background as a dancer paired with my studies at the Stockholm School of Economics I have taken the challenge of bringing the two worlds closer together. By changing a social system, like an organization, it is possible to get a better understanding of it.

Go East!: En fallstudie av lokaliseringsbeslutet vid offshoring

This paper aims to determine what is decisive for localisation of production units when a company engages in offshoring. By performing a case study on Electrolux and comparing the results with theoretical literature we discuss the implications for manufacturing companies in general. To facilitate a structured analysis we have developed a model dividing the localisation decision into five perspectives and four geographical levels. We have found that the determinants of localisation vary depending on the geographical level of the decision process. Since all geographical levels are interconnected, the analysis needed for a decision on all levels simultaneously is very comprehensive.

Att skapa lönsamhet i ombyggnadsprojekt: riskanalys, medverkan, organisering och målhantering

Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.

Alternativa energikällor för varmvattenproduktion i fastigheten Galjonen. Solvärme och kylmaskinsåtervinning

Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.

Effektiva logistiklösningar för import av vägsalt – Fallet Peab Sverige AB

Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.

Coymo

This report is part of a Bachelor?s degree corresponding to 15 creditsat the Royal Institute of Technology, Stockholm. The work hasbeen carried out by Max Wikander, author of the report, supervisedby Lanie Gutierrez-Farewik and Erik Dijkstra.Gait analysis includes measurement, characterization and assessmentof human movement and is used to assess kinematic or otherabnormalities during gait. Center of rotation and the axis of rotationof a joint are fundamental parameters in motion analysis. However,the ability to create individualized analysis is limited by the lack ofaccuracy when these parameters are calculated.

Riskanalys för Göteborgs vattentäkt med avseende på förorenade områden längs Göta älv

Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.

Korrektion och imitation som mätverktyg för diagnos av PT-nivå : Kan man korrigera eller imitera en grammatisk struktur som man inte kan producera i fri skriftlig produktion?

The purpose of this study was to examine whether a L2 learner could correct or imitate structures of the language that they could not produce in written production defined by processability theori levels.The Informants had Arabic as their mother tongue. The study showed that the ability of correction developed slower than the capacity for imitation and the ability to written production. The ability of the correction developed by the duration of the stay. The result was a confirmation of theory formation in processability theory. Corrective elicitering could be developed into a useful diagnostic tool in the classroom and thus provide an education that followed a natural learning order according to processability theory by Pienemann.Keywords: processability theori, imitation, correction, written production.

Optimering av OTEC-system

Ocean Thermal Energy Conversion, OTEC, is a sustainable energy conversion technology that is not yet commercialized. OTEC is a technology that utilizes the temperature difference in oceans between the warm surface water and the cold water at 1 000 m depth to run a Rankine Cycle. This technology can produce electricity and provide synergies like fresh water, air conditioning and aquaculture. A simulation program for three alternative OTEC systems has been created in order to decide which OTEC system is most profitable; closed, open or hybrid system. In this simulation a production cost analysis is performed in order to investigate and decide which one of the three systems that has the lowest production cost. The production cost analysis also analyzes if the profitability is affected by the size of the facility. After these analyzes, the most profitable of the three different OTEC-systems is expanded by an installation of solar collectors in order to see if the thermal efficiency is improved. The result shows that the most profitable system varies with the size of the facility.

Yrkesarbetarnas utveckling och framtid. En studie om yrkesarbetarnas situation och förhållanden i byggbranschen

Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.

Sammankoppling av fjärrvärmenäten i Nyköping och Oxelösund : miljö- och systemkonsekvenser

District heating covers most of the residential areas and industries in the twoneighbouring Swedish municipalities Nyköping and Oxelösund. In Nyköping,Vattenfall AB Värme produces heat in a bio-fuelled CHP plant. In Oxelösund,waste heat and use of waste gases from the steel production at SSABOxelösund is the basis in the district heating system.This report examines the environmental consequences of a connection betweenthe two district heating systems. A broad system approach is used and the focusis on environmental effects in the system.A system analysis has been performed on the result of simulations of differentheat and electricity production alternatives. The alternatives simulated wereone where Vattenfall Nyköping covers the base load in the joint district heatingsystem and two where the power plant at SSAB Oxelösund supplies the heatbase load.The conclusion in this report is that the consequences of connecting the twodistrict heating systems can be both positive and negative, depending onsystem boundaries and on the environmental focus.

Jämförelseförsök mellan ogräsharvning och radhackning :

The organic farmland is increasing all the time and the goal is that 15 % of the Swedish farmland will be in organic production in year 2010. The organic production needs new and more effective ways to control weeds, and there is the row harrowing coming as a good complement to the conventional weed harrowing. In this experiment is weed harrowing whit different row spaces and row harrowing with a spacing of 25 cm compared. Then are the weed picked and the weight taken of them. The yield is compared in the 7 different ways of treatment. The results is not showing any significant differences in yield even when the row spacing is 25 cm instead of 12,5 cm. Even the spring wheat that is a sensitive crop and has bad tillering is doing well in this experiment. Now with modern technology where the row harrow is controlled by a camera that making the row harrow to follow the rows is it the soil coverage of the crop that is the limit for the speed. With wide machinery is the very good coverage even with a row harrow..

Factors for success in Swedish biogas : a study based on the Swedish agricultural sector

The energy sector of modern time is currently faced with several challenges. These are both production oriented and environmental oriented in nature. The energy of the future is intended to support an increasing demand while at the same time reduce its environmental affection. This stresses a development towards production methods of renewable energy. Among the existing methods, biogas is presented as an attractive alternative.

Produktionsanalys på Efterbehandling

Arvika Smide is a supplier to the automotive industry with a focus on advanced drop forgings including powertrain and bearings. The great experience and high quality is Arvika Smide?s speciality. Today's competition in the industries puts high demands on the efficiency where each company has a quest for perfection.Arvika Smide has been through the thesis of Karlstad University, called for a situation analysis of aftertreatment whose effectiveness has not been fully desirable. The department includes the production steps blasting, quality control and packaging.The thesis contains the results from the situation analysis and comparisons of the calculations for selected reference period Q4 2009th.

Nybyggnad till fårproduktion :

In Sweden we need more lambs during March to June. I decided to calculate on a spring lamb production, because to many of the Swedish lambs go to slaughter in the autumn. I counted on 1000 ewes which have 2000 lambs each year, 200 of these lambs stays on the farm and replace old ewes. The buildings are 3600 square meters. I have counted on two different sorts of buildings, the first one is a shed, the second one is three polytunnel sheephouses.

<- Föregående sida 21 Nästa sida ->