Sök:

Sökresultat:

783 Uppsatser om Parametersättning - Sida 4 av 53

Körplaner hos Solna Pressgjuteri : En undersökning av bristerna i användandet av ERP-systemet

This thesis investigates lacks in today?s use of the ERP-system Mapaz Affärssystem inthe production planning at Solna Pressgjuteri, and possible improvements. Today thedates calculated by the program to plan the orders are inaccurate and the ordersequence is not optimal, and therefore continuous manual corrections are needed.The approach was to study the program Mapaz to understand how it works, andidentify available parameters for input and output in the different tools offered in theprogram. By studying old lists of planned orders and relevant parameters in Mapaz forindividual orders, production groups, products and operations, the connectionbetween input and output parameters could be understood.Participating in planning meetings and discussions with the company behind theERP-system identified the current usage, desideratum and possibilities with theavailable tools. These were then matched to describe the reasons to the insufficientplanning and form possible actions for improvement.The work has showed poor understanding for the ERP-system and its functions, assome tools intended to assist the planning were not used, and some even usedincorrectly.

Radomoptimering för luftburna störsändarkapslar

These studies are done in behalf of Saab AB AVITRONICS in Järfälla in the form of a thesis atthe Royal Institute of Technology in Stockholm.The task was to examine the parameters that plays a role in the construction of modern radomesoperating in broadband applications.This was interesting for Saab to get an indication of which way they should go at the newdevelopment of radomes for the next generation of equipment for electronic warfare.After a thorough analysis of the influencing parameters, a optimization application was made toget a automated way to get a radome design by specifying data on the radome size, airloads,materials, etc.This is to minimise the time of the laborious work that radome development.inply.This was solved by letting ANSYS calculate the strength of the radome structure and MATLABcalculate electromagnetic data and cost models of different sizes and materials.All these parameters woven together with the optimization tool modeFrontier picks data from therespective program and perform an optimization algorithm and then iterate a step and sends thisdata to calculation programs for the new input data. In the end, we have received a convergedpoint with our optimal solution.For the presumptions and limitations for which applied for this thesis, the result was prettyintuitive. That is to say that the smaller radome - the less materal is needed and lowermanufacturing costs results in the cheapest solution possible. The reality is not so simple. Whereyou have to take more of the electrical details such as the effect on the transmitter as a majorfactor..

Standardisering av brukarrelaterade indata för energiberäkningar på kommersiella lokaler

In this thesis, input data for energy performance calculations on commercialpremises have been studied. In energy performance calculations, where internal heat gain parameters are unknown, template values that, in a reasonable way represent the activity in the room, are necessary. These values can be used as input data for whole-year calculations, or for calculations on shorter periods of time.The purpose of the Sveby project is to create standardized work practice in energy issues for the construction industry. The work in this thesis is conducted to correlate with the purpose of the Sveby project, with aims of contributing with information and guidelines for the continuing work with commercial premises.In this report, suggestions for template values for internal gains parameters, based on research and calculations in the field are presented. Suggestions on how these can be implemented in a user-friendly way for two energy performance calculation software are also given, VIP Energy and IDA ICE.

Verktyg för mätning av tjänstekvalitet på bredbandsnät

Operators and Internet service providers invest in broadband to be able to deliver new services that require higher data transmission rate. A way to make this possible is to use ADSL, Asymmetric Digital Subscriber Line, as the access technology. To be able to handle this technology, the service providers should do a pre-qualification. Methods and tools are needed to analyze the local copper lines and decide if these qualify for ADSL with respect to service availability and possible bandwidth through the lines. This report brings up some methods for pre-qualification of ADSL, the important quality parameters and how to gather them from the available services today.

Kostintag, energiförbrukning och kroppssammansättning hos orienterare

Bakgrund Orientering a?r en utha?llighetsidrott da?r tempo och intensitet varierar, beroende pa? terra?ng och lo?parens navigationsfo?rma?ga, och den skiljer sig fra?n vanlig utha?llighetslo?pning genom att den ocksa? innefattar kuperad terra?ng och ett kognitivt inslag. Prestationsfo?rma?gan hos orienterare kan da?rfo?r antas vara mer beroende av kostens sammansa?ttning a?n fo?r vanliga lo?pare. Forskningen om kroppssammansa?ttning, energiutgifter och kostintag hos orienterare a?r idag bristfa?llig.

Solenergisystem i Kista Galleria

Solar energy is the one most talked about among energy sources due to its huge potential amongst renewable energy technologies. A greater use of the solar energy may be the solution to today's climate threats. Normally there are two different types of solar technologies, solar cells and solar thermal collectors. Solar cells convert solar energy in to electricity whilst solar thermal collectors convert solar energy into heat, which can be used to heat hot water for households. This goal of this study has been to investigate the possibility of implementing solar energy into the energy system of Kista Galleria, one of Sweden's foremost venues.

Dragbrotschning av invändiga profiler

High-precision cutting in metal is very complicated, a lot of parameters affect the result: what geometries to be manufactured, surface roughness and tolerances to be achieved, batch size etcetera. When pull-broaching internal parts this might be even more important, than in any other cutting operation. Everything is machined in one single stroke and the general technology is built in to the tool, therefore big investments must be made to change the process. Milling for an example: one piece at a time is machined away, and a lot of parameters can be changed easily.It is very high pressure on the cutting-edge when the broach is cutting. To achieve the specified product and to avoid unnecessary toolwear it is essential to use the right cuttingfluid and the right cuttingspeed for an example.

Modellbygge av mekaniksystem och riktmotorer i stridsvagn 122

This master thesis is one part of a project, called ?StabSim?, with the purpose to develop a simulation model for the align and stabilisation system in main battle tank 122. The origin of this project is that it should be possible to make control analysis without risking any hardware. Besides that it will be easy to change components in order to investigate the behaviour of the system. The report includes modelling of tower and weapon mechanics and also the modelling of the synchronous motors, which control these.

Flygkapning och ambassaddrama : Hur terrorhändelser iscensatts i svenska kvällstidningar 1970 ? 1975

Inom mediaforskning anva?nds en teori om hur tidningar iscensa?tter sina nyheter. Iscensa?ttningar kan liknas vid hur med hur en pja?s arrangeras pa? en teaterscen och teorin har tagits fram av Gert Z. Nordstro?m.

EN VARDAG D?R F?R?LDRAR BEH?VER LIGGA STEGET F?RE En kvalitativ intervjustudie om aktivitetsbalans hos f?r?ldrar till barn med cerebral pares

Bakgrund Barn under 18 ?r har enligt lag en v?rdnadshavare som ansvarar f?r barnets omsorg och trygghet. F?r?ldrar till barn med funktionsneds?ttning som Cerebral pares (CP), har ett ?kat omsorgsansvar vilket kan p?verka deras tid, ork och psykiska h?lsa. Tidigare forskning visar att mammor till CP har l?gre aktivitetsbalans och s?mre h?lsa j?mf?rt med mammor till friska barn Syfte Unders?ka hur f?r?ldrar till barn med cerebral pares upplever sin aktivitetsbalans i vardagen.

Id?er om helhet i offentlig sektor - En studie av G?teborgs stads stadsutvecklingsf?rvaltningar

Syfte: Syftet med uppsatsen ?r att utifr?n ett institutionellt perspektiv f? en ut?kad f?rst?else kring id?erna om helhet i offentlig f?rvaltning. Teori: Studiens teoretiska ramverk utg?r fr?n ?vers?ttningsteori och teorin om lagring (layering). Metod: Studien utg?r fr?n en kvalitativ metod d?r fr?gest?llningen: ?Hur har id?erna kring helhet f?r?ndrats ?ver tid?? besvaras genom en dokumentstudie och den andra fr?gest?llningen: ?Hur beskrivs synen p? id?erna om helhet?? besvaras genom intervjuer av nio medarbetare i G?teborgs stad. Resultat: Studiens resultat visar p? att det uttrycks olika id?er som kan p?verka resultatet och f?ruts?ttningarna f?r ?vers?ttning av id?erna. Studien mer aspekter ?n enbart definitionen av helhet, utan ?ven andra aspekter som komplexitet, gr?nsdragning, styrning och definition d?r varje aspekt ?r med och p?verkar synen p? id?erna om helhet. ?ver tid s? visade det sig att grundid?erna om helhet var lika, men en skillnad som visade sig ?ver tid var id?erna kring styrning och organisering f?r att sprida id?erna om helhet.

Fukthaltsförändringar för skogsbränsle : En jämförelse av torkförloppet i grönrisskotade och brunrisskotade vältor

In 1994 a new Forestry Act was accepted in Sweden. One of the aims of the law is to raise consideration forpreservation of biodiversity. Since the new law got accepted and some time has passed, there now lie someinterest in examining whether the law has been effective towards its purpose. Methods suitable for analysishave been examined during this study. The content of this pilot study is based around five parameters whichcan be used to validate the effects of the new law.

Dimensionering av betongplatta på lös undergrund. En jämförelse mellan tre beräkningsprogram

Today more effective computer programs are in use, regarding design of geotechnicalconstructions. There is a risk that the theoretical background of the computerprograms, its limitations and the signification of the choice of soil parameter isforgotten when the computer programs become more user-friendly.This Master thesis deals with simulation and analysis regarding three computerprograms, FEM-design, with the addition Raft, Plaxis and BE-slab. Comparisons aremade for settlement and maximum moment in a concrete-plate. FEM-design is a threedimensional FEM-program, foremost created for design engineers. Plaxis is a twodimensional FEM-program, intended for geotechnical engineers while BE-Slab is aBoundary elements program in two dimensions that is mainly used by designengineers.

Löpmagsförskjutning hos mjölkkor : en besättningsutredning för att identifiera riskfaktorer för metaboliska störningar

The purpose of this study was to find possible explanations to why the studied herd had an increased incidence of abomasal displacements. The incidence of abomasal displacement in the herd was three times higher than the incidence of an average Swedish herd. The cows in this study were fed a total mixed ration. The different parameters studied were: energy content in food, nutritional content in food, body condition scoring, concomitant other diseases, and blood parameters of glucose, fructosamine, cholesterol, insulin, betahydroxybutyrat and free fatty acids. The author?s suggestions to decrease the problems are to decrease the energy content in the TMR to lower the cows? body condition scores in the dry period and changing the content in the TMR to increase the amount of NDF and adding structure in the form of chopped straw.

Riktvärden för förorenad mark : En undersökning av hur riktvärden för förorenad mark har förändrats gentemot tidigare riktvärden samt hur de påverkas av variationer i geologiska och hydrogeologiska parametrar

Risk assessment is made to determine risks with contaminated areas and to determine which treatment the area requires. In Sweden, risk assessment is divided into three levels: risk analysis, facilitated risk assessment and detailed risk assessment. In detailed risk assessment site-specific guideline values are developed to compare with values of contaminants that are measured in the area.Site-specific guideline values vary with geological and hydrogeological parameters. The purpose of this report is to examine which of these parameters that affect the guideline values. The examination was done using a calculating program for consideration from the Swedish Environmental Protection Agency from the year of 1997.

<- Föregående sida 4 Nästa sida ->