Sökresultat:
11771 Uppsatser om Construction work - Sida 5 av 785
Ljusföroreningar i stadsmiljö : Hur kan ljusföroreningar förebyggas vid nybyggnation?
Light pollution in urban areas - How to prevent light pollution at construction Jakob Sjöling Light pollution is a relatively new but rapidly growing form of pollution. Society's increasing demand for light coupled with the pace at which lighting technology evolves is accelerating that growth. The purpose of this study was to analyse how the construction industry plan and design outdoor lighting when erecting new buildings, specifically with regards to the issue of light pollution. It also investigated how local authorities work with these issues during urban planning. In both cases special interest was placed in ways to improve the planning and use of outdoor lighting in order to minimize light pollution.
Konstruktion av 6:e axel på 5-axligportalfräsmaskin
During springterm 2010 Erik Persson and Magnus Hansson performed their ThesisWork with DIAB Laholm, in Hallands County for University of Halmstad.The project has been a product development project without exterior customers. Thusit had a great emphasis on functionality and less emphasis on marketing and such.This reflects the ambition to develop machinery to be used within the productionfacilities of DIAB Laholm, not to be sold to exterior customers.Main objective has been to create machinery which enables the production ofrotational symmetric work pieces within a NC-milling machine with 5 axles. Thework pieces milled will be made of DIAB?s material Divyncell with varyingdensities.The project has followed Fredy Olssons method involving Principal ? Primary ?Manufacturing constructions. However a complete manufacturing construction hasnot been made since DIAB just wanted a good Primary construction which will serveas a base for finishing touches at DIAB.By the end of the project material including calculations has been sent to DIAB andthey will finish the work and manufacture the machine if they find economic viabilityin this.The work method has been suited for this by several reasons, it was created withthese projects in mind and it?s also the method most familiar to us..
Ombyggnation av operation gentemot alternativa byggmetoder : En konsekvensutredning för ombyggnad vid Löwenströmska sjukhuset
Over the next few years, major investments in healthcare buildings is to be performed. Most surgical theaters are in need of technological upgrades as the technology is outdated. In most cases not only a refurbishment is performed but also an expansion. The basis for expansion, is due to a large increased number of patients, but also to the complexity of the refitment. Partly it's because evacuations are difficult to implement and the disturbance that occurs in conjunction with the refitment.Löwenströmska hospital undergoing a technical upgrad.
Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system
BIM has been a trend in recent years when it comes to design and construction ofnew buildings. However, there has been less talk about what happens to BIM modelsafter the construction phase.This issue has been raised at the Forsmark construction documentation department.This thesis aims to look at how the information in a BIM model can be transferred tofacility management and GIS systems and thus add value, even after the constructionphase.Questions raises how such an exchange might look like and whether it is reliable.How should a claim be brought to planners for such an exchange to work.This thesis tested some of the most common methods for this kind of exchange ofinformation from BIM models to facility management and GIS. It was formats like IFC,Fi2xml and a database connectivity that was analyzed by a computer simulation of amodel provided by Forsmark. The model consisted of an existing office building atForsmark, modeled in Autodesk Revit.The results indicate that the formats tested require a precise plotting of the models.The loss of information that came to light in the simulation could be attributed tofailure modeling in Revit. Even such things as naming of areas must be consistent.
Shooting Target - Design : Product Development
The project has involved the development of two kinds of shooting targets in partnership with Marcus Bergkvist and Christopher Åkerblom. The project from the client was divided into two parts. This thesis discusses solutions for hands-on transport, development of tripods and an overall design. The second thesis affect resetting systems for the products.The work was done with a process and methodology based on design perspectives. This process has involved the search of relevant data which has provided the platform and opportunity for appropriate and purposeful design work.Concept development has been done using hand sketches and Photoshop, where a simple visualization of different concepts for the tripods has been produced.
Ägglocksmaskin : Produktutveckling på en maskin som hanterar ägglocken
The project has involved the development of two kinds of shooting targets in partnership with Marcus Bergkvist and Christopher Åkerblom. The project from the client was divided into two parts. This thesis discusses solutions for hands-on transport, development of tripods and an overall design. The second thesis affect resetting systems for the products.The work was done with a process and methodology based on design perspectives. This process has involved the search of relevant data which has provided the platform and opportunity for appropriate and purposeful design work.Concept development has been done using hand sketches and Photoshop, where a simple visualization of different concepts for the tripods has been produced.
Traditionella och samtida bottenbj?lklag: med fokus p? isoleringsmaterialen
The survey aims to shed light on traditional and contemporary bottom floor frames, their construction
and different insulating materials; mineral wool, wood shavings and charcoal. The purpose is to
analyze and discuss the similarities and differences as well as the pros and cons with a focus on the
construction and the different insulating materials.
The work has been limited to comparing two different wooden floor frames. The first one is based on
a real floor frame from an older building, this example is presented as the traditional floor frame in
this study and are from around 1940. The other floor frame is presented as a contemporary floor frame
and is based on wood building type descriptions and literature.
Samarbete i byggprocessen : entreprenörens förväntningar på byggherren
Everywhere you look in today?s society many kinds of people are constantly interacting with each other. Especially in large groups of people working together, the phenomenon is even greater. In the construction industry there are many kinds of parts that need to come together in order to get sustainable and successful results. Therefore the relationship between the contractor and the construction client must be at its best.
Automatiserad laddning och plundring mellan magasin
This thesis has been carried out within the bachelor program for mechanical engineering at Karlstad University in collaboration with BAE Systems in Karlskoga. The purpose with this work was to design a mechanism and associated parts for loading and unloading of shots between primary and secondary magazine in BAE's new 40mm's ship gun.Parts designed or redesigned among other things a transfer mechanism for shot at loading and unloading, well as a hatch mechanism which makes the shots do not fall out of the primary magazine when making separate use. Various important details have been designed to maintain a good functionality of the mechanism.The Construction work has mainly been carried out in the CAD software Solid Edge and its associated FEM module. The Construction work has also been carried out on rough calculations for constructed details in order to ensure that they meet the stringent requirements of military use in tough marine environment. Two of the most critical parts of the structure where analyzed with the FEM module for estimating the stresses in the material at the applied load.The final design, which is a result of the thesis, meets the requirement specification and the set targets.
Kvinnlig chef i byggbranchen : faktorer som utgör hinder till avancemang
Background: Studies that have been made in male-dominated organisations shows that only few women have succeeded in advancing to the higher positions in all businesses. Statistics shows that merely 4 % of the managers in all building companies are female. The manager role has earlier always been classified as most suitable for men resulting in barriers for women who strive for management positions. This problem is now very renowned and is called the glass ceiling. To improve the current situation, both the organization's structure and culture, have to be modernized for more women to succeed and get the courage to get into the industry.
Building Information Modeling : En möjlig modern arbetsmetod för Sweco Theorells AB
To challenge the competition within the construction business there are requirements ineffectiveness and use of operating computer based programs and work-methods. Thecomputer based programs are continuously improved and can at some point be the start of anew work-method. The work-method of tomorrow can be Building Information Modeling(BIM).This Master of Science Thesis gives an understanding in what BIM is and what therequirements for Sweco Theorells are in a future BIM-use as a consulting-firm. Theunderstanding is presented through a study of theory within the subject. The way of thinkingand acting among different disciplines and individuals within the building process isexplained through an interview study.The term BIM is regularly used.
Alternativ motorinkapsling
The problems caused by the current engine casing in aluminum for Volvo Buses Corp. are the mainfoundation for this degree project. Lack of maintenance combined with a construction poorlyadjusted for assembly has resulted in the fact that the engine casings rarely get reassembled whenthe service is completed.The degree project has mainly been following ?Olssons. F, Principkonstruktion, Compendium, Lund?and ?Olssons.
Klagomålshantering i den svenska bankbranschen
The production costs have steadily increased within the construction industry during the 21st century. Voices are raised meaning that the construction industry is too unsuccessful in making the production more efficient and to develop it?s way of working. One way to deal with the production costs is to minimise the waste, with waste meaning activities that doesn?t add value to the finished product.
?Varför är jag här? Varför sitter jag med de här gubbarna?? : En kvalitativ studie om att vara kvinna i den mansdominerade byggbranschen
This study aims to look at female executives? view of their leadership in the male-dominated construction industry. The study is qualitative and focuses on the respondents' subjective perceptions. We have conducted six interviews with women in different companies whose positions within each company varied. Using theories of subjectivity, emotions, impression management and organizational structures, to support the analysis conducted, this study shows that there are obstacles for women in the industry, but it also shows that it seems to be facing a brighter future.
Vändbord : Lokal Logistik
This thesis has been carried out within the bachelor program for mechanical engineering at Karlstad University in collaboration with BAE Systems in Karlskoga. The purpose with this work was to design a mechanism and associated parts for loading and unloading of shots between primary and secondary magazine in BAE's new 40mm's ship gun.Parts designed or redesigned among other things a transfer mechanism for shot at loading and unloading, well as a hatch mechanism which makes the shots do not fall out of the primary magazine when making separate use. Various important details have been designed to maintain a good functionality of the mechanism.The Construction work has mainly been carried out in the CAD software Solid Edge and its associated FEM module. The Construction work has also been carried out on rough calculations for constructed details in order to ensure that they meet the stringent requirements of military use in tough marine environment. Two of the most critical parts of the structure where analyzed with the FEM module for estimating the stresses in the material at the applied load.The final design, which is a result of the thesis, meets the requirement specification and the set targets.