Sökresultat:
11771 Uppsatser om Construction work - Sida 6 av 785
Apoteksmonopol - en studie som handlar om apoteksmonopolets omreglering
The production costs have steadily increased within the construction industry during the 21st century. Voices are raised meaning that the construction industry is too unsuccessful in making the production more efficient and to develop it?s way of working. One way to deal with the production costs is to minimise the waste, with waste meaning activities that doesn?t add value to the finished product.
Sverige till Indien - En interkulturell förhandlingsresa
The production costs have steadily increased within the construction industry during the 21st century. Voices are raised meaning that the construction industry is too unsuccessful in making the production more efficient and to develop it?s way of working. One way to deal with the production costs is to minimise the waste, with waste meaning activities that doesn?t add value to the finished product.
Projektledare utan branschkunskap : Varför inte?
Our starting point has been to examine how a project manager without knowledge of the industry is able to plan a project. And also which difficulties that may arise. A qualitative study was conducted at project managers who worked in the construction industry and events industry. Seven interviews were conducted, four in the construction sector and three in the events industry. Respondents are active as project manager in Värmland and Närkes counties.
Avfallshantering på byggarbetsplatser : Potential för en miljöeffektiv avfallshantering
This thesis concerns waste management on construction sites and was conducted on behalf of ICA Fastigheter.Areas of concern:How can an environmentally-efficient waste management system on construction sites be defined? What potential exists for exploiting the waste resources that are generated?How can the waste management be optimised by reducing the quantity of waste and by optimal sorting?How can the client of a project influence the waste management?The purpose of the work was to investigate sustainable waste management in the building and construction sector and to highlight waste as a resource from an environmental and economic perspective.The aim of the work was to define an environmentally-efficient waste management system, to analyse the potential that exists in waste management and to draw up guidelines for optimal waste management.The method consisted of a literature study, two visits to construction sites and four interviews.An environmentally-efficient waste management system means that the waste is managed in the following order of priority:Prevention Reuse Recycling Energy recoveryLandfill The prevention of waste is an important area that has not been adequately explored by the building and construction industry. The quantities of waste could decrease with the implementation of measures such as ordering materials in the dimensions required, prefabricated components, logistics centres with Just-In-Time deliveries, less and improved packaging and less wrapping. The reuse of waste materials and temporary apparatus as well as the use of a return pallet system are examples of reuse that reduces the quantities of waste.In most cases the source sorting work is a matter of course and the proportion going to landfill is down at a low level. The source sorting can be optimised by sorting all materials that can be reused and recycled to use them as a resource.
Arbetsmiljöarbetet på SverigesBostadsrättsCentrum : Vad ändringarna i arbetsmiljölagen innebär
This diploma work was performed because the company Sveriges BostadsrättsCentrum, with the abbreviation SBC, had a need to gain insight into how changes in the Work Environment Act and related regulations which took effect January 1, 2009 affecting their work with the work environment. The changes mean that the client may hand over his work environment responsibilities to a contractor and that he has to select so-called building work environment co-ordinators. At SBC they are working as representatives for tenant-owner's association when a construction is about to be carried out. The purpose was to ascertain how changes may affect the work at SBC. The diploma work intends to educate the staff at SBC how work with the work environment would look like if they met the regulatory requirements.
Effektivisering av logistiklösningar : En jämförelse av nya och gamla logistiksystem vid ROT-projekt
A persistent problem in the construction industry is its low margins of profit. It is often difficult to earn money due to low efficiency and high costs. Logistics on the construction site answers for a large amount of these costs and it is therefore of interest to find new, more efficient logistic solutions. The purpose of this thesis is to compare two different logistic systems and further to evaluate which one that is the most efficient and profitable. A comparison is made between the traditional logistic systems used for years and a new logistic system developed by an industry association called BEAst.
Byggdamm : Vad krävs för att minimera spridningen på ROT-projekt under produktionsskedet
Dust that arises during the construction process is called ?construction dust?.People who are exposed for construction dust for a long period of time are atrisk to develop several forms of lung problems, allergies and cancer. Todayconstruction dust is a huge problem during the production in Skanska´srenovation projects. Every day workers are exposed of the unhealthyconstruction dust and it can cause lung problems and diseases after 10-30years. This is a problem that must be taken into account to obtain a betterworking environment on Skanska´s building sites.Skanska Sweden AB has given two students the task to investigate possibleproblems about the spreading of construction dust.
Lufttäta byggnader
The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among Construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the Construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that Construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..
Samspelet mellan mål och emotioner vid skapande av motivation
AbstractBackground: The factors goals, emotions and motivation are nowadays well researched. Studies that shows the interaction between these three factors does exist, but in a small amount. In all different jobs people encounter these factors, no matter what you?re working with, some experience them daily and others only sometimes.Purpose: We want to study the significance of the interaction between goals and emotions among employees in the construction business, when leaders are about to motivate their employees.Implementation: To succeed with our study and achieve the purpose, we chose to do a qualitative research. We have conducted four visiting interviews and one telephone interview, with both leaders and employees in the construction business.Results: We have through our study found out that the interaction between goals, emotions and motivation are important in the work of construction, even if it?s not something everyone thinks about.
Visualisering av augmented reality i byggbranschen
Augmented reality is a technology thatcombines the perception and interaction ofvirtual objects with the real world. Itcan allow a user to visually see computergenerated models and informationinteracting with the real world through ahand held device such as a tabletcomputer. This opens up a range ofpossibilities, especially in theconstruction sector. A construction siteis permanently changing and the need forprecise and updated information iscrucial. The ability to enhance the realworld with virtual objects and informationmay make many plans printed on paperabsolete.This report describes how workers in theconstruction sector would benefit fromusing augmented reality on a tablet innumerous situations and the technologyneeded to achieve AR on a tablet.
"Det är så himla viktigt kring yrkesidentitet" : En narrativ studie av berättelser om folkbibliotekarien
This Master's thesis aims to investigate librarians' identity construction through the study of their narratives about themselves and their lives. We want to understand in what way the education in Library- and Information science contributes to shape the students professional identity and how these identities then continue to be transformed when they enter their professional lives. We assert that this construction of identity takes place through socialisation. We start with the reference work because we think this is a central part of librarians' tasks. Our theoretical starting point is constructionism, we mean that professional identity is a social construction that continuously is formed and transformed.We interviewed six former students at Library- and Information science at Lund University.
Skiftarbete i byggindustrin och dess värde för aktieägarna
The foremost objective of business organizations is to generate value for shareholders and to opt for strategies which optimize it. Hence it is of key concern for business leaders to appreciate how operations best are run to maximize value creation. This study explores how financial theory can reveal the link between one particular business strategy and the corresponding effect on shareholder wealth. The question in focus is whether construction companies can enhance their value creation by implementing shift-work to increase the weekly production rate. The thesis particularly targets apartment block projects in Sweden and has the construction company Peab AB as primary object of study.
Maskinrums design och layout : Varför ett maskinrum ser ut som det gör och hur det går till vid planerandet?
This report is founded in lack of knowledge concerning the design and layout procedureduring a new engine room construction.The prime question is how the engine room takes its form from idea to construction and whathappens in between. We want to give the reader a better understanding in how the work isdone and why it is designed the way it is concerning layout, ergonomics and safety. Duringthis report we will enhance the knowledge concerning regulations and rules that are of greatsubstance such as SOLAS, Swedish Sjöfartsverket and IMO.By contacting the parties involved in the process in newly designing a vessel and its engineroom, we will assume their approaches and experiences. We will study the work progressfrom planning to construction of a vessels machinery spaces. We will with the help ofinterviews with interested parties get an idea of the approach and also compare the finishedproduct a bit depending on company size and resources.The investigation resulted in a good basis for how a ship engine room design takes shape andwhich aspects are taken into account, however, we found that the existing rules concerningengine room layout was very vague and was seen as the most recommendations.
Klimatpåverkan vid vägbyggnad -beroende av vald konstruktion
It?s a fact that the climate is affected by the vehicle that runs on the worlds roads. But theconstruction of the road itself is rarely thought of as a climate threat. Svevia and the Swedish roadadministration have opposite views of how the construction of roads should be carried thru. It?sthe difference between those two construction methods that is the base in our thesis.The amount of energy use or the emissions are not analyzed for neither the Swedish roadadministrations nor Svevias construction models.
Hur påverkar logistikplaneringen byggarbetsplatsen? : En enkätundersökning om logistikkostnader i produktion
Logistics planning for a construction site is usually limited by traffic flow to and from the workplace. The geographical location of the construction site is determined by roads around the workplace and opportunities for well-functioning logistics. Inventory of material is often impossible because of the frequently small workspaces. As a result, a concern relating material handling remains . Even before the establishment of a construction site, it is required in the construction industry to eliminate errors that might arise in the planning stage.