Sök:

Sökresultat:

8730 Uppsatser om Construction management - Sida 7 av 582

Effektiv Planering enligt Lean Production : En fallstudie på Sandvik Mining and Construction

Due to a constantly increasing competitive pressure it is of great importance to constantly strive for improvements in order to gain competitive advantages. Lean Production is a concept that has been introduced with the aim to minimize waste and increase profitability. The purpose of this report is therefore to investigate how to perform effective planning according to the principles of Lean Production, in companys with customer exclusive products, through a case study at Sandvik Mining and Construction (SMC), and to investigate how SMC kan improve their planning of drifting rods at the production unit in Sandviken.The study started by creating a theoretical framework, to describe the subject planning and planning based on Lean Production. This frame work constituted the base for the case study which took place at Sandvik Mining and Construction, and also for the model and planning tool that has been introduced.The result of the study is partly a general model with factors that contribute to a more effective planning. These factors has beed identifed as SMED, which focuses on reducing set up times and in the end to facilitate the planning.

Konstruktion av efterbehandlare

The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.

Verksamhetsstyrning fo?r lokaleffektivisering inom kommunal verksamhet : ? En fallstudie av Halmstad kommun

Title: Management control of facility efficiency in municipalities - A case study of Halmstad municipalityLevel: BachelorSeminar date: 2012-05-31Authors: Markus Nilsson & Sara MattssonAdvisor: Sven-Ola CarlssonKey words: Control management in municipality, facility efficiency, management by objectives, internal rents and incentivesBackground: The public sector owns and manages a large property portfolio and in the municipalities, the properties are always a big cost item. Because of the outside world changes and the public interest, the properties should be used as efficiently as possible.Purpose: The purpose of this paper is to describe how control management of facilities looks like a municipality. The paper also seeks to explain how employees work to make the facilities more efficient in a municipality.Methodology: The authors use a qualitative method with open interviews.Theoretical perspectives: The choice of theory was made with the field of management control and facility efficiency in mind. The theory therefore includes management by objectives, internal rents and reward systems, motivation and communication within organizations.Empirical foundation: The organization has undergone a reorganization 2010/2011. There are no clear incentives to reduce facility costs.

Ett tillvägagångssätt för minskad variation i monteringsprocessen av en prefabricerad betongstomme

Att leva med kronisk sjukdom påverkar personen och dennes liv på många olika sätt. Vardagen kan upplevas oförutsägbar och aktiviteter kan behöva anpassas efter tillståndet. Kronisk obstruktiv lungsjukdom (KOL) är en irreversibel och progressiv sjukdom som förutspås vara den tredje största dödsorsaken i världen år 2030. Syftet med denna litteraturstudie var att beskriva upplevelsen av hur det sociala livet påverkas hos personer med KOL. Arton kvalitativa vetenskapliga studier analyserades med kvalitativ manifest innehållsanalys.

Revenue Management - Mycket mer än bara intäktsoptimering!

Denna kandidatuppsats syftar till att undersöka hur hotellverksamheter praktiserar Revenue Management, genom att behandla interna och externa influenser..

Sensorsystem till hinderhanterande robot

The projects goal is to construct and program a robot that is controlled from a computer but also have an obstacle handling function that allows the robot to navigate around the object by itself.The robot is a simple construction and the number of components and functions is kept at a minimum. A tricycle construction was chosen because it?s the simplest. Communication between the robot and the computer also kept as simple as possible..

Utvärdering av BeWi Byggsystem

The construction industries are relatively conservative type of business that takes a longtime to adjust for new methods and embrace new ideas. It dose not matter if the newmethod seems to be an improved method as long as it is new and untried. Constructioncompanies are reluctant to change form a longtime working method to a relativelyunknown method.The purpose with our report is to perform an evaluation of BeWi construction method.Our goal are to present the generally opinion about BeWi from the contractors that hasbeen in contact/worked with the method. We also want to know from the contractor?spoint of view if BeWi and the method measure up to the standards that are presented byBeWi and if they believe that improvements need to be done.Our progress up to the final report has consisted of three parts[1]Field studies[2]Interviews[3]Literary studiesWe started out with field studies where we took notes and observed all the includedworking phases on the construction site when using the BeWi method.

Personsäkerhet vid väderskyddsbyggande : En kartläggning över dagsläget och problematiken med frånvaron av föreskrifter i branschen

This paper, Personal safety when working with weather encapsulation constructions, is focused on weather encapsulation constructions and how the absence of Swedish standards and regulations is affecting the safety for the workers. The usage of weather encapsulation construction is increasing in Sweden therefore the needs for standards and regulations are becoming more and more urgent. The risks involving the rising and the demolition of the weather encapsulation construction and when the construction is transported along its rails are treated in the paper. Since there are no regulations companies have had to solve the safety issues without instructions, the paper regards how the companies have solved this problem without the support of formal institutions..

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Jämförelsestudier av Takkonstruktioner med Stora Spännvidder

The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.

Identifiering av avgo?rande faktorer fo?r optimal intern bygglogistik : En fallstudie av tre byggarbetsplatser

Unlike the manufacturing industry, the construction industry is always in motion. Each new construction project brings new opportunities, and it requires a new plan, new organisation, and new suppliers. All construction projects are very different from each other and in terms of a logistical perspective, this is very weak as it makes it difficult to get a flow in the production and to make flawless routines. The way the external and internal logistics are managed, can effect the final product in the time taken to produce it, the quality of the product and the profit made from it. When internal logistics are handled poorly, it could result in materials not being at the right place at the right time, or information not going through to the right person.

Lean Construction inom en geografiskt begränsad marknad

Syftet med studien är att undersöka om en geografiskt begränsad marknad inom byggbranschen underlättar en implementering av Lean Construction. För att undersöka detta har jag utgått från två forskningsfrågor: vilken inställning de tillfrågade byggföretagen har till Lean Construction och hur de arbetar utifrån ett Lean-perspektiv? Utifrån ett antal grundprinciper från Lean Construction formades en enkät för datainsamling. Resultaten från undersökningen visade att respondenterna som bestod av platschefer/arbetsledare och underentreprenörer överlag tyckte att de områden som tagits upp var viktiga för en lyckad byggprocess och en stor del av respondenterna även arbetade utifrån ett Lean-perspektiv. Enkätundersökningen tog upp nio områden: samarbete, Visible Planning med detaljerade veckoplaner, Just-In-Time, slöseri, standardisering, Kaizen, innovationer, Last Planner med arbetsplanering och Percent Plan Complete från Last Planner konceptet.

Alternativ motorinkapsling

The problems caused by the current engine casing in aluminum for Volvo Buses Corp. are the mainfoundation for this degree project. Lack of maintenance combined with a construction poorlyadjusted for assembly has resulted in the fact that the engine casings rarely get reassembled whenthe service is completed.The degree project has mainly been following ?Olssons. F, Principkonstruktion, Compendium, Lund?and ?Olssons.

Projektrisk : en studie av svenska bygg- och anläggningsföretag

Background: Today businesses are largely structured in projects and temporary organizations. In many companies, the ability to pursue projects is decisive for the business efficiency and competitiveness. The risk literature do not discuss identification and handling ofproject risk in building- and construction companies to a large extent, which has led us to investigate how project risk can be treated and handled in Swedish building- and construction companies. Purpose: The purpose of this thesis is to cover and describe business risk in Swedish building- and construction projects with focus on different risks and risk tools, and also to modify a model for evaluating the business risk maturity. Realization: This thesis has both traces of a case study and a cross-section study and examines eight different companies that are active in the building- and construction business.

3-D handlingar, GPS-styrning och VA-moduler- En ny metod för framtida anläggningsprojekt

Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is? Single Pro-duction? which is a preliminary period for ground constructions to come.

<- Föregående sida 7 Nästa sida ->