Sök:

Utvärdering av BeWi Byggsystem


The construction industries are relatively conservative type of business that takes a longtime to adjust for new methods and embrace new ideas. It dose not matter if the newmethod seems to be an improved method as long as it is new and untried. Constructioncompanies are reluctant to change form a longtime working method to a relativelyunknown method.The purpose with our report is to perform an evaluation of BeWi construction method.Our goal are to present the generally opinion about BeWi from the contractors that hasbeen in contact/worked with the method. We also want to know from the contractor?spoint of view if BeWi and the method measure up to the standards that are presented byBeWi and if they believe that improvements need to be done.Our progress up to the final report has consisted of three parts[1]Field studies[2]Interviews[3]Literary studiesWe started out with field studies where we took notes and observed all the includedworking phases on the construction site when using the BeWi method. Also during ourfield studies we ourselves tried working with the method for a more close experience ofthe work environment.As conclusion we can say that BeWi construction method undeniable are an easy- goingand working method that improves the work environment for the construction workersand also has the potential that can lead to better results.The system is based on a new kind of method which can lead to complications during thefirst times working with it, but the commissioning period relatively short. From aneconomical point of view the material costs are higher than a regular wooden foundationbut we believe that you can compensate this in the long run with the low energy costs thatthis system gives.

Författare

Joachim Hansson Sebastian Johansson

Lärosäte och institution

Högskolan i Halmstad/Sektionen för ekonomi och teknik (SET)

Nivå:

"Kandidatuppsats". Självständigt arbete (examensarbete ) om minst 15 högskolepoäng utfört för att erhålla kandidatexamen.

Läs mer..