Sök:

Sökresultat:

2013 Uppsatser om Construction contracts - Sida 7 av 135

Chefers identitet och identitetsskapande: en studie av chefer i offentlig verksamhet

The aim of this study was to gain a comprehension of managers experience of their identity and their construction of identity in the work sphere. 14 semi-structured interviews were performed with managers in the public sector. The interviews were analyzed from a hermeneutic approach. The results showed that the managers´ experience of their identity and their construction of identity were full of nuances and was characterized by a being and a becoming. The managers had several social identities at their disposal, which were brought to the fore due to the situation.

Professionell garantihantering : Ett arbete inom byggnadsbranschen

A business is always dependent on its customers. It is therefore important to ensurethat customers are satisfied with the product and the warranty included.The study was conducted in cooperation with the building contacting companySkanska Sweden. The aim is to use interviews to collect and process experiences in order to answer the question: How should the recovery process in the construction industry be performed to ensure a professional handling of warranty? The results have shaped my conclusions and I have turned them into a proposal that companies in the industry can benefit from. The study indicates that the industry is not geared for a five year warranty, which was introduced in 2004 and 2006.

Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv

This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit. The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes. The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process.

Design of Production Contracts : an examination of the Findus pea production contract

The Swedish processor Findus contracts approximately 500 pea producers annually to secure the company?s supply of green peas for human consumption. A production contract, which has had roughly the same design for decades, regulates the relation between Findus and the pea producers. Agriculture is typically a risky business. The main sources of risk in agricultural production are production risk and price risk.

Sensorsystem till hinderhanterande robot

The projects goal is to construct and program a robot that is controlled from a computer but also have an obstacle handling function that allows the robot to navigate around the object by itself.The robot is a simple construction and the number of components and functions is kept at a minimum. A tricycle construction was chosen because it?s the simplest. Communication between the robot and the computer also kept as simple as possible..

Utvärdering av BeWi Byggsystem

The construction industries are relatively conservative type of business that takes a longtime to adjust for new methods and embrace new ideas. It dose not matter if the newmethod seems to be an improved method as long as it is new and untried. Constructioncompanies are reluctant to change form a longtime working method to a relativelyunknown method.The purpose with our report is to perform an evaluation of BeWi construction method.Our goal are to present the generally opinion about BeWi from the contractors that hasbeen in contact/worked with the method. We also want to know from the contractor?spoint of view if BeWi and the method measure up to the standards that are presented byBeWi and if they believe that improvements need to be done.Our progress up to the final report has consisted of three parts[1]Field studies[2]Interviews[3]Literary studiesWe started out with field studies where we took notes and observed all the includedworking phases on the construction site when using the BeWi method.

Personsäkerhet vid väderskyddsbyggande : En kartläggning över dagsläget och problematiken med frånvaron av föreskrifter i branschen

This paper, Personal safety when working with weather encapsulation constructions, is focused on weather encapsulation constructions and how the absence of Swedish standards and regulations is affecting the safety for the workers. The usage of weather encapsulation construction is increasing in Sweden therefore the needs for standards and regulations are becoming more and more urgent. The risks involving the rising and the demolition of the weather encapsulation construction and when the construction is transported along its rails are treated in the paper. Since there are no regulations companies have had to solve the safety issues without instructions, the paper regards how the companies have solved this problem without the support of formal institutions..

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Jämförelsestudier av Takkonstruktioner med Stora Spännvidder

The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.

Effektivisering av logistiklösningar : En jämförelse av nya och gamla logistiksystem vid ROT-projekt

A persistent problem in the construction industry is its low margins of profit. It is often difficult to earn money due to low efficiency and high costs. Logistics on the construction site answers for a large amount of these costs and it is therefore of interest to find new, more efficient logistic solutions. The purpose of this thesis is to compare two different logistic systems and further to evaluate which one that is the most efficient and profitable. A comparison is made between the traditional logistic systems used for years and a new logistic system developed by an industry association called BEAst.

Lean Construction inom en geografiskt begränsad marknad

Syftet med studien är att undersöka om en geografiskt begränsad marknad inom byggbranschen underlättar en implementering av Lean Construction. För att undersöka detta har jag utgått från två forskningsfrågor: vilken inställning de tillfrågade byggföretagen har till Lean Construction och hur de arbetar utifrån ett Lean-perspektiv? Utifrån ett antal grundprinciper från Lean Construction formades en enkät för datainsamling. Resultaten från undersökningen visade att respondenterna som bestod av platschefer/arbetsledare och underentreprenörer överlag tyckte att de områden som tagits upp var viktiga för en lyckad byggprocess och en stor del av respondenterna även arbetade utifrån ett Lean-perspektiv. Enkätundersökningen tog upp nio områden: samarbete, Visible Planning med detaljerade veckoplaner, Just-In-Time, slöseri, standardisering, Kaizen, innovationer, Last Planner med arbetsplanering och Percent Plan Complete från Last Planner konceptet.

Alternativ motorinkapsling

The problems caused by the current engine casing in aluminum for Volvo Buses Corp. are the mainfoundation for this degree project. Lack of maintenance combined with a construction poorlyadjusted for assembly has resulted in the fact that the engine casings rarely get reassembled whenthe service is completed.The degree project has mainly been following ?Olssons. F, Principkonstruktion, Compendium, Lund?and ?Olssons.

Hållbart ansvarstagande för ett medelstort byggföretag i Sverige - En analys av värdeskapande aktiviteter som bidrar till hållbar utveckling.

This report deals with activities that from a CSR perspective are considered to create a shared value for a medium-sized construction company in Sweden. The CSR definition used in the report is the European Commission?s since it reflects the valuecreating aspects of CSR, in contrast to the traditional philanthropic aspect of CSR.Companies in the building construction industry have difficulties identifying activities that create value in society and in the company. The aim with the project is to, from a CSR perspective, identify and evaluate value creating activities in a building construction company. The activities will be evaluated with respect to competitiveness and how they can be implemented into an organization.

3-D handlingar, GPS-styrning och VA-moduler- En ny metod för framtida anläggningsprojekt

Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is? Single Pro-duction? which is a preliminary period for ground constructions to come.

Human Resource Management : En korrelationsstudie om upplevt organisationsstöd och psykologiska kontrakt.

The relationship between employer and employee is, from a judicial point of view, governed primarily by economic and employment contracts. However, a significant part of the dynamic is also dictated by tacit expectations and promises (so called psychological contracts). The aim of this study was to investigate the relationship between perceived organizational support (POS) and psychological contract violation. Primary hypothesis assumed that there was a correlation between higher perceived organizational support and a reduction of feelings of violation from psychological contract breach. It was also assumed that employment time, sex and past breach experiences correlated with feelings of violation.

<- Föregående sida 7 Nästa sida ->