Sök:

Sökresultat:

2013 Uppsatser om Construction contracts - Sida 8 av 135

Upprättande av mall för fuktsäkerhetsbeskrivning : Genom granskning av projekt ur fuktsäkerhetssynpunkt

During the 1990?s a large number of building projects were revealed where lack of moistsafety precautions during the construction process had led to extensive moisture damage. Alsoresent implemented studies have shown that the problems with moisture damages have ratherincreased than decreased during the past few years. Moist is considered to be one of the mainfactors to cause unhealth due to deficiencies in the indoor-environment and does also causeunnecessary expenses and a reduction of the confidence in the construction industry.In this Bachelor of Science thesis three projects have been reviewed to examine how moistsafetyhas been observed during the construction process. Main focus has been to identify thebuilding components that are the most exposed to moist, and to examine how they have beentaken into account during the period of design and construction.

Kategorisering av idésyften : En kvalitativ analys av idéer i Volvo Construction Equipment?s idéhanteringssystem

Syftet med detta examensarbete är att på uppdrag av Volvo Construction Equipment hitta en metod för att hantera och kategorisera idéflödet i deras idéhanteringssystem Interact. Den metod som användes var kvalitativ innehållsanalys. Slutsatsen är att metoden gick att använda för att kategorisera idéflödet men att ett material som sträcker sig över många ämnen tenderar att sänka tillförlitligheten på resultatet. Vidare bedöms materialet som detta arbete har producerat kunna användas för att bättre ta tillvara på idéer, vilket uppskattas av Volvo Construction Equipment..

Partnering på Carlstad Conference Center : En jämförelse åt Byggbolaget i Värmland AB

Partnering is a new and exciting way of cooperation in the Swedish construction industry. In countries like Denmark and the United Kingdom the concept has been developed during a number of years while the Swedish construction industry has been more reluctant.Partnering is seen by many as the solution to the problems that often occur in design and build contracts. Many others believe that it is a way for the big entrepreneurs to gain unfair advantage. Never the less the concept is fast getting more and more appreciation, especially in the region of Karlstad where many new buildings are built that way.We have focused on the new development of Carlstad Conference Center (CCC) which is currently built with a partnering concept. The main method that have been used in this thesis are interviews with personnel on different positions in the project.

Integration in the Supply Chain - use of Real Options to mitigate the costs of the Bullwhip Effect

Purpose: During the last years Real Options have been established in many areas of the day-to-day business. Recent literature also tries to address Supply Chain problems with option theory, since an efficient Supply Chain increasingly gains in importance as a significant competitive advantage. This thesis tries to answer the question, if Real Options can mitigate the costs induced by the Bullwhip Effect as one of the major problems in Supply Chains. Methodology: The authors of the thesis used a deductive approach. Based on a theoretical model utilizing Real Option contracts and under the usage of a randomly created dataset the influence of the Bullwhip Effect on the company?s business and financial structure is examined and subsequently analyzed.

Risk eller Resurs: En studie av hur riskbegreppet konstrueras i den svenska kärnkraftsdebatten

Looking at the debate on nuclear power in Sweden, the issue of risk is central to understanding the difficulties in resolving differences between proponents and opponents. I sought to answer the research question: "how is the concept of risk constructed in the nuclear power debate in Sweden?" Four main aspects of risk construction were defined and investigated to identify differences between sides in the debate. Through a qualitative study of the debate and its actors I found clear differences in respect to all four aspects of risk construction. First, the perception of nuclear power as a "normal risk" is common among nuclear opponents in contrast to a largely probabilistic view among proponents.

Skyddsombudets Roll : En undersökning av skyddsombudets säkerhetsarbete på byggarbetsplatsen

Safety in the construction industry has become a question of top priority in recent years. Despite a massive investment of time, money and knowledge, the occur-rence of fatal accidents in Sweden alone is around one a month.The purpose of this study is therefore to improve the safety on the construction site. By an examination of the role of the safety agents and their cooperation with the construction workers and supervisors as well as examine how safety agents can improve safety on the construction site, which is the goal of the study.Four questions were formulated based on the purpose and the goal of the study.The methods used to answer the questions were a questionnaire survey, multiple interviews, a literature review and a document analysis.The report describes the safety agent?s role as a complex one with many different tasks. The role of the safety agents is regulated in the health and safety law, but it can sometimes be difficult to interpret and the agents can therefore interpret their role differently.

Säkrare arbetsmiljö på byggarbetsplatser : Hur brister på arbetsplatser borde åtgärdas för att kunna arbeta på en mer hälsosam arbetsmiljö

Work Environment problems on construction work sites are very extensive and discussed. The construction industry is one of the most dangerous industries in Sweden. The construction industry occupies about 290 000 employment (2009), and the investment was 250 billion SEK. This report will investigate the issues of the work environment and offer advice on how these can be measured and imporved. The study includes review and analyses of occupational injury statistics, interviews, inspections and audit and review of the literature.

Hur skapar man en funktionell och beständig dörrmiljö? : En närmare studie av ståldörrar

Today?s construction buildings contain more advanced technologies than before. The development of newer and stricter regulations to the construction industry makes the door environment more and more complex.In large construction projects the door environment is held up as a major challenge to get to in a good way. It turned out after a discussion with one project manager and a site manager at NCC, that the door environment is difficult to get right in major construction projects and it often causes many error reports in to the aftermarket after that the final inspection is completed.Interviews have been done with key figures in the building process at NCC and Akademiska hus. A study on a university building for around 3500 students and with 300 workplaces was made.

Tonala skillnader mellan en traditionell och en modern gitarrkonstruktion : En jämförelse mellan två klassiska gitarrer

During my studies to become a guitar builder at Carl Malmsten CTD, I have found an interest in the construction of the classical guitar. I am fascinated by the simplicity of its construction. A simplicity that becomes more complex when you start to study it in detail.In my final thesis I will not try to explain this complexity. The subject is to investigate two different principles regarding its construction. I would like to find out if the sayings concerning one of the principles will yield a guitar with greater ability to produce volume and projection.At a close distance the difference between the guitar?s volumes is not to speak of, but a significant difference can be seen regarding one of the guitars ability to project its sound.

Demokrati vid behov? - En studie kring behovsanställningar i den offentliga sektorn

On-call work has increased substantially in the past 20 years in Sweden, not least in the public sector and most notably in health and social care. This thesis argues that the increase has considerable influence on the prospects of on-call workers in the public services to act as guardians of democracy. Based on theories of Lennart Lundquist, the results of this study show that on-call workers suffers from inferior opportunities to act as democratic guardians in particularly two matters. First; they have fewer prospects than standard employees of professionalism due to lack of education and capacitation. Second; on-call workers have inferior opportunities to protest against wrongs, due to no real formalized possibilities to inform and due to transactional psychological contracts.

Koldioxidutsläpp vid vägbyggnad - en fallstudie med jämförelse av alternativa byggnadssätt

Abstract This degree project examines how much carbon dioxide that emits during the construction phase of a road project. This is to make it possible to compare how the amount of carbon dioxide differentiates between traditional road construction and Swepave construction, which is PEAB?s alternative way to design roads. To make the comparison a calculation tool has been produced. To compare the amount of carbon dioxide emissions a reference project was needed.

Värdering av föroreningsrisk - Ett förslag till angreppssätt för värdering av föroreningsrisk till följd av emission från en vägkonstruktion

When constructing a road the risk of emission of substances from the used materials to the surrounding environment has to be evaluated. The aim of this study is to present a proposal for how to evaluate the risk of contamination as a result of emission from the materials in a road construction. The study is based on literature studies, an inventory and a questionnaire that examines how experts in governmental agencies, industries and universities evaluate the risk of contamination. The inventory indicates that guidelines for evaluating the risk of emission from secondary materials in a road construction do not exist. The conclusions from the questionnaire are: that there is no common way to evaluate the risk of contamination as a result of emission from materials in the road construction, there is no uniform interpretation of the terms "minor" and "significant" risk of contamination and that the evaluation is subjective.

?Varför är jag här? Varför sitter jag med de här gubbarna?? : En kvalitativ studie om att vara kvinna i den mansdominerade byggbranschen

This study aims to look at female executives? view of their leadership in the male-dominated construction industry. The study is  qualitative and focuses on the respondents' subjective perceptions. We have conducted six interviews with women in different companies whose positions within each company varied. Using theories of subjectivity, emotions, impression management and organizational structures, to support the analysis conducted, this study shows that there are obstacles for women in the industry, but it also shows that it  seems to be facing a brighter future.

Ni börjar väl dagen med morgonuppvärmning?! En Fenomenologisk studie om de anställdas upplevelse av friskvården på NCC Construction Sverige AB.

The aim of this study was to get a deeper understanding of how employees at NCC Construction Sverige AB experience health promotion activities. The purpose was to identify and uncover the process of meaning constitution concerning health promotion within each subjective individual. To achieve this deeper understanding the participants were asked to answer a carefully formulated phenomenological question in a self-report. The received reports where analysed according to the method of Meaning Constitution Analysis. The result showed that both office workers and construction workers exclusively refer health promotion to bodily functions even though there where some differences in type of activity they focused.

Utökad samverkan med leverantörer : - Partnering, en lönsam möjlighet i byggindustrin?

The construction industry has been heavily criticized in the past few years for its development of productivity compared to the manufacturing industry. In 2009 the Social Care Center developed a report that treated och criticized different errors within the construction industry. For instance competence, construction errors and performance had showned bad results which had to be improved. A common sentence within the building industry is that ?every project is unique?. Today it?s common for a construction company to have costs for material and services which exceeds two-thirds of the total cost.

<- Föregående sida 8 Nästa sida ->