Sök:

Sökresultat:

3265 Uppsatser om Wind power plant - Sida 6 av 218

Säkerhetsanalys av brandbekämpning i kritiska utrymmen på Forsmark 1

In order to maintain a high safety level at a nuclear power plant it is important not only to measure the reliability of the components and systems of the plant, but also to investigate how the plant responds to human actions. One of the most hazardous situations in managing a power plant is fire occurring in critical areas. This study concerns the prospect of the local fire brigade to suppress a fire that has started in one of the most critical rooms for maintaining high reactor safety. The model created gives an indication on the possibilities of succeeding in suppressing a fire. In order to get a more reliable fire fighting the following advice are given:- Let the fire brigade go rounds in the plant together with the personnel, during which recommended fire suppressing methods are determined to avoid long preparation time in an actual situation.- Prepare rooms with two subsystems to make them partly with no voltage.- Give the fire brigade better feedback from actual events on nuclear power plants.- Education and training in suppressing fires in electrical equipment.The probabilistic safety assessment strives to be as realistic as possible.

Småskalig elproduktion i urban miljö : Fallstudie av elproducerande system på ett handelscentrum

This thesis investigates if a system for small scale electricity production located in anurban environment can be profitable. The work has been divided up into two parts,one extensive literature study and one case study. The purpose of the literature studywas to investigate the area, resulting in a choice of which technology to be studied indepth in a case study.In the case study a system containing small scale wind turbines and photovoltaicsmounted on Gränby Centrums roof was examined. From data containing wind power,wind direction and total irradiation, possible production from a system weresimulated. Three products of each technology were examined in the simulations.From the simulated production an economic analysis was carried out, this toinvestigate if a system is profitable.

Supermarket Strategies : Kvalitativ studie av Ica Maxi, Coop Forum och Citygross konkurrensstrategier

This thesis investigates if a system for small scale electricity production located in anurban environment can be profitable. The work has been divided up into two parts,one extensive literature study and one case study. The purpose of the literature studywas to investigate the area, resulting in a choice of which technology to be studied indepth in a case study.In the case study a system containing small scale wind turbines and photovoltaicsmounted on Gränby Centrums roof was examined. From data containing wind power,wind direction and total irradiation, possible production from a system weresimulated. Three products of each technology were examined in the simulations.From the simulated production an economic analysis was carried out, this toinvestigate if a system is profitable.

Fällning av kisel från avloppsvatten vid Hellisheidarvirkjun - experimentell studie

This report is about the experiments with mixing of the separated water and the vacuum pump seal water at Hellisheiði power plant. This is done to prevent silica scaling and clogging in pipes and reinjection wells as well as eliminating vacuum pump seal water from the plant. The experiments were done in four stages: the first stage comprised of tests with different flows of separated water at 70°C, the second stage was carried out by mixing the separated water at 70°C and the seal water with different amounts of the seal water, the third and the fourth stages were like the first and second but with the separated water at 120°C. The results show that this method is good if the mixture is around 50/50 separated water and seal water, to control the silica scaling in the separated water and to be able to reinject the seal water with the separated water. This does not eliminate the silica scaling in all of the separated water because the amount of separated water is much more than the amount of seal water that comes from the plant. .

Projektering av vindkraft i turbulensintensiva områden : med fallstudie för Wallenstams planerade park vid Skuggetorp

Along with the rapid expansion of wind power in Sweden during the last decades the competition about favorable areas has hardened. This among other reasons has caused the projectors to look into development of wind power in forests. There are several aspects regarding fatigue loads on the constructions that are severe in complex terrain, among which turbulence is one. The levels of turbulence which are accepted in order for the turbines to face a life length exceeding 20 years are regulated by the International Electrotechnical Commission, (IEC). In order to keep the turbulence below these levels there are three major steering tools to use: The ambient turbulence decreases with height and can therefore be regulated by the hub height of the turbines.

MÄTNING AV LJUDIMMISSION FRÅN VINDKRAFT. VIDAREUTVECKLING AV METOD FÖR MÄTNING

The Swedish government have a goal that wind turbines shall produce 30 TWh by the year 2020, compared to about 3,5 TWh produced in Sweden during 2010. To minimize the disturbance that wind turbines create the Swedish Environmental Protection Agency has stated a guideline value that noise from wind turbines at nearby residents shouldn?t exceed 40 dBA, at 8 m/s wind speed. With advanced calculation models, like Nord 2000, the emitted sound from future wind turbines can be calculated at an early stage to optimize the power production without exceeding the 40 dBA. When the turbines have been built there is a need to verify that they really are within the guideline.

Energiewendes påverkan på det nordiska kraftsystemet

Both the German and the Nordic power markets are seeing dramatically changed conditions due to an ongoing process of expanding the share of renewable production in the systems. For the German part this comes from heavy subsidies which have led to an explosive development in installed capacity of photovoltaic and wind based production. After the Fukushima incident it has been decided to shut down all Germanys nuclear plants. This capacity drop is however not of the same magnitude as the increase in renewables, but will impact the stability of the power system. The Nordic power system which already has a surplus of power sees an even further increase, coming mainly from construction of new nuclear plants in Finland and a general increase in wind farms.

Turbinkretspump system - Kraftvärmeverket i Borås

The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.

Vindkraftens framtida scenarier

In several countries that have been early in the development of wind farms, there is today a second hand market for the used wind turbines. The European Union (EU) has established a waste hierarchy in order to minimize throwaway mentality. The second hand market is a part of this as the steps are to minimize, reuse, recycle, extract energy and landfill.In order to promote the development of renewable energy, there are energy certificates for the producers that provide it, wind power being one type of renewable energy. After 15 years the energy certificates for a specific wind turbine are no longer paid, and after that there are several different scenarios for the wind turbine. The scenarios investigated in this bachelor?s thesis are export of the wind turbine to countries that are not as far along as Sweden in their development towards renewable energy, selling in Sweden to individuals, and recycling of the wind turbine, as it mostly consists of metals and therefore is recyclable.

Konstruktion av statorstomme för synkrongenerator : Förslag på design av statorstomme för användning i vertikalaxlade vindkraftverk

This thesis describes a conceptual design of a support frame for a synchronousgenerator used in a vertical axis Wind power plant. In this system the generator isplaced on ground level. The thesis also considers the design of housing for thesupport frame and generator. The concept presented in this report is based on anearlier design. Besides geometric design, simplified simulations has been run in orderto optimize some of the parts included in the construction considering naturalfrequencies and structural strength.The result is presented as CAD-models andan assembly drawing..

Dynamisk modellering av kärnreaktor

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Metoder att förhindra nedisning av vindkraftverksblad

ABSTRACTMany wind turbines have problems with icing and there is still no effective method to de-ice without stoppage of production and power loss. Here I therefore consider other methods than those available today, and particularly, I consider how these methods could be applied to wind turbines of the company Oxel. A surface where the water droplets do not attach might be the basis for a useful method. If no water attaches, no ice could form. To accomplish this a hydrophobic surface is nessesary, for example wax.

Momentfördelning i pelardäck av armerad betong

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Kvalitetsarbete i samband med byggande av betongkonstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

En amatörmusikkår i en föränderlig verklighet : En berättelsebaserad dokumentation med ett antal frågeställningar

The local wind band in Lilla Edet, Lilla Edets Musikförening, springs from work and activities in the late 19:th century. Since then, the band has developed from a brass sextet to mixed wind band. It has been an appreciated contribution to the society on festive occasions. Yet, it seems like the band more and more has lost it´s useful purpose. Also, the recruiting of new members has ceased, as the music school has trouble with attracting pupils to learn to play wind instruments.The reasons for this reduced interest are more then one.

<- Föregående sida 6 Nästa sida ->