Sök:

Turbinkretspump system - Kraftvärmeverket i Borås

The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted. The same amount of energy cost during the same period of time 205 000 SEK on Nordpool?s electricity spot market elspotsmarket.

Författare

Thorbjörn Gustafsson

Lärosäte och institution

Högskolan i Borås/Ingenjörshögskolan (IH)

Nivå:

Detta är en C-uppsats.

Läs mer..