Sök:

Sökresultat:

363 Uppsatser om Stationära värmeförluster - Sida 3 av 25

Uppbygnad av ett logiskt flöde vid produktionsövertag

The situation at Plastal AB is following; the plant in Simrishamn has not capacity enough but the plant in Kristinehamn has unused capacity. My task with this master thesis is to build a logistic flow between this two plants, optimize purchase quantities and ensure delivery safety.The production of the Intermediate Section (LS) will be divided between the plants. The LS will be produced in the following way; the injection moulding process will be done in Simrishamn and the assembling and lacquering processes in Kristinehamn, The reason to divide the production is to ensure delivery safety. Plastal AB can not move the whole production of the l.S because the two plants have different processes (moulding res. injection moulding).When the 1.5 has been transported to Kristinehamn following moments are included in this order; lacquering, welding and assembling.

Station Bönered - om att skapa goda miljöer kring ett pendeltågspår

När en stad växer måste man ta ställning till hur det ska ske. Idag är biltrafiken dominerande i Göteborg och i framtiden skulle spårbunden trafik och utbyggd pendeltågstrafik i regionen kunna innebära mer hållbara tranporter. En pendeltågsstation har ett relativt begränsat omland och behöver för fullt utnyttjande bebyggas nära inpå. Den spårbundna trafiken kan dock innebära störningar och risker. Jag undersöker i mitt examensarbete hur en ny stadsdel utanför Göteborg kan byggas ut kring en tänkt pendel­tågs­station.

Den tillgängliga stationen : Gestaltning av en stationsmiljö på basis av tillgänglighet

This report is about accessibility in a station environment. Studies have been made about how an accessible building should be designed. Accessibility is an important issue when striving for a society with equality as the foundation. Sweden is one of the most accessible countries when speaking about the built environment. A result of prosperity and a well-managed democracy.

Förstudie för kvalitetssäkringav glidande förband vid Hissmoforsvattenkraftsstation : -Specifikt för aggregat G6 och G7

Jämtkraft AB which is a power production company in Sweden has bought two newhydro power units to their station in Hissmofors. The two new generators are using aconcept with sliding stator feet to handle the thermal expansion.The concept with sliding stator feet on hydro electric generators has not beenworking satisfactory on many hydro power stations in Sweden and has caused a lot ofcosts due to long downtimes.The new station in Hissmofors is very important for Jämtkraft AB, and therefore theywant to know how to make sure that the sliding stator feet are working as theyshould. According to theories and a simplified model of the generator the stator feetdisplacement should be around 1 -1,6 mm.The generators are delivered with a surveillance system that will measure thedisplacement of the sliding stator feet. The signal from the system isn?t accessible forJämtkraft AB but it will alarm when the sliding stator feet are malfunctioning.To secure the function of the sliding feet a logger for the surveillance system or adifferent measurement system must be used; if both systems are used Jämtkraft cansecure the function of the surveillance system..

Miljö- och hälsoskyddskontorets tillsynsarbete - ur verksamhetsövarens perspektiv

Nanofiltration is a proper way of preparation of drinking water. The process has a lot in common with reverse osmosis where a semipermeable membrane is used to separate a pure water flow from the remaining water. A pilot plant was used to ensure that nanofiltration is a suitable technology for a specific waterworks station in Glemmingebro, Ystad. The purpose was also to find out if a pH-adjustment is needed for feed water in a possible full scale plant.  In this case nanofiltration is used mainly to remove sulphate and calcium since the raw water contains concentrations of these substances which exceed the limits for potable water. It is important to receive a high recovery (RC), otherwise the deliviery of water won?t be high enough.

Distribution of wild boar (Sus scrofa) damage and harvest loss in crop fields

The last decades the populations of wild boar (Sus scrofa) has increased rapidly over the species? entire European range, including Sweden. This is followed by increasing human-wildlife conflicts as a result of the wild boar foraging behavior, causing damage to agricultural crop fields due to trampling and feeding. To be able to minimize damage we need more knowledge of where in the fields the risk of damage is high and what features in the landscape that affect this risk. I analyzed damage distribution in relation to the distance to six different landscape features; forest, road, ditch, building, game field and bait station, in the study area, the Island Mörkö in eastern central Sweden.

Nya metoder för vibrationsmätning på vindkraftverk

This project has revolved around finding better ways of overseeing vibrations of the gearbox at a wind power station. The gearbox has been a huge problem at the stations located at Gässlingen and the sooner the warning of an incoming breakdown is at hand the more money you can save from preparations. The work has been carried out together with Askalon AB in cooperation with consults from ÅF. Askalon is a company with a department focused on overseeing vibrations and it is in collaboration with that department the work has been carried out. During this work, new positions for the sensors and new methods of gathering and analyzing data have been worked out. This was then implemented at a wind power station to be tried out on site.

Konstruktion av en autonom vindstation

Construction of an autonomous wind station was a project with the goal of creating a product that could collect wind data from a sensor and then transfer this data to a server wirelessly over the GSM network. The device would be powered by batteries and solar cells and function fully without requiring external power supply. This required that a small computer was constructed and programmed to store and send data at predetermined cycle times and programming of a server that received the sent data. The project also required optimization of power consumption and dimensioning of solar cells and batteries based on this. The construction of this station demanded research both for the selection of hardware and programming software. The computer was based on a microcontroller and a GSM module that sent the data over the 2G network.

Småskalig vattenkraft vid Olofsfors bruksmuseum : Med faunapassage

In Sweden there are 1894 small-scale hydropower plants in operation, which together generate 4.3 TWh of electricity per year according to Swedish hydropower compound (SVKF, 2011). This corresponds to the annual consumption of about 860,000 Swedish households (based on an annual consumption of 5000 kWh). In the mid-1950s there were around 4000 small-scale hydropower plants in operation in Sweden before cheap fossil fuels and uranium competed with them, in the current situation only 1,894 of these are in use. If slumbering small hydropower plants once again would be taken into use and some new ones are built, we would be able to extract about 7 TWh of renewable electricity from these annually in Sweden, representing about 1.4 million households.The thesis intends to calculate and construct a hydroelectric power plant at the existing dam in Olofsfors and give suggestions on how the power station should run during the time that fish migration is greatest in Leduån.The turbine and generator to the station in Leduån at Olofsfors is designed by the height of the fall and the water flow through the dam. The turbine selected for the station is a CK-1000RM turbine with a 4-pole 250 kW generator from Cargo & power turbine Sweden AB, which is expected to deliver 1.2 GWh per year.

Erfarenheter av forcerad materielförsörjning av Vapensystem 01

This Thesis in Military Technology deals with experiences drawn from the forced introduction of Weapons Station 01, 2009. The work aims to identify the experiences regarding the forced procurement of military equipment to see how they can develop normal and fast procurement of equipment. The main conclusions of  this work, is to achieve greater capability and increase the military utility, are: -          Common objectives and priorities of stakeholders-          Response and joint types shall determine requirements for system-          Ensure an integrated project team also at lower levels-          Engage the integrated logistic support early in the materiel process-          Include Armed Forces staff as early as possible in the testing and validation-          Prioritize work to facilitate the rapid development of decision on use (BOA)-          Provide back up for increased redundancy in the mission area .

Levbart transportsystem i Uppsala

In this thesis a transport system is sought after thatif realised in the city of Uppsala could provide bothwell-being to all its inhabitants and sustainability,here jointly refered to as liveability. It is found thatthe car dominated transport system that is inoperation today provides two fundamental values,namely accessibility in both time and space, whichsets it apart from other transport solutions. Thesetwo values are of immense importance for theliveability in our modern world. On the other handthe car dominated system decreases the liveabilityof Uppsala in several different ways. Some of theseproblems, it is argued, could be solved within thecar system, through the adoption of moreenvironmentally friendly cars etc., but otherproblems are inherent in the car system and willremain no matter what changes are made.

Analys av produktionsflödet

Detta examensarbete utfördes våren 2007 på industriverkstaden Ducorail i Luleå. Målet med examensarbetet är att få in tre nya arbetsstationer i den nuvarande produktionskedjan, dessa tre stationer är en demontering/monterings station för cylindriska lager, och en liknande station för TBU lager samt att en tvättanläggning ska nyinstalleras. Den befintliga kedjan ska ses över eftersom en del stationer kan hamna i vägen om man låter dem vara kvar. Utan omorganisation skulle det leda till onödigt truckanvändande eftersom hjulen måste lyftas över stationer som ligger felaktigt. Några alternativa lösningar togs fram, efter utvärdering av dessa valdes en idé att arbeta vidare på.

Som en bla?nande borg i fo?rla?ngningen : En analys av den tyska o?versa?ttningen av Pa? fja?lltur: Sarek med fokus pa? termer och bildspra?k

Uppsatsen utgo?r en analys av utvalda delar av den tyska o?versa?ttningen av guideboken Pa? fja?lltur: Sarek av Claes Grundsten. Fokus i analysen ligger pa? o?versa?ttningen av termer och bildspra?k. Syftet med analysen var att underso?ka hur o?versa?ttaren pa? tyska har a?tergett naturbeskrivningarna som speglas i termerna och bildspra?ket, och hur denna a?tergivning pa?verkar la?sarens uppfattning av boken.

Integrering av ekodesign i produktutvecklingsprocessen hos Blå Station

Eco-design is all about improving products environmental performances throughout the products lifecycle by including the environmental aspect into the product development process. There are a large number of different tools that can be used for this, but there are several factors that can affect which one will be the best to use. Some tools for eco-design takes comprehensive studies and can only be performed by experts, while some tools can be used more time- and cost efficient and with basic knowledge. The choice of tool should be based on the company?s situation.This report describes the research of how the design and furniture company Blå Station could include a tool for eco-design in their product development process.

Värmeåtervinning av gruvventilationsluft - LKAB i Kiruna

For att brytning under jord ska vara mojlig maste stora mangder frisk luft pressasned till brytningsnivan, vilket gors fran olika gruvventilationsstationer. For att undvikanedisning i schakten varms tilluften upp till 1. innan luften transporteras nedi berget. Idag sker denna uppvarmning av varmebatterier som nyttjar spillvarmefran kulsinterverken. Finns ett extra varmebehov spetseldas det med olja.Franluften ar fuktig och varm.

<- Föregående sida 3 Nästa sida ->