Sökresultat:
883 Uppsatser om Sewage plant - Sida 4 av 59
Utvärdering av olika sätt att hantera avloppsslam i Värmdö
Important issues for the local authorities are what to do with the sludge produced insewagetreatment plants. The tax for landfill leads to higher costs with 250 SEK/ton. On the 31December 2004 it will be forbidden to landfill sludge.In Sweden the yearly production of sludge is 240 000 tons, counted as DS. The phosphorouscontent is 3 % in sludge. The total yearly production of sludge gives 6000 tons of phosphorous.
Växtmaterialet i 1700-talets engelska park : en växtplan för Engelska kullen på Gunnebo
Gunnebo House and Gardens was designed during the late 18th century by architect Carl Wilhelm Carlberg as a summer residence for the wealthy merchant John Hall Sr. and his family. The garden consists of formal garden, kitchen garden and English park. For the first two parts several original drawings have been preserved and here a lot of restoration work has been carried out. This paper aims to examine how the English park might have been implemented during John Hall Sr.?s time and to create a plant scheme for the area called ?Engelska kullen? (The English hill).
Fällning av kisel från avloppsvatten vid Hellisheidarvirkjun - experimentell studie
This report is about the experiments with mixing of the separated water and the vacuum pump seal water at Hellisheiði power plant. This is done to prevent silica scaling and clogging in pipes and reinjection wells as well as eliminating vacuum pump seal water from the plant. The experiments were done in four stages: the first stage comprised of tests with different flows of separated water at 70°C, the second stage was carried out by mixing the separated water at 70°C and the seal water with different amounts of the seal water, the third and the fourth stages were like the first and second but with the separated water at 120°C. The results show that this method is good if the mixture is around 50/50 separated water and seal water, to control the silica scaling in the separated water and to be able to reinject the seal water with the separated water. This does not eliminate the silica scaling in all of the separated water because the amount of separated water is much more than the amount of seal water that comes from the plant. .
Ekonomiska konsekvenser av etanolproduktion i östra Sverige : en analys ur lantbrukarens och förädlingsföretagets perspektiv
This study analyses the economic consequences due to ethanol production in Eastern Sweden. The analyses consider the cooperative and the farmers as one vertically integrated company. The area that found the market in this study is illustrated in figure 1.
The analyses assume that all members act jointly with the objective of maximizing joint profits at the farm level as well as at the cooperative firm. A mathematical model is created to calculate the optimal use of arable land.
Alternativ uppvärmning av reningsverket på Utö - En studie av energibesparingsmöjligheterna i syfte att minska uppvärmningskostnaderna
The projects objective is to find an alternative method of heating (the current method being via electric heating) the sewage treatment plant on the island Utö in Stockholm?s archipelago in order to reduce the energy consumption and ultimately the cost for heating the plant. The project is given by ?Skärgårdsstiftelsen? (The Archipelago Foundation) and is a part of the larger EU-project ?Green Islands?.A model for the plants total heating demand is established in order to get a good perception of how much money can be saved using alternative heating methods. The heating demand model gives an annual heating demand of approximately 32 500 kWh and a maximum heating power demand of around 24,7 kW.
Säkerhetsanalys av brandbekämpning i kritiska utrymmen på Forsmark 1
In order to maintain a high safety level at a nuclear power plant it is important not only to measure the reliability of the components and systems of the plant, but also to investigate how the plant responds to human actions. One of the most hazardous situations in managing a power plant is fire occurring in critical areas. This study concerns the prospect of the local fire brigade to suppress a fire that has started in one of the most critical rooms for maintaining high reactor safety. The model created gives an indication on the possibilities of succeeding in suppressing a fire. In order to get a more reliable fire fighting the following advice are given:- Let the fire brigade go rounds in the plant together with the personnel, during which recommended fire suppressing methods are determined to avoid long preparation time in an actual situation.- Prepare rooms with two subsystems to make them partly with no voltage.- Give the fire brigade better feedback from actual events on nuclear power plants.- Education and training in suppressing fires in electrical equipment.The probabilistic safety assessment strives to be as realistic as possible.
Statushantering i Virtual Map med ledningssamordning i BIM
For many years, the construction industry in Sweden has not developed much of an integral approach for design across disciplines. The sector?s impact on society, economics and environment is huge. To make the interactions within the construction industry more efficient, a relatively new concept called BIM (Building Information Modeling) has been introduced. The idea with BIM is that the different actors of the construction industry will work through intelligent CAD software, with common file formats and more cooperation between different actors during the various steps of the building and construction process.The technical consultancy company WSP Sweden is working actively to implement BIM within the frame of its activities.
Biogasanvändning vid Käppalaförbundets Reningsverk: ? en värdering av miljöeffekter
This thesis calculates and compares the values of improved environmental quality due to future possible investment alternatives in biogas production facilities at Käppalaförbundets Reningsverk (Käppala Sewage Treatment Works) in an attempt to determine which alternative yields the highest such value. Käppala faces three investment alternatives for the usage of biogas. The alternatives are production of vehicle fuel, district heating and thirdly, heat and power production. Estimates of the value of environmental change are calculated for each of the three investment alternatives, and these estimates are then compared. The environmental change in question is the change in discharge levels of carbon dioxide (CO2), nitrogen oxides (NOx), sulphur dioxide (SO2) and particle matter.
Rening av avloppsvatten från biltvättar med filter av torv och inblandad kolaska : en utvärdering av effektivitet och avfallshantering ur ett miljöperspektiv
Filtermaterial av 75 % torv och 25 % kolaska har använts under 2 respektive 4 år för rening av avloppsvatten från två biltvättar. Jämförelse med Kristianstads kommuns riktvärden för avloppsvatten från fordonstvättar visar att filtren fungerat. För avfallsklassning krävs kunskap om innehåll av miljöfarliga ämnen i produkter som använts i tvätthallarna. I brist på kunskap om innehåll av ej analyserade miljöfarliga ämnen i filtren anses förbränning vara ett bra omhändertagande ur miljösynpunkt, då energi och aska återvinns..
EN MILJ?STUDIE OM DE GEOKEMISKA F?RH?LLANDENA I SK?RHAMN, SVENSKA V?STKUSTEN
The following study aims to investigate the environmental conditions of the harbor of Sk?rhamn, a small fishing community on the west coast of Sweden. The interest to do so rose as a newly built apartment residence failed to connect the sewage pipes of 18 apartments, causing the untreated sewage running into the sea. The parameters accounted for are the C/N ratio, total organic carbon (TOC) as well as total nitrogen present (TN) and ?13C in the top ten centimeters of a sediment core retrieved in the Sk?rhamn harbour.
"De tycka emellertid av gammal vana att det smakar gott, och tro dessutom att det är bra för hälsan" : samiskt växtutnyttjande från 1600-talet fram till ca 1950
Meat and fish was the most important food for the Sami people in northern Scandinavia until the beginning of the 20th century. It is not so well known that the Sami people also used a lot of wild plants as food and medicine although that kind of food was relatively common among them until the end of the 19th century. The purpose of this master thesis has been to describe which plants the Sami people used in general and also which plants were the most commonly used, and when and how these plants were harvested. I also wanted to measure the quantities of Angelica archangelica and Rumex acestosa within traditional harvest sites. Furthermore I wanted to find out if the plant use differed among Sami groups geographically.
Ersättning av Ringhals 3 med ett biobränslekraftverk
This study deals with the technical and economic feasibility of replacing the nuclear power plant reactor Ringhals 3 with a biofuel power plant. A technical investigation has been executed to determine which of the systems and components that could be reused and which ones would need to be replaced. The investment costs of the reconstruction have also been estimated. The cost of the electricity production has been calculated as well as the emissions of the new biofuel power plant. Based on the established rate of return, the lowest average spot price of electricity that makes the investment profitable has been calculated.
Plantinventering och plantkontroll med digitala bilder från helikopter :
This study was carried out as a commission from Holmen Skog, district ?Egen skog? in Norrköping. During October 2006 several stands were inventoried by aerial photos from helicopter. The stands were those for which the next action proposed was plant inventory or plant check. The photos were interpreted and the number of stems was calculated.
Simulering av vindkraftverk och närliggande elnät vid Risholmen i Göteborg i SimPowerSystems
With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.
Turbinkretspump system - Kraftvärmeverket i Borås
The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.