Sökresultat:
4271 Uppsatser om Plan- and construction law - Sida 54 av 285
Differentiering och framgångsfaktorer på en ständigt växande marknad : Undersökning av bemanningsbranschen
Today it is mandatory for every college or university student to pay a union fee to their student?s union. The fee is mandatory and is a payment for writing examinations, receiving grades. The fees purpose is also intended to secure the education quality and student influence. In the presence of the abolishment of the union fee the Swedish student?s unions stand before an uprising competition between themselves and most likely a decrease in membership.
10-åring spårlöst borta : En studie om hur försvunna barn konstrueras i svensk press
The purpose of our study was to examine how missing children are portrayed in media. We wanted to see if there are any recurring story patterns and characters in the texts. We also wanted to examine how the relationship between children and adults are framed and which comprehensive view of children is mediated in journalistic texts.Our questions were: how do Swedish newspapers write about missing children? Which narrative pattern are there in the texts? How are children and adults represented in the texts? What relationship between children and adults are made visible in the texts? What a comprehensive approach to children is constructed in the texts?For this study, we used the media discourse, theories of representation, stereotypes and characters. And theories of narrative, dramatic turns and opposites.We chose to make three case studies in which children suddenly disappeared, the case of Bobby Äikiä, the case of Engla Höglund and the case of Sebastian Hedman.
Konstruktion av steghållare till brandbilar
High demands are set on all equipment used in emergency service work, where small margins can be the distinguishing factor between life and death during a rescue operation. It is important that tools such as ladders quickly and easily can be dismounted from a vehicle and still satisfy the regulatory requirements for securing loads during transport. The existing solution for getting ladders down from the roof of a fire engine requires a large manual effort from the user in an ergonomically unsound posture.In this degree project a new ladder holder is developed with focus on the user to solve the ergonomic problems and at the same time create a more compact design that can be adapted to several different types of ladders. After an initial pre-study with user-interviews and measurement of forces and distances a set of requirements was formulated that came to govern the project's direction. Creative methods were used to generate concepts that improved the function and through design solutions, calculations and testing in CAD a base for manufacturing of a new product was created.The result is a completely new type of ladder holder that minimizes the user's manual effort and simplifies the securing of ladders in the holder.
Samverkanspelare i icke bärande fasadelement
AbstractThe tests work is about the subject "synergism of steel and concrete."The construction sector is in a strong competition and the different companies in the PrefabMarket has ever tried to develop new design solutions that are efficient and environmentallyfriendly.The purpose of this report is to highlight different aspects of interaction and size up a columndimension and to examine its efficiency and load capacity as Eurocode 3 and Eurocode 4. A sizing chart that describes the relationship between the torque and normal force shouldalso be made of the interaction . .
Den utdragna byggprocessen - En studie av utredningar i planprocessen
Under de senaste åren har planprocessen legat i fokus. I Stockholm råder en stor bostadsbristoch de långa planprocesserna som kan sträcka sig upp till fem år eller mer har medfört att ettantal utredningar och rapporter har genomförts för att se vari problemen ligger. De långa ochkomplicerade planprocesserna medför även att konkurrenssituationen mellan byggherrarpåverkas då enbart de större byggherrarna har den tid och resurser att genomgå dennautdragna process. I den nya plan- och bygglagen som infördes 2 maj 2011 fanns en delförändringar som hade som mål att effektivisera denna process men än finns det utrymme förförbättringar.I vårt examensarbete har vi analyserat tre projekt i tre olika kommuner för att se huruvida deutredningar som krävs skiljer sig mellan kommunerna. Kommunerna vi har valt är Stockholm,Solna och Södertälje och för att få en mer nyanserad bild har vi pratat medstadsbyggnadskontoret i Södertälje kommun samt två exploatörer i Stockholm och Solna omderas syn på processen.
En arbetsmiljöutredning för yrkeschaufförer hos Schenker Åkeri AB i Halmstad
The project has been done in cooperation with Schenker Åkeri AB in Sweden, Halmstad. Theproject is based on an inspection made by Arbetsmiljöverket, where they found minorshortcomings with distribution of goods for the employees. The project is an investigation ofthe drivers? working environment.Schenker Logistics is one of the world's leading providers of integrated logistics services.Schenker Åkeri AB is a subsidiary to Schenker Logistics and transports 2.4 million tons ofgoods yearly.The project started with a background study to evaluate drivers working environment. Wehave studied goods receptions, the working environment, strain injury and injury mechanisms.Methods used was observations, tests, questionnaire surveys and ergonomic andbiomechanical calculations.One result of the study is a working model, which gives recommendations for the maximumweight a driver should push and pull.
GC-port, Munksund
Analys och projektering av en säkrare överfart för cykel- och gångtrafikanter. Övergångsstället är beläget på Munksundsvägen i Piteå. Det aktuella övergångsstället som idag ligger i samma plan som väg 507, trafikeras till stor del av barn och vuxna på väg till eller från Pitholmsskolan. Övergångsstället upplevs idag som svårpasserat..
Prefabricerade Passivhus
European Union has made a new decision that all new built houses by 2020 shallbe near-zero energy houses. Boverket?s definition of near-zero energy housesintends buildings with good energy performance in which a proportion of theamount of energy that must be added to the building is made of renewable energy.Passive House is a set of requirements from FEBY designed to build energyefficient buildings. This is achieved by reducing loss of heat through the buildingenvelope and to take advantage of the passive heat from solar radiation,installation and heat sources like people living in the house.This project has been made with help of Anebyhus and one of their model houseshave been examined from the report?s issues, including Anebyhus?s energyperformance, requirements for the manufacturing and assembly, how theenvelope must be improved to fulfill the requirements for the Passive House andwhat energy calculation programs are available on the market.The report aims to provide solutions for energy efficient houses that are adaptedfor production of house building.Two visits to Anebyhus has been done to study their manufacture and assemblyof building elements.
Mek Stans 07
Mek Stans 07 is a machine developed for Tetra Pak in Lund as a 10p candidate theses project at Halmstad University. The commission behind the project involved development of a machine that punches holes in packages for the inspection division at Tetra Pak. The task for the machine was to facilitate the process of making openings for testing in the company?s other equipment.
Researches on different methods of cutting, types of automatization and possible designs were made. To implement the project a design and construction from the base where chosen.
Vargaslätten, ett trädgårdshistoriskt arbete, fokus 1989 - 2009
Vargaslätten is a 15 hectare large privet garden in Halland in the south-west of Sweden.In the beginning of the 1990s Gunnar O.Westerberg, the owner of Vargaslätten,commissioned a work from the young landscapearchitect, Rolf Efvergren, to writeVargaslätten ? tillägnad naturen. It was a discribing work of the current status of the gardenand the summer-house of Vargaslätten. Vargaslätten ? tillägnad naturen was acomprehensive work with a detalied inventory of all the plants, the buildings, the descriptionof the surroundings and the history.
En kartl?ggning av inv?ndiga f?nsterluckors utbredning och konstruktion
Interior window shutters can be found in historical buildings, but they are an uncommon occurrence in
modern buildings. In modern contemporary construction, large glass panels are often the ideal because
of increased light inflow and for architectural purposes. However, this can generate several negative
effects, such as increased energy loss, lack of privacy and high sunlight penetration. Problems that
window shutters could have accommodated historically.
This thesis identifies a lack of knowledge about interior window shutters in the Swedish building
stock.
Underlag till marknadsplan för Umeå Studentkår : inför avskaffandet av kårobligatoriet
Today it is mandatory for every college or university student to pay a union fee to their student?s union. The fee is mandatory and is a payment for writing examinations, receiving grades. The fees purpose is also intended to secure the education quality and student influence. In the presence of the abolishment of the union fee the Swedish student?s unions stand before an uprising competition between themselves and most likely a decrease in membership.
Hur hushållas det med mark och vatten? en studie av tillämpningen av hushållningsbestämmelserna i 3 och 4 kap MB
The national spatial planning guidelines and the subsequent legal regulation in the Natural Resources Act and the Environmental Code has been a part of the Swedish planning system for almost 40 years. In the recent years, critics have claimed that the regulations are outdated and does not work the way it was intended. This paper examines closer why it is perceived that the regulations does not work, with a focus on how the national interests are managed in the municipal planning. Why is the national interests not applied in the municipal planning as intended? Is the error in the system or in the implementation of it? The aim of this essay is to study the gap between theory and practice by studying how the land management provisions in the Environmental Code is applied in five selected municipalities.
Ämnestransport med grundvatten i hydrogeologiska typmiljöer
Certain types of waste, e.g. bottom ash originating from municipal solid waste incineration (MSWI bottom ash) can be used as road construction materials. A potential problem is the possibility of substances leaching out of the road and spreading in the surrounding groundwater.The aim of this master?s thesis is to conclude whether hydrogeological type settings can be employed to, based on local conditions, provide an estimate of the probable spreading of these substances in the surrounding groundwater, and whether certain types of soils can be identified as being less suitable for the localization of a MSWI bottom ash road. A hydrogeological type setting is defined as a mappable unit with similar hydrogeological properties.
Plan för multifunktionella buffertzoner längs Vramsån på Malörten AB: s jordbruksfastigheter
To create multifunctional buffer strips along a watercourse in an economically sustainable way requires consideration of many different factors. In this plan we have selected pollutant reduction as the main purpose of the buffer strip. We have also strived to achieve minimal income loss due to reduced production, increased biological diversity, good game preservation that leads to higher income from hunting, aesthetical satisfaction and possibility to profit from available subsidies. This is done mainly to make landowners/farmers more interested in creating buffer strips along water courses.
As sand is the dominant type of soil in the area, the water course is less affected by surface runoff compared to if the soil would be clay or some other finer texture. Game preservation and subsidies have therefore been the main factors when establishing the width of the strip, because these require wider buffer strips in some cases.