Sök:

Sökresultat:

5282 Uppsatser om Motor Control and Perception (DAMP) Komplicerat lärande - Sida 20 av 353

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Prognostisering av höga grundvattennivÄer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

KvalitetssÀkring av efterinjektering. En fÀltstudie i NygÄrdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Barnets rÀtt att komma till tals. : Om barnets inflytande i verkstÀllighetsprocessen.

Syftet med studien var att ta reda pa? hur man kan fra?mja lek fo?r barn med autistiska symptom som bor pa? korttidsboenden. En kvalitativ intervjuunderso?kning gjordes med sex deltagare och analyserades sedan genom en tolkande fenomenologisk analys (IPA). Fyra huvudteman med tillho?rande tva? underteman var valdes ut.

Kontrollerad verksamhet? Vilka faktorer pÄverkar utformningen av intern kontroll i kommunal verksamhet?

The purpose of this essay is to examine which factors that influence the design of internal control in municipal context and how well it works. We choose seven municipals, where we interviewed the administrative managers, the chairmen of the committees and two persons of the staff in each activity unit. The interviews were performed by telephone, due to the keeping of the essay?s timeframe.The theory in our essay comprises eight hypotheses. These hypotheses were operationalised into different variables aiming to make statistical tests possible.

Man mÄste frÄga sig, vad Àr normalt och vad Àr inte normalt?: en kvalitativ studie angÄende yrkesverksamma tankar kring Aspergers syndrom, dess förhÄllande till högfungerande autism, diagnostisering och prognos

What compelled me to write this essay was the ongoing debate about DAMP/ADHD between mainly Eva KĂ€rfve and Christopher Gillberg. The purpose of the essay was to ascertain whether there was a similar debate about Asperger Syndrome. My focus was on the causes of the syndrome, how Asperger Syndrome relates to high-functioning autism, how the causes of the syndrome are portrayed by the practitioners to those who have been diagnosed with it and their next of kin, how they view the prognosis of individuals with Asperger Syndrome and their thoughts about the method of diagnosis. To gather the material I have used semi-structured interview guides and qualitative interviews. Five interviews were carried out with six practitioners.

Religionens plats i arbetslivet enligt Europakonventionens artikel 9 och Europadomstolens praxis. KlÀder och symboler med religiös prÀgel inom anstÀllningen.

Syftet med studien var att ta reda pa? hur man kan fra?mja lek fo?r barn med autistiska symptom som bor pa? korttidsboenden. En kvalitativ intervjuunderso?kning gjordes med sex deltagare och analyserades sedan genom en tolkande fenomenologisk analys (IPA). Fyra huvudteman med tillho?rande tva? underteman var valdes ut.

Om rÀttigheternas grÀnser. TillÀmplighet pÄ nationell nivÄ för Europeiska Unionens stadga om de grundlÀggande rÀttigheterna

Syftet med studien var att ta reda pa? hur man kan fra?mja lek fo?r barn med autistiska symptom som bor pa? korttidsboenden. En kvalitativ intervjuunderso?kning gjordes med sex deltagare och analyserades sedan genom en tolkande fenomenologisk analys (IPA). Fyra huvudteman med tillho?rande tva? underteman var valdes ut.

Att lösa reglertekniska problem med Modelica

The purpose of this thesis is to examine and present the oportunities of solvingcontrol problems using Modelica. This is done by creating some demonstrationexamples with exercises. These examples should cover as many types of controlproblems as possible. The exercises are aimed for people with basic knowledgein modeling and automatic control engineering but with little or no knowledgein Modelica. There are different types of Modelica implementations and the onesused in this thesis are OpenModelica and MathModelica..

Metod för berÀkning och jÀmförelse av lönsamhet för trafiksÀkerhetsÄtgÀrder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av lackeringsbox. Utredning av ventilationssystem med ÄtgÀrdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Bostadsbyggande i Skövde fram till Är 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Avtalsvillkor i konsumentförhÄllanden - sÀrskilt elektroniska avtal pÄ internet

Syftet med studien var att ta reda pa? hur man kan fra?mja lek fo?r barn med autistiska symptom som bor pa? korttidsboenden. En kvalitativ intervjuunderso?kning gjordes med sex deltagare och analyserades sedan genom en tolkande fenomenologisk analys (IPA). Fyra huvudteman med tillho?rande tva? underteman var valdes ut.

<- FöregÄende sida 20 NÀsta sida ->