Sök:

Sökresultat:

1080 Uppsatser om In-plant logistics - Sida 2 av 72

Logistik i byggbranschen : Fo?r fo?rba?ttrad arbetsmiljo? och effektivitet

Logistics and supply chain management in the construction sector is an area with great potential for improvements. Today, a lot of the workers time is spent on non-value adding activities. Research has shown that waste is a large proportion of the total production cost in building projects today.The purpose of this report is to analyze problems concerning logistics in the construction sector. Two of Skanska?s construction projects in Uppsala have been analyzed to identify problems.

En studie i hur järnvägens möjligheter kan appliceras inom AB Volvo : med hänsyn tagen till företagets logistikkrav

In the year of 2011, the new CEO of AB Volvo announced a major reorganization. This reorganization was a contributing factor to the start-up of this thesis.Volvo Group Logistics Services (VGLS) is Volvo Group?s global logistics partner, which designs, manages and optimizes all of the group's incoming and outgoing logistics flows. With the reorganization, VGLS started a project regarding responsibilities around railway flows. Within the project a demand to collect logistics requirements occurred.

BIM-PROJEKTERING FÖRFÖRBÄTTRAD LOGISTIK

The construction industry depends on functioning logistics; if the logistics isn?tworking the construction site will risk to be interrupted due to material shortages orproblems with deliveries. Despite this, the construction industry is battling logisticproblems daily. This problem is very time consuming and costly for the companies.These theses are written for Peab Bostadsproduktion and investigate if it is possibleto focus on logistics earlier in the building planning process to reduce the problemsthat occur. Peab has partnerships with three companies that could be helpful for themin the work of reducing logistic problems.

Logistik

The construction industry develops at a high pace today. Because of this the construction companies has to rethink and try to develop at the same pace. One of the biggest challenges in the construction industry today is to improve the logistics since improved logistics leads to lower costs. This is something that the construction companies have started to realize and they are beginning to invest more money in order to improve the logistics. It is especially important to have good logistics when the conjuncture turns for the worse.

Transport och terminalhantering av plantor på Södra

This study has been carried out at Södra´s 31 local forestry districts and within six plant terminals. The production and sale of seedlings at Södra is managed in collaboration with ?Södra Odlarna?. Approximately 35 million plants are cultivated each year, providing Södra´s members with a wide choice of high quality plants. The seedlings are nurtured at nurseries before transferred to plant terminals where they are stored and watered.

Hur påverkar logistikplaneringen byggarbetsplatsen? : En enkätundersökning om logistikkostnader i produktion

Logistics planning for a construction site is usually limited by traffic flow to and from the workplace. The geographical location of the construction site is determined by roads around the workplace and opportunities for well-functioning logistics. Inventory of material is often impossible because of the frequently small workspaces. As a result, a concern relating material handling remains . Even before the establishment of a construction site, it is required in the construction industry to eliminate errors that might arise in the planning stage.

Kväveomsättning i gräsmark med olika artantal och artsammansättningar :

This study was carried out at the Swedish University of Agricultural Sciences, Dept. of Agricultural Research for Northern Sweden. The aim of the study was to determine how plant species richness and diversity influence the nitrogen pools and nitrogen fluxes in the soil. Plant and soil samples from a biodiversity experiment in grasslands were used. Thirty plots with 12 grassland plant species (legumes, grasses, and non-legume herbs), combined from 1-12 species were investigated.

Inventering av processvattenbalans : fastställande av fjärrvärmedistributionens läckage inom Vattenfall Värme Uppsala AB

Heat is distributed to the district heating customers through pipes with water as a heat carrier. The district heating system is complex. To decide what is leakages from the district heating net versus what is the water consumption of the plant, is difficult. Therefore, the purpose of this master thesis is to establish a model where the district heating net?s leakages but also the water consumption of the plant can be followed daily. The project is performed at Vattenfall´s district heating power plant in Uppsala. Information is gathered through discussions, drawings of the plant and guided tours of the plant.

AB Volvo Pentas emballagesystem - processen och förpackningslogistisk betydelse

Title AB Volvo Pentas packaging system ?process and packaging logisticsAuthor Peter Powell, Lund's Technical CollegeSupervisors Annika Olsson, Lund's Technical CollegeJan Svensson, AB Volvo PentaProblem - Packaging requirements ? Which requirements are there, how do they affect each other and how are they fulfilled?- Packaging process ? what is the line of action when developing new packaging and making adjustments in existing ones? Who has the responsibility to do what?- Packaging logistics ? How is the packaging system adapted to transport efficiency and handling?Objective To create an overall picture over how the packaging system affects and is affected by different functions and players within and beyond the company boundaries, to give a clear picture of how changes in the packaging system is made today and how it could work and finally to give suggestions for cost savings affected by the packaging system.Method The methods used for this thesis has mainly consisted of action research and at some extent case studies. As a previous employee at the department of logistics at Volvo Penta I?ve taken part of the environment, information and prerequisites that this thesis discusses on a daily basis. Case studies have been used for the collection and analysis of data concerning packaging logistics as I?ve chosen to consider only specific markets and packaging.Conclusions This thesis has highlighted the demands that are placed upon engine packaging throughout all concerned units and how these demands affect each other, positively and negatively.

Vad styr kundens val av emballage och vilka faktorer påverkar kundens emballagekostnad? - inom fordons- och tillverkningsindustrin

Title: What drives the customer's choice of packaging and which factors influence the customer's packaging cost? ? in the automotive and manufacturing industriesAuthor: Lena AnderssonSupervisors: Annika Olsson, Division of Packaging Logistics, Lund Institute of TechnologyHelena Claesson, Volvo Logistics ABProblem: Which parameters are important for logistic people to think of when they are going to choose a package?Which cost factors are included in the packaging cost?What kind of added value can an emballage supplier provide their services with?Purpose: The purpose of the project was to study the parameters that drives the customer's choice of packaging and the factors that influence the total packaging cost. The study also consists of a valuation of what an emballage supplier can offer to add value to their services.Method: The study is based on interviews with people who are working at Volvo Logistics and Volvo Car Corporation. Volvo Logistics provide their customers with standard packaging material, which they own and administrate. Volvo Car Corporation is one of their customers.

Mekaniskt snytbaggeskydd

Insecticides will be removed from Swedish forestry, at present insecticides are used to treat our seedlings to avoid them from being attacked by pine weevils. With the forthcoming ban on insecticides alternative protective measures will have to be tested. Holmen Forest Ltd has aimed to find an alternative and have developed a mechanic pine weevils protection accessory as well as a new concept on planting pipes. Studies have been conducted on the behalf of Holmen Forest Ltd to see how planting with the newly developed mechanical protectors and plant pipe stands up against the conventional methods used today. The study was conducted over a three week period. Three factors were compared regarding planting quality including i) pressure around the plant, ii) the depth the plant ended up in, iii) plant angle. Mechanical plant pipes were used in the study, and where tested like a one-handed and a two-handed pipe. The study concludes that further development is needed for the mechanic plant protector to live up to the speed and quality of conventional methods.

Kontrolltorn : En informationslösning för tredjepartslogistik

The demand for shorter lead-times and increased delivery reliability puts pressure on companies to provide more efficient logistic services. One strategy to deal with this demand is by outsourcing logistics to a third part. The development of logistics information systems enables increased control over business supply chains. This is why Green Cargo aims to create a Logistics Control Tower (LCT) solution to provide it?s customers with better information with higher availability.

Studie i att ersätta kärnkraftsreaktor med biobränslealternativ

This report contains a study of replacing nuclear power with biofuel. The nuclear plant, OKG north of Oskarshamn in Sweden has been chosen and an extensive literature study about the nuclear plant has been implemented. The main aspect of this report is the availability of biofuels and whether it would be economically sustainable. Sweden?s most common biofuels are examined with regard to scope of use and potential.

Logistisk tillämpning idag : en historisk återblick

In the rate of changes condition of the market in shape of increasing competitiveness situation, local as global, this leads to that logistics has to be developed in the same rate. Logistics has been developed from the military and after the war, logistics was figurative to the companies transport- and store problems. After this, logistics had been divided up into four different time phases (the seventies to the 21:th century). All these time phases have together develop the spectacle and focus of the logistics today. Afterward further developing of the logistics approach to Supply Chain Management (SCM) and afterward SCM, Demand Chain Management (DCM) was developed in aim to secure that the right products were manufactured on the basis of the end customers real requirement and wishes.This paper is taking the aim and problem formulation as a starting point.

Självgående fordon hos Sandvik do Brasil

At the plant of Sandvik do Brasil in São Paulo there is a need for improving the transport of inserts between the plant building and the stock building. The idea is to install a system with an Automated Guided Vehicle (AGV) to take care of this transportation. The purpose of this report is to present which demands there are on the system and to find the best solution according to the demands.To conclude this work a study was made of the plant and the AGV technology was examined. Several providers of AGV solutions were contacted to get information about prices and detailed solutions.The conclusion was that the most suitable system for this application is a small unit load vehicle using inductive wire as guiding system..

<- Föregående sida 2 Nästa sida ->