Sök:

Sökresultat:

1080 Uppsatser om In-plant logistics - Sida 3 av 72

Solenergi på Nya Karolinska Solna

In today?s society climate change has grown to one of the largest global issues. To reduce emissions of greenhouse gases, large changes of the energy system are required. An increasingly popular solution is investments in local production of renewable energy resources like wind, solar or geothermal power. The following report examines the possibility for implementing a solar power plant on the new hospital Nya Karolinska Solna. Two different technologies for extraction of solar energy has been studied, solar thermal collectors  to meet the need of heating and solar cells to satisfy the need for electricity linked to operating the hospital building.

Flödeslogistik vid Laponia Hotel

The aim of this report is to analyse the logistics of a medium sized restaurant and give an overall solution for improvements on the restaurant's logistics. The restaurant of interest belongs to Laponia Hotel and is located in Arvidsjaur, Sweden. Investments for over 100.000 Euros are planned for the hotel, which includes a reconstruction of the restaurant. The details on how the restaurant will be reconstructed are not yet known. I therefore chose to analyse the problemin general terms and find a solution that is focused on the logistic system itself rather than its layout.

Forsmark 3 ?Ett Framtida Biobränslekraftverk?

Recent turmoil surrounding nuclear power as an energy source, especially since the accidentat Fukushima, has largely contributed to the debate of whether or not nuclear power should beused as an energy source. This study has examined the economic feasibility of replacingForsmark?s 3rd nuclear reactor with a bio fueled power plant, and find out how this could bedone.The power generation that has to be replaced is equal to 1170 MWe. To replace this, 6 largescaleCFB-boilers, each providing over 200 MWe, were necessary. In addition to this, eachboiler required their respective turbine sets, comprising one high-pressure-, and one lowpressureturbine with intermediate reheating capacities.Based on this, a rankine-cycle was modeled using the software EES, to be able to calculatethe total heat required in the power plant.

Kalkyl för logistikkostnader; från leverantör till förbrukningsplats

The globalization that has occurred during the last few years has made it more important for companies to have a well-functioning logistics system. Customers demand more options, which lead to an increased flow that creates greater demand regarding packaging and transports. Diverse logistics costs are nowadays a substantial cost for many companies. Therefore, more effort is aimed at optimizing transportation to lower these costs.The purpose of this project is to create a user-friendly calculation of logistics costs that illustrates how the costs vary, depending on how the flow is structured. This is done by examining which aspects that affect the total logistics costs and by mapping which aspects that should be included in a calculation of the logistics costs.Literature studies have been carried out parallel with empirical studies at Scania's production unit, MC, in Oskarshamn.

Fjärrvärme - ny lokalisering av kraftvärme i Enköping

The municipality of Enköping is presently working out a new layout plan for the town of Enköping and new residences are planned in the harbour area. Because of these plans, the municipal energy company ENA Energi may have to move its location from the harbour to another part of the city.The aim of this degree project is to investigate the possibility of building a new CHP plant in another area of Enköping. The future demand on district heating and infrastructure at the new location have been projected. A new CHP plant has been dimensioned and economic analyses concerning the project have been made.Results show that the future demand of district heating in Enköping will differ a little from the present needs. In 2030, the district heating production is expected to be c.

Utvärdering och framtagande av åtgärdsförslag för de mindre avloppsreningsanläggningarna i Laholms kommun : En studie av fem avloppsreningsanläggningar upp till 500 pe

The aim of this project was to describe and to evaluate five small sewage treatment plants in the municipality of Laholm, Sweden, in order to investigate the treatment efficiency and to evaluate if effluents comply with discharge permits. The treatment systems were designed to treat effluents from 90 to 500 population equivalents. A report on the design and the present state of each sewage treatment plant has been made. This was made based upon previous documentation on water quality and by new sampling campaign as there were only a few previous measurements. Data has been evaluated and remedial actions proposed for those treatment plants that don?t fulfill discharge permits.

Systemidentifiering och reglering av en luftningsbassäng på ett reningsverk

A wastewater treatment plant has the task to refine the wastewater from substances that should not be released into the environment. The decomposition process can, in a simple way, be described as follows: micro-organisms breathe oxygen and eat unwanted substances. The environment in which the micro-organism lives is known as sludge and the correct amount of oxygen available in the sludge is important for the decomposition to be effective. The oxygenation of the sludge alone stands for about 30% of the plant?s energy consumption.

Handbok för växtinsamlare : med erfarenheter från sex nutida svenska experter

What makes a Swede betake himself into the Chinese wilderness? How does the Rio Convention influence a plant collector? And who will crack the nut positioned 12 meters up in the crown of a tree? There are many secrets behind the act of collecting plants. In many regards, the documentation of the collection of plants for a Swedish purpose has been unsatisfactory. The focus of the publications is on what plant species that have been found rather than information on how these plants have been collected. Only few results of experimental cultivation are available. There is no doubt that there exists knowledge that has not been publicised yet.

Energianalys av Svensk Växtkrafts biogasanläggning i Västerås

Svensk Växtkraft is the owner of the biogas plant in Västerås. The company is planning to increase their treatment capacity at their biogas plant. In connection to this work it is also possible to make some energy saving changes to the biogas plant. The objective of this study was therefore to make an electricity and heat survey of the biogas plant, a detailed study of the heat consumption in the sanitation step and also a comparison of energy consumption with the present sanitation method and an alternative strategy where the waste is treated in 55 °C during 10 hours (the current method is heating to 70 °C during 1 hour). The energy survey was conducted in close collaboration with staff at the biogas plant. The current during normal operation was measured, power was calculated and multiplied by the time of usage to obtain the energy consumed.

Växtmaterialet i 1700-talets engelska park : en växtplan för Engelska kullen på Gunnebo

Gunnebo House and Gardens was designed during the late 18th century by architect Carl Wilhelm Carlberg as a summer residence for the wealthy merchant John Hall Sr. and his family. The garden consists of formal garden, kitchen garden and English park. For the first two parts several original drawings have been preserved and here a lot of restoration work has been carried out. This paper aims to examine how the English park might have been implemented during John Hall Sr.?s time and to create a plant scheme for the area called ?Engelska kullen? (The English hill).

Fällning av kisel från avloppsvatten vid Hellisheidarvirkjun - experimentell studie

This report is about the experiments with mixing of the separated water and the vacuum pump seal water at Hellisheiði power plant. This is done to prevent silica scaling and clogging in pipes and reinjection wells as well as eliminating vacuum pump seal water from the plant. The experiments were done in four stages: the first stage comprised of tests with different flows of separated water at 70°C, the second stage was carried out by mixing the separated water at 70°C and the seal water with different amounts of the seal water, the third and the fourth stages were like the first and second but with the separated water at 120°C. The results show that this method is good if the mixture is around 50/50 separated water and seal water, to control the silica scaling in the separated water and to be able to reinject the seal water with the separated water. This does not eliminate the silica scaling in all of the separated water because the amount of separated water is much more than the amount of seal water that comes from the plant. .

Standardiserat utförande och förbättring av avropsprocessen : En fallstudie på Balco AB

Course: Degree project in logistics, 4FE05E, spring 2013Author: Maria WennbergSupervisor: Petra AnderssonExaminer: Helena ForslundTitle: Standardization and improvement of the outbound process execution Background: Transportation represents a critical part of companies? logistics. Special management and control is needed when using a third party logistics. Balco uses a third party logistics for their deliveries of balcony parts and before it takes place the outbound process is executed. Currently, Balco experience difficulties with the process? many ways to be performed by the project managers and logistics department.

Ekonomiska konsekvenser av etanolproduktion i östra Sverige : en analys ur lantbrukarens och förädlingsföretagets perspektiv

This study analyses the economic consequences due to ethanol production in Eastern Sweden. The analyses consider the cooperative and the farmers as one vertically integrated company. The area that found the market in this study is illustrated in figure 1. The analyses assume that all members act jointly with the objective of maximizing joint profits at the farm level as well as at the cooperative firm. A mathematical model is created to calculate the optimal use of arable land.

Mjuka Värden - Det humana kapitalet.

The purpose of this essay is to analyse and evaluate human relations within organisations in purpose to achieve higher productivity. Both research objects gained interest in this essay due to how their own result should be effected and their own values but the writers also detected a little curiosity on how the competition handled these questions. The essay have progressed in the following steps: first the authors have tried to find a problem definition and a scientific ground to work from. After that an extensive literature study were done to be followed by an mapping of apparition on the human relations on Scania motorverkstads logistics department and Volvo Logistics by interviews of the people in charge in these organisations. To see whether there was a unanimous line of thoughts between the management and the employees the authors made questionnaires to the different department.

Säkerhetsanalys av brandbekämpning i kritiska utrymmen på Forsmark 1

In order to maintain a high safety level at a nuclear power plant it is important not only to measure the reliability of the components and systems of the plant, but also to investigate how the plant responds to human actions. One of the most hazardous situations in managing a power plant is fire occurring in critical areas. This study concerns the prospect of the local fire brigade to suppress a fire that has started in one of the most critical rooms for maintaining high reactor safety. The model created gives an indication on the possibilities of succeeding in suppressing a fire. In order to get a more reliable fire fighting the following advice are given:- Let the fire brigade go rounds in the plant together with the personnel, during which recommended fire suppressing methods are determined to avoid long preparation time in an actual situation.- Prepare rooms with two subsystems to make them partly with no voltage.- Give the fire brigade better feedback from actual events on nuclear power plants.- Education and training in suppressing fires in electrical equipment.The probabilistic safety assessment strives to be as realistic as possible.

<- Föregående sida 3 Nästa sida ->