Sökresultat:
49 Uppsatser om FB-boiler - Sida 4 av 4
Systemanalys flingtork : Produktionseffektivisering
BillerudKorsnäs is a leading global provider of primary fiber-based packaging materials and on Gruvöns Bruk in Grums, they have chosen to invest millions in the boiler at the facility to increase the total capacity of the factory. This results in the Pulp Flash Dryer at Gruvön being burden more, which makes it important that it is of great reliability and can be run with a high capacity. The reliability of the Pulp Flash Dryer at Gruvön is not as good as one could hope, which leads to reduced availability and production, as well as to increased maintenance costs. There are a number of different reasons for this, but all the casual links are not known.The purpose of this project was to perform a system analysis of the Pulp Flash Dryer to identify bottlenecks and the most critical parts from a capacity- and availability perspective. Appropriate methodology for the system analysis was used and would be used in a structured way to perform the analysis with data from the process and the maintenance system.
Inventering av förorenad mark på LKAB's industriområden i Kiruna, Svappavaara och Malmberget
The county administration asked LKAB to make an inventory of possibly contaminated sites caused by their mining activity. The inventory should be performed according to the MIFO model, a method from SEPA which is used to assess a contaminated site. The first phase involves collection of information through interviews and site inspections and in phase 2 a general survey with field sampling is conducted.LKAB started the work with the first phase of the survey during 2003. During this project the information collected in Phase 1 was evaluated and 16 of the sites were chosen to proceed to MIFO Phase 2 (six sites in Kiruna, and 5 sites respectively in Svappavaara and Malmberget). The sampling of these 16 sites was performed during week 27 2004.
Inventering av förorenad mark på LKAB´s industriområden i Kiruna, Svappavaara och Malmberget :
The county administration asked LKAB to make an inventory of possibly contaminated sites
caused by their mining activity. The inventory should be performed according to the MIFO
model, a method from SEPA which is used to assess a contaminated site. The first phase
involves collection of information through interviews and site inspections and in phase 2 a general survey with field sampling is conducted.
LKAB started the work with the first phase of the survey during 2003. During this project the information collected in Phase 1 was evaluated and 16 of the sites were chosen to proceed to MIFO Phase 2 (six sites in Kiruna, and 5 sites respectively in Svappavaara and Malmberget). The sampling of these 16 sites was performed during week 27 2004.
Kontroll av pannverkningsgrad Dåva kraftvärmeverk
Umeå Energi AB har bestämt att en kontroll av pannverkningsgraden för kraftvärmepannan Dåva 2 skall genomföras. I dagsläget genomförs en beräkning av verkningsgraden månadsvis med den direkta beräkningsmetoden. Resultatet varierar dock kraftigt månad till månad varav en undersökning med indirekt beräkningsmetod är av intresse. Arbetet genomförs för att ge en mer noggrant beräknad verkningsgrad samt utreda förlustfaktorer kopplad till pannan. Då pannverkningsgraden i vanliga fall inte inkluderar rökgaskondensering beräknades också totalverkningsgraden för att ge en mer rättvis bild av pannan samt för att illustrera dess relevans.