Sökresultat:
15846 Uppsatser om Energy management system - Sida 46 av 1057
Human resource management and labour law implications of strategic outsourcing:?Protection and motivation of employees in the European labour market?
En sammanfattning av uppsatsen på maximalt 8000 tecken..
Grön asfalt och NCC : rätt tillväxtstrategi för en asfaltproducent?
NCC ROADS Sweden east is a part of the NCC Corporation. The company mainly
produces aggregates, asphalt and concrete. They have taken the environmental issues
seriously and been working with that since the middle of the nineties. When
manufacturing asphalt large a quantity of fossil energy is needed. The company is now
about to make further progresses by manufacturing environmental friendly asphalt
(?green asphalt?) with using bio-energy.
Biogaspotentialen av matavfall sorterat ur hushållsavfall.
To achieve the Government's milestones for 2018, which means that 50 % of food waste shall be separated from household waste and undergo biological treatment (composting or anaerobic digestion). Hultsfred, Högsby and Vimmerby are three adjacent municipalities of Kalmar, county Småland. During 2012 and 2013 analyzes were performed on their household waste to determine its composition. The household waste is currently collected in one fraction. The work, examines how much food waste the household waste contains. From the amount of food waste, the biogas potential is examined - how much food waste biogas generates and how much energy it corresponds to. Food waste is broken down by microorganisms under anaerobic conditions (anaerobic digestion) in a biogas plant.
Föroreningskällor till sjön Anten. En kartläggning och kvantifiering av kväve- och fosfortillförsel
The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.
MILJÖCERTIFIERINGSSYSTEMET MILJÖBYGGNAD I PRODUKTIONEN : En fördjupning inom området ?Material?
The environmental assessment system Miljöbyggnad is a Swedish system initiated by Bygga-Bo-Dialogen to assess buildings with regards to three main areas; ?Energy?, ?Indoor climate? and ?Materials?. A building can obtain three different classifications depending on how well it manages to meet the demands. GOLD is the highest classification and is followed by SILVER and BRONZE. The majority of the measures needed to comply with the demands are done during the design phase.
Viktoptimering av ett kompositchassi till en multimodal lättviktsfarkost
This report describes the master thesis project ?Weight Optimization of a Composite Chassis for a Multimodal Lightweight Vehicle? which is a part of the Master program in Naval Architecture and a part of a research project at the Centre for Naval Architecture, KTH. Demands on smart and energy efficient transport solutions are continuously increasing. In the Stockholm region the citizens are expected to increase with 25% and the road vehicles with 80% until 2030, putting high demands on the traffic system. Using a small multimodal vehicle deals with this problem and uses both the land and waterways for transportation.
En studie av olika ekonomiska modeller för mångbruk baserad på vindkraft
Today produces the wind power 2,5 TWh (TWh = terawatt hours) of Sweden?s total energy input of around 620 TWh. The Parliament has adopted a national planning objective where the wind-based electricity production will increase to 30 TWh in 2020. This requires that landowners will leas there land for wind power to wind energy companies. Such land leasing means that the landowner's business is considered to be a multiple-use.
ENERGI- OCH KOSTNADSEFFEKTIVAMATERIALVAL I VÄRMESYSTEM : En jämförelse av rörmaterial i vattenburna värmesystem
The thesis aims to compare differentpiping materials in heating systems interms of cost as well as to illustratethe impact of energy characteristics ofdifferent materials over its servicelife. The methods used for costcalculations regarding piping are alsoto be examined to highlight thedifferences between template basedcalculations and more carefully executedones. The work is delimited to discusspipes of steel, copper, plastics andcomposites. The aim is that the resultcan be compiled to illustrate the prosand cons of various materials whenevaluating investments.The main object of the survey is part ofa heating system in the office-block KVSommaren located in southern Stockholm.The configured piping system is designedwith the mentioned piping materials andis used to make up the data for flow andcost calculations. The differentmaterials are calculated in both aconventional manner with a supplementarycost for additional fittings and with amore accurate quantification of thecomponents.
Hur håller jag i 30 år? Vad krävs av mig som lärare?
AbstractThe future of ethanol is depending on good solutions for the production. ENA energy power plant produces electrical power and district heating by heating biofuel. By building an integrated bioenergy plant surplus steam could be used to produce ethanol as fuel to vehicle.This would mean that ethanol is produced renewable energy and the energy for the process derives from the surplus of power. ENA energy, MDH (the University of Mälardalen) and the energy authority has initiated a research project were different bioenergy combinations integrate with existing power plant. As a part of the project which size an integrated factory should be to gain the best efficiency for the plant was investigated. Consideration will be taken to the cost of the production in order to be competitive to the price of imported ethanol. Etanolens framtid vilar på bra lösningar för framställning. I ENA energi kraftverk i Enköping produceras el och fjärrvärme genom eldning av biobränsle. Genom att bygga ett integrerat bioenergikraftverk där skulle man kunna använda överskottsånga till att framställa etanol som fordonsbränsle.
Energiinventering av Soldathemmet
This examination paper is an energy-inventory of Soldathemmet at the regement in Halmstad, in colaboration with Fortifikationsverket in Halmstad. The building is first an foremost for the soldiers, where they can go for a cup of coffee or watch TV. There is also a museum and a drivers school in the building. Calculations have been done with two computerprograms; VIP+ and ISOVER Energy. The results were well matched with the statistics that were provided by Fortifikationsverket.
Konflikten mellan bevarandekrav och tilläggsisolering : The conflict between conservation requirements and additional insulation
Sweden has formulated ambitious energy goals which signify that by year 2050 the energy usage should be halved. One of the objectives is the reduction of energy usage by 20% by year 2020 and that it should be compared to the usage of energy from 1995. In parallel with increased energy requirements for buildings the demand on housing conservation, by highlighting also buildings from the last 50 years as part of the building heritage, continues to enhance, which in theory means that there is a conflict between these.The law will never be able to point out unique buildings and PBL (planning and building act) is not especially concrete. The National Housing Board has tried to make this more concrete by the new BBR regulations though there are still an enormous variety of interpretations.This report deals with the conflict between conservation requirements and additional insulation of the building envelope and is limited to multi-residential buildings built between the years 1945 and 1975. It is the stock with the greatest energy consumption and that is where the big challenge lies.
Kreativitet som konkurrensfördel
Syftet med uppsatsen är att utreda hur en organisation kan främja och tillvarata sin kreativa potential. För att finna svar på frågeställningen tog vi till en början till oss litteratur inom kreativitets-, organisations- och förändringsområdena och identifierade därigenom åtta viktiga, återkommande faktorer för att främja och tillvarata kreativitet. Dessa är vision, kontinuitet, delaktighet, mångfald, öppenhet, resurser, kunskapsförvaltning och motivation. Litteraturstudierna gav oss underlag för en kompletterande empirisk studie. I ett andra led gjorde vi alltså en kvalitativ studie för att visa på en praktisk lösning av problemet.
Organisatorisk kunskapshantering : En fallstudie hos Polisens verksamhetsstöd
This report deals with the theory and empirical evidence of how knowledge generated within a project is to be captured and shared with other projects and the surrounding organization, after the end of a project. A number of authors have highlighted knowledge management within a company as a key component in building a unique competitive advantage and knowledge should therefore be considered a very important resource within companies. The difficulties of ensuring that knowledge generated within a project can benefit other projects are many. The nature of the project form has been highlighted as one of the biggest problems, due to the fact that budget and time requirements often restrict the propensity to work with knowledge transfer. Other difficulties that this report highlights are in particular the lack of a knowledge sharing culture within the organizations, as well as human cognitive and psychological limitations and lack of tools design for knowledge transfer.
Nyckeltal för ekologiska fotavtryck för stommar i flerbostadshus
The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.
Private Equity-bolags styrning av portföljbolag; En fallstudie av värderingsmodellens översättning till olika organisationsnivåer.
The aim of this thesis is to investigate how a valuation model of a Private Equity firm is interpreted into a management control system within the company's different organizational levels. A case study was developed based on the infra-net company Eltel. The management control systems developed by Malmi and Brown (2008)(1) was used to characterize the control systems at each organizational level. The building blocks of this system are planning, cybernetic, reward/compensation, administrative and culture. Miller and O'Learys (2007)(2) theory of mediating instruments and technology roadmaps was applied to analyze the mediating process of the valuation model.