Sökresultat:
4480 Uppsatser om Developing project - Sida 2 av 299
Produktkalendern : - en alternativ designprocess med namnsdagar som utgångspunkt.
The purpose of this work is to develop and test a design process where quick decisions and model building has a prominent role. The goal is to develop a number of products and build prototypes to be shown during the Carl Malmsten Furniture Studies spring exhibition 2012. I?m also writing a report describing my work.To reach my goal I have each day during the first phase conducted a short research and found a concept based on that days name day. Then I have continued in the workshop and worked with three-dimensional models.
Att planera, markera och dokumentera tid
For a long time I have felt that there is a lack of time planning productson the market that attracts me to use them. Therefore I wantedto explore the possibilities of developing something that I reallywanted to use.At first I tried to come up with a more general tool for planningand structuring time, different from the products that are alreadyavailable. But soon I found it more interesting to see myself as theprimary user. This way I felt that I could experiment more and Ididn?t have to take things like production, cost and possible targetgroups into consideration.As I set out with an aim to try and understand my own problemswith planning and structuring time the project became a very personalone.
Projektledares motivation och metod : Med utgångspunkt från Vrooms förväntansteori
In today?s changing environment, creation of projects by organizations has become more common. The problem is, though, that the knowledge of the subject is still limited which causes many projects to fail. This has made it extra important to have a good project manager whocanlead the project in the right direction. While doing this both the project method and the project manager?s motivation are contributing sources.
Standardisering av funktionsblock for PLC
Automationscenter & Bråvalla Elteknik AB is a company that offers the market completed total solutions where the customer can operate and monitor their production from the terminal. In these total solutions they lack standard circuit which are developed by the company and which could manoeuvre/control/monitor controlled process objects. This report defines the work of developing the most common standard circuits.The report is initiated by a short theoretical part about PLC and the PLC system, with a connected terminal, which has been used. Thereafter, the turnout of the demands of specification is reported, after discussing with the supervisor in the course of the project. The report concludes with a disclosure of how the programming, the documentation and the testing have proceeded and a final discussion concerning the project and proposals on continuation.The result is a CD with the documentation of standard circuits and how they are implemented in a new project.
Tylö : Sauna Lighting
Tylö AB is the leading manufactor of sauna cabins in Europe, but there is a lackof a sauna lightning produced by Tylö. The project of developing a new saunalightning series was assigned two students at the developmentengineeringprogram at Halmstad University. The main problem with lightning in the saunais the heat and security aspect. The selection fell on LED technology as thelightning source, thanks to its small measures and low heat emission.The work of constructing of a lightning armature which the capability of coolingdown the LED lightning was carried out during autumn ?06 and spring ?07.
Tylö: Sauna Lighting
Tylö AB is the leading manufactor of sauna cabins in Europe, but there is a lack
of a sauna lightning produced by Tylö. The project of developing a new sauna
lightning series was assigned two students at the developmentengineering
program at Halmstad University. The main problem with lightning in the sauna
is the heat and security aspect. The selection fell on LED technology as the
lightning source, thanks to its small measures and low heat emission.
The work of constructing of a lightning armature which the capability of cooling
down the LED lightning was carried out during autumn ?06 and spring ?07.
Viktiga faktorer för Kommunikations- och Informationsflöden inom projekt
iiiAbstract?We are living in a time of project. Everything becomes project. All development, all efficient,all changes are running as project?.
Project EQS - Elektronisk växelreglering för motorcykel
Husaberg Scandinavia AB is a company producing and developing a range of motorcycles for both on- and off-road use. Husaberg provided the project group with a task of developing an entirely new way of operating the sequential transmission that can be found in today?s motorcycles. The target was to bring the product from idea to a functional prototype ready for further tests. Operation of the motorcycles transmission is today made by a foot pedal placed on the left hand side of the bike.
Teknik i förskolan : En studie om pedagogers uppfattningar om teknikexperiment i förskolan
System Andersson AB is a company located in Jönköping that works with developing computer systems for the mechanical engineering industry. As of today, when this report is written, the company is working on the development of a new Manufacturing Planning and Control (MPC) system. This new system aims to create not only a user friendly interface but also a modern, stylish interface. To achieve this, the company has decided to work with a, for them, new application framework; Windows Presentation Foundation (WPF).System Andersson is well known for developing systems for different kinds of touch screens, this project is no exception. For this new user interface the company wishes to implement different types of Drag&Drop functionality.
IUP - ett specialpedagogiskt verktyg för att utveckla skolan?
The aim of this study is to see if the individual developing plans (i.e. individuella utvecklingsplaner) can be used as a tool for the special needs teacher (i.e. specialpedagog) to develop the school in its challenge to meet the needs of every child. The study is based on contentanalycis and interviews, in order to understand how one school worked with the students´ individual developing plans.The results showed that the school did not use the plans as a tool to develop the education for each and every child, since the plans didn´t affect the tuition.The headmaster did not include the special needs teacher in the responsibility of developing the school.Even though our results showed that the school didn´t use the individual developing plans as a tool for the special educator to develop the school, we still found a possibility for developing the individual educational plans in the capacity of the special needs teacher. The study showed a need of dialogue in which teachers can reflect and problematize their actions and their teaching for the purpose of developing new understanding and new actions in the work with the individual educational plans. We believe that the profession of special needs teacher should supervise these dialogues..
Projektet Läskonster : En uppföljning av ett lässtimulerande projekt
The purpose of this study is to carry out a follow-up study of the reading stimulating project Arts in Reading. The project was in progress between the years 2007 to 2009 in Sweden and nearly 80 librarians from 57 public libraries participated. The aim of the project was to initiate new methods fot how to stimulate reading for children. The promoters of the project wanted to initiate the use of new art forms in the work for reading promotion, encourage more collaboration with new actors in the culture area, and co-operate more with the children.The aim of the present study is to investigate to which extent Arts in Reading really succeeded in establishing its goals, whether new methods were brought about, and how this work was done. Another aim is to find out how librarians in public libraries work to develop children's reading.The theoretical framework is based on Ragnhild Söderbergh's term inculturation, Elisabeth Björklund's research on how children acquire literacy, and Lev S.
Älskvärda digitala leksaker. En interaktiv leksaksrobot
The purpose of this project was to develop an interactive toy concept. A toy capable of reacting and expressing emotions like happiness, sadness, anger or love. And capable of developing its character with use.The initial questions was, how do I create interest, understanding and affection between a digital product and its user? How should the interaction be made?During the course of the project the search has mainly been for something that does not base its shape and interaction on likeness. Forexample likeness to humans or pets.I have created a toy concept called iio.
Förstudie och utveckling av styrsystem för lådförslutare
Ecolean Development AB are developing and manufacturing filling machines for pasteurized liquid food products. Because of lack of any appropriate supplier of box closer which seals boxes with small flaps, they have decided to start a project to develop a prototype of a box closer. Due to long experience from industrial automation I have been given a chance to develop control system for a box closer. Degree thesis involves electric design in ELPROCAD ic PRO and programming of PLC (programmable logic controller) and HMI (Human Machine Interface). The report describes degree project from the project plan phase via the development phase to the conclusions.
Vägghängd duschpall : Utveckling av duschpall för Etac Supply Center AB
This degree project has been carried out by Oscar Adolfsson and Marcus Blomqvist, during the spring of 2010, both studying to become Bachelor of Science in Innovation and Design Engineering, at Karlstad University. The degree project includes 22,5 credits.The work is done on behalf of Etac Supply Center AB in Anderstorp. Etac is a company developing and manufacturing home health care products, with operation in Sweden, Norway, Denmark, England and Germany, and with sales worldwide. Bo Lindqvist, R & D manager has been the contact person at Etac.During the project the students has had a workplace at Semcon Caran AB in Karlstad. Semcon has also been helpful as a sounding board.The objective of the work has been developing a new, wall mounted shower chair, assigned for persons with difficulty to stand up while showering.Etacs requirement of the shower chair is that it should be able to support a user with a weight of 100 kg, the chair shouldn?t have any outrigger, optional should be armrests and backrest.
Framtagning av Drag&Drop klassbibliotek för WPF-baserat användargränssnitt
System Andersson AB is a company located in Jönköping that works with developing computer systems for the mechanical engineering industry. As of today, when this report is written, the company is working on the development of a new Manufacturing Planning and Control (MPC) system. This new system aims to create not only a user friendly interface but also a modern, stylish interface. To achieve this, the company has decided to work with a, for them, new application framework; Windows Presentation Foundation (WPF).System Andersson is well known for developing systems for different kinds of touch screens, this project is no exception. For this new user interface the company wishes to implement different types of Drag&Drop functionality.