Sök:

Sökresultat:

5004 Uppsatser om Construction project - Sida 2 av 334

Visualisering av tomten Pelarsalen, Välle Broar

This Degree project summarizes how it is to work in the CAD program Revit Architecture. This was done because AQ Arkitekter in Eskilstuna is interested in how Revit works. Especially compared to AutoCad which is the software they are using today. Will their work become more efficient with the new software?The starting point was to find out how it is to work with Revit when you only used AutoCAD Architecture before.

INDUSTRIALISERING AV FLERBOSTADSHUS

The construction process which is used today while constructing residential buildings has for along time remained unchanged. Unfortunately the development process has gone away frombecoming industrialized and instead most of the work is done at the construction site. In thisrespect this is a worse alternative because the project outcome will be more expensive and theconstruction time will be longer. Skanska?s vision is to have a process which is more like the oneused in small residential buildings which is fully industrialized.The constructing process for residential building involves more parties and therefore it becomesmore complicated.

Genomarbetade förfrågningsunderlag medför tids- och kostnadsbesparingar : En studie över handlingars påverkan i byggskedet

In order for construction projects to be completed within the specified time limit while at the same time be financially sustainable it requires thorough preparation and an extensive planning. Most essential is the groundwork and the design that determines the project's progress. There are many aspects to consider in order to avoid inconveniences such as delay, litigation, unexpected cost etcetera. If mistakes are made in an early stage it is very likely that the error will follow the process and become an expensive correction cost towards the later part of the project. In other words, it is expensive to rectify defects later on.

Konstruktiv utformning av vikplog

This project is about investigation and improvement of a V-plow for the company Swekip. A V- plow is used for snow removal but this product has been found to have deficiencies in its construction, breaking down and not living up to the desired objectives. This is because the product is ordered from a company in China where they have some problems with understanding the purpose of the plow.Initially the existing plow is investigated, all the shortcomings set out and examined, what is wrong and what needs improvement?When the solutions were done they were evaluated and examined that they actually live up to the desired requirements.This assignment is a pure construction project where the majority is implemented in CAD, where models are developed and FE analyses are carried out. But the project also includes a feasibility study, idea study and hydraulic design.The results are presented in the form of a CAD model and associated drawings that will serve as the manufacturing basis for the new V-plow.

Light Explosion : rekonstruktion av en akrylarmatur

This report presents thesis of Liisa Kokkonen in collaboration with Muovikilpi Oy.The project?s goal is to find a new construction for an existing lamp made of acrylic. Form and design retains and the manufacturing occurs at Muovikilpi Oy. The project contains the new construction and manufacturing of the lamp and also a proposition for a set with floor and wall lamp.  The paper gives an outline of acrylic as material and how it reacts with light.

Tonala skillnader mellan en traditionell och en modern gitarrkonstruktion : En jämförelse mellan två klassiska gitarrer

During my studies to become a guitar builder at Carl Malmsten CTD, I have found an interest in the construction of the classical guitar. I am fascinated by the simplicity of its construction. A simplicity that becomes more complex when you start to study it in detail.In my final thesis I will not try to explain this complexity. The subject is to investigate two different principles regarding its construction. I would like to find out if the sayings concerning one of the principles will yield a guitar with greater ability to produce volume and projection.At a close distance the difference between the guitar?s volumes is not to speak of, but a significant difference can be seen regarding one of the guitars ability to project its sound.

ÄTA-arbeten på Trafikverket

?ÄTA-work? (Changes, Supplementary and Retiring works) is more or less common in all construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of ?ÄTA-work?.

Svävare: Konstruktion av hytt till en svävare

 This report will describe a project between two students from Karlstad University and Markus Norström from Hovercraft solutions. The project aim was to develop a cabin for the hovercraft 380TD. The project was divided into two sub parts; one concerning the design of the cabin and one concerning the engineering. Throughout this rapport you can follow the engineering part of the project. The project has followed a systematic product development process resulting in optimized results for material selection and engineering solutions.

Barns datoranvändning i förskolan : Lärtillfälle eller tidsfördriv?

 This report will describe a project between two students from Karlstad University and Markus Norström from Hovercraft solutions. The project aim was to develop a cabin for the hovercraft 380TD. The project was divided into two sub parts; one concerning the design of the cabin and one concerning the engineering. Throughout this rapport you can follow the engineering part of the project. The project has followed a systematic product development process resulting in optimized results for material selection and engineering solutions.

Resan mot partnering

The purpose of this thesis is to examine how the working method partnering has been welcomed in the Swedish construction company NCC and find possible explanations to this. The theoretical background used to understand and discuss our findings mainly builds on value and network dynamics. The empirical study is of a qualitative nature and builds upon 13 semi-structured interviews and the participation in a two-day start up workshop with 21 representatives from involved parties. The study shows that partnering has been positively accepted at NCC. Possible explanations for this can be found in the contrast the method represents to the traditional way of working within the construction industry.

Arbetsmiljöansvar på en gemensam arbetsplats : En studie över hur arbetsmiljön samordnas på en byggarbetsplats med flera entreprenörer

This essay describes coordination of the work environment on construction sites where many entrepreneurs share workplace. As employer, the entrepreneur has main responsibility for the workers safety on the construction site, the project supervisor is responsible for the work environment, and to coordinate the work environment a coordinator of the construction work environment is appointed. The purpose of this essay is to describe how the work environment is ensured on a shared workplace. In order to answer the essays questions I?ve used a juridical method to interpret the law.

Bakhjulsupphängning, fyrhjuling

Highland Group AB was helping a customer of theirs to create an All-Terrain Vehicle (ATV), a project Highland has never been involved with before. For the wishbone arms of the wheel suspension, traditional manufacturing methods and tubes with cylindrical or square shaped cross section was preferred. We performed a simulation where the ATV was driving on a bumpy road too see the forces involved. With the results we proceeded to calculate the strength of the concepts to find out which is best suited for the tough environment in which the ATV is used. The concept that turned out to be the best was a wishbone made of circular cross section, which had good structural strength and did fulfill the demands that we required for the construction.

Vädrets påverkan på byggarbetsplatsen

This exam report contains studies about how the weather affects the construction site from a planning and productivity perspective. In 1960?s the contractors started to build during the winter, since then the demands to obtain a good construction has been higher on both the contractor and then promoter.In this report you will see how the different actors at the construction site handle the weather problems. By several interviews of the actors at the construction site there have been opinions about the weather situation which has been collected. To get a wide perspective of the problem, field studies from four different construction sites been made.Weather statistics over Halmstad is a mayor part of this report.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

<- Föregående sida 2 Nästa sida ->