Passivhus med prefabelement : En jämförelse mellan en platstillverkad konstruktion och prefabelement från Masonite Lättelement AB
This thesis conducted at the University of Uppsala investigateshow well a Prefabricated building component from the manufacturerMasonite Lättelement AB can be incorporated into ahouse projected to accomplish the demanding criteria of a passivehouse. The thesis is organized as a comparison betweenthe Prefabricated elements and an on-site built component fromthe passive house area of Oxtorget in Värnamo, Sweden. Theaspects investigated were air leakage, energy, moisture, economyand noise conditions.Results of the comparative analyzes shows that the Prefabricatedproducts were capable of accomplishing the requirementsof passive houses and therefore this thesis should beviewed as a basis to confirm that the technology of Prefabricatedbuilding components today in Sweden are mature enoughto be a significant part of the passive houses that are to be builtin the near future. The development of Prefabricated technologyis of crucial significance if we are to accomplish the goalsof reduced energy consumption by the year 2020..
Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling
The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more Prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of Prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..
Industrialiserat byggande
The industrialization of construction is increasing in Sweden which leads to higher demands of Prefabricated components and cells. But what does the business of construction think of the industrialized business and what can be done in order to decrease faults and errors with these products? Today we have many manufacturers who have different technical solutions which might lead to difficulties when assembling components and cells at the building site. But by trying to make a more opened market, with possibly standardized connections details and improving the communication between the different participants, the Prefabricated components and cells can be made and assembled with less errors. This is something that needs to be done in order to establish a more secure business, and especially when working with new companies and methods, when using industrialized products..
Valmöjligheter i samband med prefabricerade badrum
This report deals with Prefabricated bathrooms and the advantage, during the production process, they have compared to ordinary produced bathrooms.The work is done together with the building company JM. The common task is to investigate if the manufactures, in spite of standardized design can meet the concept of JM, i.e. high flexibility and adjustment towards the customer. In JM they are doubtful to the method, as they did not yet worked with Prefabricated modules and think that the choises for the costumer will be limited.There will be a short resume of the progress of the bathrooms and its importance as sanitary and wellbeing.The recent problems with damage caused by damp in bathrooms. Have resultade in regulations.
UTFACKNINGSVÄGGAR : En jämförelse mellan platsbyggda och prefabriceradebyggmetoder
In conjunction with today?s increasing competition within the construction sector, more pressure is being placed on building contractors. Efficiency and improvements are necessary but without impairment to an ergonomic and safe construction site. This in is in order to reduce the construction costs and time but to retain the ability to deliver a high-quality contract.Various methods and prefabrication degrees are used, depending on the project's requirements and conditions. This analysis sets out to investigate and exhibit what qualifications are important when choosing a construction method for curtain walls.Advantages and disadvantages with each method have been analyzed and recommendations have been given to show when different methods are best suited.
Studentbostäder i trä med Prefab-teknik
The Results of this thesis was the creation of two designed house variants with a module toall the apartments. In addition till the first module there are three other modules ofapartments that can be put in the houses if it so needs. The house are volume Prefabricatedand are placed on site in a way that it create an enclosure of the area which faces against thenature and car parks also lies hidden behind these houses.For the actual structure, a cross beam was created to carry the floor above and it is supportby all four walls. The structure between the first and the second floor has no "syll" butinstead there are two differently alternative to linking the floors in order so that it will notmove. The reason with this solution was that there will not be any subsidence when theforces from above are pressed down ward.
Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company
A Prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it?s possible to produce the publications that Villafabriken demands from the designengineer?s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn?t only mean a new way of drawing, it also require a change in the company?s process were the information from the model is being used..
Att effektivisera armeringsarbete : Från idé till genomförande
Most of today?s concrete structures that are built on site are mainly constructed in a traditional fashion with a lot of artisanal operations. One step towards industrializing the in-situ construction of concrete is to use Prefabricated reinforcement. Through this method there can be a lot of savings when each bar doesn?t have to be placed and fixed separately on site.
Alternativa byggsystem för att minska transmissionsförlusterna på miljonprogrammets byggnader
The purpose with this project is to explore and verify three renovating systems for Miljonprogrammet (common expression forbuildings constructed during the years 1965-1975 when over a million houses where built in Sweden) to take measure to thelargely transmission losses of these buildings. Many of the buildings from this period have similar constructions and thereforethe same techniques can be used to renovate several of them. This project only considers the climate scale, although thereare many more factors to concern for to efficient the buildings of Miljonprogrammet.This thesis presents examples of renovations carried out using two of the three renovation systems.The essay presents a reference house of choice on which we apply the three systems and calculate the new U-values,consumption of energy and the investment costs. The new U-values the building is given is matched to the values ofrecommendation for passive houses. Our reference house is a two story apartment building, located in the village ofLammhult, with brick facades at the ends and plaster at the long sides.
Materialspill i byggnadsproduktionen : Waste of Material in the Construction Industry
This report deals with issues related to construction waste. Building material that has not been built into the project is defined as construction waste. Cost of construction waste amounts to 4-12 % of the total cost of the project. Moreover, cost of construction waste is 1-3 % of the production cost. The aim of this study is to increase knowledge about the main causes of waste within the construction industry.
Jämförelse av takkonstruktioner
The background to this final thesis is that our mandator, A-hus, was interested to examine which roof system that would be most appropriate to their types of houses. To investigate this, we first conducted an evaluation of the most commonly used roof systems in Sweden today: decking, board, roof cloth and Prefabricated roof cassettes.To gather information about the different systems we have conducted interviews with several professionals within the construction industry, done an extensive literature study, and gathered information from the Internet.Based on the evaluation of roof systems and the literature, we analyzed advantages and disadvantages of the roof systems from three main perspectives: system characteristics, economics and other characteristics. We found these perspectives to be the most relevant when selecting a roof system.The main perspectives comprise three categories which are graded. These grades are then added together for a score for each main perspective and a total score for the three main perspectives. Then we compared the systems and, based on the scores, suggested one roof system as the most suitable for A-hus.Our result suggests that the Prefabricated roof cassettes probably is the best solution for A-hus, but only if it is possible to standardize the cassettes and still maintain the flexibility to match A-hus? house types.
Prefabrikation - En studie av byggmetodens lönsamhet
This Bachelor?s thesis consists of two parts; one with prefabrication (prefab) in focus and thesecond part includes detail design of a house project. These parts are linked together by designingsome parts of the house project as Prefabricated.The focus section investigates how prefabrication can act time-, costs- and environmentallyeffective to a building project. This is investigated by combining literary sources with sourcesbased on reality in the shape of interviews. The result of the investigation is that prefabcould acteffectively on previously mentioned factors,if this way of building is used in a proper way.The detail design of the house started in a residential area with a new local plan in Huddinge,named Sjöängen II.
Tid- och kostnadsanalys av innerväggar
In our thesis we will compare interior walls, both bearing and non-bearing. All of thewalls analyzed are currently used in production by Skanska Construction, who is alsoour employer/supervisor for the project. The different wall types will be comparedfocusing mainly on time, cost and workability. All of these walls aside from the nonbearingwall are constructed using concrete, either Prefabricated or cast on site..
Ljudisolering - Teknisk felsökning och kvalitetssäkring av lätta bygg-system
By using industrialized building, pre-installed modules can be delivered to the construction site where they are easily mounted. This method has many advantages compared to on-site manufacturing, for example, the precision during the production process should be much higher than building each wall and floor on site. Furthermore, the quick erection procedure when using Prefabricated elements and the possibility to use weather protection has the advantage of not being dependent on weather conditions, and many other factors.Masonite Beams AB is a Swedish company (a member of the Norwegian company, Byggma ASA) with a relatively new technology using light weight beams as bearing elements in the walls and a certain stiff board lamella slap which is mounted on the top of the floor structure creating an integrated stiff beam / board floor structure. The elements are flat which make it much easier to transport the elements from the factory to the building site where the building parts are easily mounted with special mounting stud.One of the main drawbacks of lightweight structure is the sound transmission. The main topic is low frequency annoyance, however the complex structural elements and their mutual sensitive connections other acoustical problems might appear.
RENOVERING AV MILJONPROGRAMMET TILL PASSIVHUS : Implementering av tysk prefabteknik
Construction accounts for about 35 percent of the total Swedish energy consumption and most of the energy is used by the large housing stock from the so-called ?Million program?. In the national action plan the government has put forward in energy efficiency. It is mentioned that existing buildings account for more than 90 percent of what is expected to be the housing stock within the coming 50 years. In order to meet environmental objectives its required that the existing stock be reviewed for energy efficiency. The goverment is now initiating a national framework with a budget of SEK 300 million Swedish crowns per year for five years, starting in 2010 to achieve the goal on energy efficient buildings. Energy efficiency of buildings in both new construction and above all within the existing stock are addressed.