Sök:

Studentbostäder i trä med Prefab-teknik


The Results of this thesis was the creation of two designed house variants with a module toall the apartments. In addition till the first module there are three other modules ofapartments that can be put in the houses if it so needs. The house are volume prefabricatedand are placed on site in a way that it create an enclosure of the area which faces against thenature and car parks also lies hidden behind these houses.For the actual structure, a cross beam was created to carry the floor above and it is supportby all four walls. The structure between the first and the second floor has no "syll" butinstead there are two differently alternative to linking the floors in order so that it will notmove. The reason with this solution was that there will not be any subsidence when theforces from above are pressed down ward. The forces are instead directly down to the nexttimber frame system. This can happen when the real estate's owner might want to buildmore floors on the house than the present two floors house when there is no land to buildand spaces are needed in the future.

Författare

Nabil Al-Ansari Meng Te Seng

Lärosäte och institution

Växjö universitet/Institutionen för teknik och design

Nivå:

"Kandidatuppsats". Självständigt arbete (examensarbete ) om minst 15 högskolepoäng utfört för att erhålla kandidatexamen.

Läs mer..