Sök:

Sökresultat:

435 Uppsatser om Prefabricated-wooden-houses - Sida 1 av 29

Passivhus med prefabelement : En jämförelse mellan en platstillverkad konstruktion och prefabelement från Masonite Lättelement AB

This thesis conducted at the University of Uppsala investigateshow well a prefabricated building component from the manufacturerMasonite Lättelement AB can be incorporated into ahouse projected to accomplish the demanding criteria of a passivehouse. The thesis is organized as a comparison betweenthe prefabricated elements and an on-site built component fromthe passive house area of Oxtorget in Värnamo, Sweden. Theaspects investigated were air leakage, energy, moisture, economyand noise conditions.Results of the comparative analyzes shows that the prefabricatedproducts were capable of accomplishing the requirementsof passive houses and therefore this thesis should beviewed as a basis to confirm that the technology of prefabricatedbuilding components today in Sweden are mature enoughto be a significant part of the passive houses that are to be builtin the near future. The development of prefabricated technologyis of crucial significance if we are to accomplish the goalsof reduced energy consumption by the year 2020..

Studentbostäder i trä med Prefab-teknik

The Results of this thesis was the creation of two designed house variants with a module toall the apartments. In addition till the first module there are three other modules ofapartments that can be put in the houses if it so needs. The house are volume prefabricatedand are placed on site in a way that it create an enclosure of the area which faces against thenature and car parks also lies hidden behind these houses.For the actual structure, a cross beam was created to carry the floor above and it is supportby all four walls. The structure between the first and the second floor has no "syll" butinstead there are two differently alternative to linking the floors in order so that it will notmove. The reason with this solution was that there will not be any subsidence when theforces from above are pressed down ward.

RENOVERING AV MILJONPROGRAMMET TILL PASSIVHUS : Implementering av tysk prefabteknik

Construction accounts for about 35 percent of the total Swedish energy consumption and most of the energy is used by the large housing stock from the so-called ?Million program?. In the national action plan the government has put forward in energy efficiency. It is mentioned that existing buildings account for more than 90 percent of what is expected to be the housing stock within the coming 50 years. In order to meet environmental objectives its required that the existing stock be reviewed for energy efficiency. The goverment is now initiating a national framework with a budget of SEK 300 million Swedish crowns per year for five years, starting in 2010 to achieve the goal on energy efficient buildings. Energy efficiency of buildings in both new construction and above all within the existing stock are addressed.

Emballage för väggelement i trä : Paketering, hantering, lager och transport

As a company it is required to work with strategies to minimize costs such as packaging and logistic costs. The increased market of industrial produced wooden buildings results that the time and the cost which the packaging of prefabricated building elements consume, is experienced to be in greater need of development than before and demands a better solution. The aim with this dissertation was to discover how the development of the handling of the packaging can improve the packaging process. The goal was to present improvement proposals for a simplified and thereby a more efficient production in time and cost perspective.The packaging process which includes packaging, handling, storage and transport were studied. Interviews were made with participants from the market for manufacturers of wooden houses and a case study was made at the company A-hus.

Alternativa byggsystem för att minska transmissionsförlusterna på miljonprogrammets byggnader

The purpose with this project is to explore and verify three renovating systems for Miljonprogrammet (common expression forbuildings constructed during the years 1965-1975 when over a million houses where built in Sweden) to take measure to thelargely transmission losses of these buildings. Many of the buildings from this period have similar constructions and thereforethe same techniques can be used to renovate several of them. This project only considers the climate scale, although thereare many more factors to concern for to efficient the buildings of Miljonprogrammet.This thesis presents examples of renovations carried out using two of the three renovation systems.The essay presents a reference house of choice on which we apply the three systems and calculate the new U-values,consumption of energy and the investment costs. The new U-values the building is given is matched to the values ofrecommendation for passive houses. Our reference house is a two story apartment building, located in the village ofLammhult, with brick facades at the ends and plaster at the long sides.

Prefabricerade passivhusväggar

Background: The most energy efficient houses today are so called passive houses. These houses achieve high energy-efficiency partly by having well insulated walls. U-value describes the amount of heat transfered through a building element, the more insulation, the smaller U-value. A typical passive house wall have a U-value of 0.10 W/m2,°C. The passive houses are primarily made as small family houses and not as a block of apartments.

Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company

A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it?s possible to produce the publications that Villafabriken demands from the designengineer?s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn?t only mean a new way of drawing, it also require a change in the company?s process were the information from the model is being used..

Valmöjligheter i samband med prefabricerade badrum

This report deals with prefabricated bathrooms and the advantage, during the production process, they have compared to ordinary produced bathrooms.The work is done together with the building company JM. The common task is to investigate if the manufactures, in spite of standardized design can meet the concept of JM, i.e. high flexibility and adjustment towards the customer. In JM they are doubtful to the method, as they did not yet worked with prefabricated modules and think that the choises for the costumer will be limited.There will be a short resume of the progress of the bathrooms and its importance as sanitary and wellbeing.The recent problems with damage caused by damp in bathrooms. Have resultade in regulations.

PlusTak

Today´s roofing of dwelling houses is a very time consuming procedure, which includes a lot of different steps on the construction site. Not only does it cost a lot of money, but often do problems with rot and mold occur in the attics of houses today. The use of prefabricated modules has seen a great breakthrough in the field of construction of dwelling houses; at least when it comes to foundations and walls, where this type of approach makes the construction process way more efficient. What no one previous has succeeded to develop is a corresponding system for roofs that meets the demands of a dwelling house. Accordingly the goal of PlusTak has been to come up with a proper module system for roofing of dwelling houses, where the roofing is completed to meet the demands of the Scandinavian market. During the project a lot of effort has been put into customer contacts and the usability of the product, as well in the manufacturing process as on the construction site. This development has gone hand in hand with several practical tests and tryouts.

Redesign of an existing apartment block in Kv Preussen to passive house

Passive houses are a relatively new concept in Sweden and by that it is meant a house without a traditional heating system. The most acknowledged passive house project is the terrace houses in Lindås, Gothenburg, which we have used as a reference. This project concerns a square apartment block. So far, no square apartment block has been built as a passive house in Sweden.The common opinion in the construction industry is that it is not economical to build extremely energy efficient houses. With Peab as commissioner our task was to investigate if that is true, if regarding the construction of a multi storey house as a passive houseMidroc, now owned by Peab, constructed in the block of Preussen in Jönköping during 2004-2005 four houses, with 132 apartments distributed on seven floors.

Småhusproduktion : Utvecklingsmöjligheter hos JM AB

The Swedish building contractor JMRegion Öst would like to to investigatethe possibilities of developing andstreamlining the production of singlefamilyhouses. JM are producing singlefamilyhouses with prefabricated framesat a rate of about two houses per week.During construction, the different tasksare performed by JM?s own productionstaff but also by varioussubcontractors.When examining the schedules of recentlyproduced projects, it appears that allthe houses are more or less completedeight weeks before the customer moves into the house. During those eight weeksseveral operations are conducted such asinspections, installation of appliancesand cleaning procedures. The inspectionperiod constitutes between 25 and 35% ofthe complete construction period.By conducting interviews, it has beendiscovered that this final phase is anessential security buffer for delays anderrors that often occur.

Att vara eller icke vara? : en diskussion om kulthusens existens på Gotland

The purpose of this thesis is to find evidence if cult houses existed on Gotland during the Bronze Age. The cult house is a common term in modern Bronze Age archaeology and the general definitions of cult house are discussed and why cult houses seem to be absent on Gotland. In this thesis the cult house are discussed as a phenomenon, and the possibilities to find Bronze Age cult houses on Gotland are evaluated by making comparisons between Gotland houses with already defined cult houses from the Swedish mainland. Some known cult houses are presented in more detail as case studies, together with house remains on Gotland which could have potential to be defined as cult houses..

44 m2 extra - ett förslag på nytt fritidshus

My Finnish grandfather had a passion for architecture, eventhough he wasn?t an architect. In the end of the 1950s he builta wooden summerhouse on a lot outside of a small villagecalled Lempäälä, close to the city of Tampere. Today the lotbelongs to my mother. Every time I visit our summerhouse, itmakes me want to do as my grandfather did ? to build a smallhouse next to it.My project is a proposal for a wooden house on mymothers lot.

Husen vid Trullbrändan : bronsålderskulthus på Gotland : en fallstudie på två husgrunder i Vallstena sn.

This essay discuss if Bronze Age cult houses were present at Gotland during the Bronze Age. Bronze Age cult houses are a well know phenomenon on mainland Sweden but because of inventory problems no Bronze Age cult houses have been found on Gotland. The main reason for the inventory problems are the Iron Age house foundations that are present in a large number on Gotland, the cult houses and the Iron Age houses have some design details that makes them difficult to separate from each other. In this essay a number of criteria are presented to help separate cult houses from the Iron Age house foundations. Three criteria?s regarding cult houses on Gotland is also presented in this essay.Two house foundations that PhD student Joakim Wehlin, University of Gothenburg and Gotland University, found in Vallstena parish, Gotland, are presented in this essay.

Energikloka hus i Järinge - energiteknisk uppföljning

Energy-wise houses in Järinge - technical follow-up The company JM built energy-efficient houses in Tensta in Stockholm. They have built a total of 16 houses divided into two parts of A-houses and B-houses. The buildings are an attempt by JM to minimize energy-use of the buildings without affecting the comfort and living standards. The project aims to examine the data for the 16 houses on the basis of data and produce a report showing how the buildings worked through a technical perspective. JM approximates that the purchased energy will not be higher than 95 kWh/m2 per year.

1 Nästa sida ->