10902 Uppsatser om Work on improvement - Sida 2 av 727
SMED implementation vid slipoperation
The thesis has investigated how Sandvik Coromant could implement the SMED principle on one of their grinders groups and what improvements it would lead to. The aim of the thesis is to identify the current situation and investigate how their setup times would be affected by SMED. The work initiated with a literature analysis about the SMED principles and then proceeded with an analysis of the current situation where the activity was time mapped. The analysis consisted of time trials of the process that the thesis would include. The time studies revealed opportunities for structural improvements to create environment for a more structured process.
AUTOMATISERING AV PAKETERINGSPROCESS
The aim of this thesis is to investigate if an automation of the manual packaging process at Legosan AB is profitable. Legosan AB, located in Kumla, performs subcontract work of dietary supplements and medical products to companies within Europe. The chapterportal robot is used in the other. As there are several options in the choice of packaging robot the suggestions of improvement are divided into two different designs. Other machines and equipment necessary for the different suggestions of improvement are showed and their measurements are presented.
Ledare & team utan rätt förutsättningar kan aldrig nå maximal framgång : En studie om tre olika produktionsverksamheter inom Volvo Group
This thesis has been conducted at Volvo Bussar ABunder a period of ten weeks. Within the organizationVolvo, the work is conducted with leaders and teamson every level; from production to top management.They have three tasks, besides executing their dailywork, they are expected to actively work on improvingtheir individual work as well as themselves as persons.The two latter are future value adding activities for theorganization. When doing so, however, it has beennoticed that they often lose the grasp of their dailywork. The question that consequently arises is whythis happens. Is it because of lack of time or it isbecause the co-workers do not have the competenceand simply do not know how they are to execute thethree tasks? Or, is it because the motivation to executethe three tasks is not enough? With this in regard, thestatement of issues for this bachelor thesis were thefollowing: how can the conditions for leaders and theteam be improved, in order for them to execute thesethree tasks.To find out why the execution of these threeassigments did not always succeed, the decision wastaken to conduct a survey and interview study in reallife and at the plants.
Arenastaden ? En jämförande studie om attraktiva områden för kontor
This thesis has been conducted at Volvo Bussar ABunder a period of ten weeks. Within the organizationVolvo, the work is conducted with leaders and teamson every level; from production to top management.They have three tasks, besides executing their dailywork, they are expected to actively work on improvingtheir individual work as well as themselves as persons.The two latter are future value adding activities for theorganization. When doing so, however, it has beennoticed that they often lose the grasp of their dailywork. The question that consequently arises is whythis happens. Is it because of lack of time or it isbecause the co-workers do not have the competenceand simply do not know how they are to execute thethree tasks? Or, is it because the motivation to executethe three tasks is not enough? With this in regard, thestatement of issues for this bachelor thesis were thefollowing: how can the conditions for leaders and theteam be improved, in order for them to execute thesethree tasks.To find out why the execution of these threeassigments did not always succeed, the decision wastaken to conduct a survey and interview study in reallife and at the plants.
Arbetsprocess för materialanskaffning vid Forsmarks Kraftgrupp AB
This thesis has been made on behalf of Forsmarks Kraftgrupp AB and is the final part of the education of Bachelor of Engineering in ? Innovation, production and logistics atMälardalens Högskola.Forsmark nuclear power plant is located in Östhammars municipality at the coast of Uppland. The three nuclear reactors in Forsmark together produces approximately one-sixth of Sweden?s electricity consumption each year.The background of this study is that a large number of requests come to the purchasing department with incomplete information. Usually it is in the description of what is to be acquired as the information is incomplete, but also in knowing when Quality Control-functions (QC) is supposed to be used.The aim of this work is to describe and analyse the material acquisition process.
Effektiv betong för småhusproduktion : Betong med högt luftinnehåll för platta på mark
This Masters thesis work describes a comparison between two different methods for estimation of the down channel (base station to mobile subscriber) in Wide-band Code Division Multiple Access (WCDMA). The first estimation method, Optimal Feed-forward Channel Estimation (OFCE), is a conventional method that bases the estimates on data that is known to both sender and receiver, so called pilots. The second method, Decision Directed Channel Estimation (DDCE), is an elaboration of OFCE. It also uses user data for estimation. Simulations show that DDCE, in comparison to OFCE, does not attain an improvement in signal-to-noise-ratio (SNR) for high bit error rates (BER).
Betongbjälklag med limmad matta : olika behandlingars effekt på alkalitet, fukthalt och emissionsbildning
This Masters thesis work describes a comparison between two different methods for estimation of the down channel (base station to mobile subscriber) in Wide-band Code Division Multiple Access (WCDMA). The first estimation method, Optimal Feed-forward Channel Estimation (OFCE), is a conventional method that bases the estimates on data that is known to both sender and receiver, so called pilots. The second method, Decision Directed Channel Estimation (DDCE), is an elaboration of OFCE. It also uses user data for estimation. Simulations show that DDCE, in comparison to OFCE, does not attain an improvement in signal-to-noise-ratio (SNR) for high bit error rates (BER).
En onlinebutik till klädmärket Jungletree : Avvägningar för onlinebutiker inom mode
The term "Project" have become a growing work model that exist in almost all bransches. A project is a work effort made over a finite period of time with a start and a finish to create a unique product, service, or result. Science shows that time limitation has an impact on humans to perform under pressure, which challanges the contributor to deliver. This report contains an examination about project management, both coming from scientific results and an external business. The point of this study is to bring ideas of improvement, which can make the work method more effective in this company..
Kartläggning och analysering av initieringsprocessen : En fallstudie utförd hos Teknikgruppen för RV2012 på Sandvik AB
This thesis has been carried out to the Technology Group at industrial plant Tube Mill2012, which belongs to the Sandvik AB. Technology Group is a unit that takes care ofall requirements and suggestions regarding investigations, test runs and designmodifications. The main objective is to identify and analyze the existing initializationprocess to see where improvement opportunities exist and to come up withsuggestions for improvement, supported by previous research and literature. Anextensive literature search and case study has been conducted to provide a solidfoundation to refer to during the work. Completing the interviews and the workshopgave a clear picture of their unstructured work and approach, how the lowrequirements on the received orders caused problems for the group as well as thelack of a standardized resource allocation method provides major delay factors.Solution proposal then became a very easy process model in five steps with all theinformation gathered in one place.
Analysera mera för bättre kvalitet i förskolan
Abstract The Act of Education outlines that good quality in schools and preschools, focusing on continuous improvement, promote children?s learning and this in turn is on of the most important factors for child and youth welfare.This thesis was based on the authors´ pre-understanding that there are opportunities to improvement in the quality of preschools. The focus was on studying how analyses can provide a base for quality work, and the purpose of this study was to identify and describe the analytical methods that can be used in the process of continual improvement for quality development in preschools.A qualitative study was conducted in two preschools that have received quality awards. It was conducted through interviews with the preschool principals and through studies of various documents.In the comparative analysis of theory and empirical data, it was made clear that there was a regular analysing process going on at the investigated preschools and an emphasize of reflection could also be identified. Keywords: Quality development, preschool, analytical methods, processes, reflection .
Första linjens chefers skattning av sina ledar- och chefsegenskaper samt strukturell empowerment före och efter utbildningsinsats för chefer inom kommunal verksamhet.
The purpose of this study was to examine whether there were any differences in how first-line managers within municipal care rated their management leadership qualities, and structural empowerment before and after the course in "leadership, learning and improvement". The study had a quasi-experimental design and 64 managers participated. There was a significant improvement in the LaMI factor ?Achievement orientation?, after participation in the course "leadership, learning and improvement". In other factors, there was no significant difference before and after training.
Produktivitetsstudie Brobyggnad
The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.
Implementering av TPU : En fallstudie om implementeringen av TPU på ABB Cewe-Control i Nyköping
If Swedish companies are to compete with companies in low-cost countries they have to achieve a more efficient production. The purpose of Total Productivity Maintenance (TPM) is to increase the company's profitability by increasing the productivity. TPM is a method that involves all employees and aims to prevent failures in order to increase the availability of existing equipment.The aim of this paper is to evaluate the implementation process of TPM and give recommendations for the further implementation process. The conclusion and the analysis are based on a case study done at a production department at ABB Cewe-Controls facilities in Nyköping. The case study consists mainly of qualitative data from participation observations, surveys and interviews.Commitment of the management is a key factor in the implementation process of TPM.
Bättre utnyttjande av nya och befintliga förrådslokaler på SSAB Tunnplåt
The purpose of this assignment at SSAB Tunnplåt in Borlänge was mainly to investigate and describe the circumstances for the spare parts stored in storage facilities within the area of operation. Even new facilities which could serve as storage rooms and their opportunities for storing spare parts were an important part of the investigation. This because of the need for improved storing of spare parts. Furthermore, market offers where reviewed for storage of spare parts in more tailored designs. The work will culminate in proposals for improvement which is of importance for the development surrounding the storage and handling of spare parts.
Att skapa en välfungerande arbetsprocess Processutveckling på Ericsson i Katrineholm
In process oriented organizations, it is important to have well-functioning work processes tosupport the work being performed. In order to accomplish this, the organization has to makecertain decisions regarding the design and usage of the processes. This master thesis is based ona case study of a work process that is being used for the industrialization of products at Ericssonin Katrineholm. The aim of the study is twofold. One aim is to improve the studied process byidentifying improvement opportunities and carrying out the required adjustments.