Sökresultat:
1815 Uppsatser om Wind energy - Sida 5 av 121
Skogsbolagens syn på vindskadeförebyggande åtgärder efter stormen Dagmar
On the night of the 26th December 2011, large parts of southern Norrland were struck by the storm ?Dagmar? that caused serious damage to the forests. In the past 10 years wind damage has become a hot topic after several major storms. Forest companies own 25% of the Swedish forest and thus influenced largely by wind damage. The main purpose of this study was to examine whether forest companies attitude towards preventive wind damage actions were changed after the storm ?Dagmar?.
The result was developed by doing interviews with two forestry companies.
En vindkraftparks inverkan på Gävle Energis elnät
The effects from a planned wind farm on the grid utility Gävle Energis electrical grid have been studied. The wind farm is planned to be built in the forest 15 km north of Gävle and will have 23 turbines with rated power from 2 to 2.5 MW, resulting in a total installed power between 46 MW and 57.5 MW. The grid connection will be made at 70 kV. The aim of the analysis was to determine what effects the wind farm would have on the power grid in the form of electrical disturbances (flicker etc.), need for new investment and raised operational cost. To allow the connection of the wind farm technical solutions (new lines, power stations and grid reinforcements) have been constructed.
Simulering av elektriska förluster i en vindkraftpark : Utveckling av programvaran Wind Farm ElectricSystem Calculator (WFESC)
When planning new wind farms, the cost for the internal electrical grid is estimated to account for 8-9 % of the total investment cost. On top of that, the cost for accumulated reduced income over several years (due to electrical losses), has to be added. The economic lifespan is relatively long (about 20 years) which means that an error in the loss calculation could lead to a bad decision basis. The accumulated reduced incomes due to electrical losses can be higher than the initial investment cost for the internal electrical grid.Today, Statkraft Sweden is using a template number when estimating the electrical losses in a wind farm. The actual losses are probably lower than the template number which could lead to an unnecessary high loss cost when planning a new wind farm.The aim of this M.Sc.
Smarta lokala energisystem, Vision-Teknik-Tillämpning
The energy sector is facing an impending paradigm shift. Today?s technology enables the end-user to generate their own energy locally at home. Furthermore, recently developed storage technologies make it possible to balance energy demand with stored energy and integrate district heating with the local power grid. This means that in the future heat and electric power will interact and energy flows is converted over energy boundaries.
Energikartläggning av Fridhemsskolan 16:2
Increased energy consumption in the world has created an increased supply of various fuels, especially fossil fuels. The Swedish government has set up various energy targets for 2020. To reach these goals it?s important to increase the energy efficiency in local buildings such as schools. This work illustrates the breakdown between energy supply and energy losses over the school.
Accessoarer för framtidens kontor
This thesis investigates if a system for small scale electricity production located in anurban environment can be profitable. The work has been divided up into two parts,one extensive literature study and one case study. The purpose of the literature studywas to investigate the area, resulting in a choice of which technology to be studied indepth in a case study.In the case study a system containing small scale wind turbines and photovoltaicsmounted on Gränby Centrums roof was examined. From data containing wind power,wind direction and total irradiation, possible production from a system weresimulated. Three products of each technology were examined in the simulations.From the simulated production an economic analysis was carried out, this toinvestigate if a system is profitable.
Strömningen i och över en skog : utvärdering av en 'mixing-layer' hypotes
A new theory for predicting the windprofile over a canopy has been evaluated. The theory was first presented by Harman and Finnigan (2007). The theory relies on the forming of a mixing-layer above the canopy, due to different mean wind in and above the canopy. Characteristics from both mixing-layer and Monin Obukhov similarity theory have been used to develop the governingequations that give the wind profile. The theory has been used to calculate wind profiles for sixdifferent atmospheric stabilities.
Utvärdering av svensk vindkraft : Skillnaden mellan skogs- och traditionella placeringar
During the last years commercial Wind Power Turbines (WPT) has become larger regardingto the generator sizes and hub heights. Available hub heights around 100 meters is nowcommon, which has led to profitability for WPT located in forests where there normally are tolow wind speeds. The current knowledgement regarding turbulence and the variation in thewind profile for the outcome of the power production for the WPT in forests is limited.In this Master of Science thesis an investigation concerning forest located wind power plantshas been made. The purpose has been to investigate if plants located in forest perform lesscompared to wind power turbines located at more common locations.The analyses are based on statically material for determining the availability,production/generator size, production/hub height, production/swept area and how thetopography affect the production results.The analyses show that the variation in production result for WPT located in forest comparedto turbines located at other locations is small. The availability is high and the productionresults are good..
Ny stamstation i Yttermalung för anslutning av vindkraft : Nätstudie av olika utföranden i normal- och reservdrift
Since 2004, wind power has had the largest installation of new capacity compared to other energy sources in Sweden. Accommodating new wind power may require strengthening or rebuilding of the existing grid in areas where the grid is already loaded to maximum capacity. This master thesis examine the possibility of a new 400/130 kV substation in Yttermalung, Sweden, with a connection to the two neighboring regional grids in Dalarna and Värmland owned by Fortum. This substation would provide a new connection point to the Swedish transmission system as well as an interconnection of the two, currently separated, regional grids. Different expansion scenarios where a substation with and without series compensation or a phase shifting transformer (PST) to control active power flow were studied.
Privata markägares syn på vindskadeförebyggande åtgärder :
Wind and wind damage has become a hot subject because of the storm ?Gudrun? in January 2005. The main purpose of this study was to establish how the land owners attitude toward preventive wind damage actions was changing immediately after they had been struck by a storm.
The result of the study was built on interviews. In springtime 2005 a total number of 20 private land owners were interviewed. Ten of the landowners lived in the province of Småland and ten in the province of Värmland.
Gradering av vindkraftslägen i Lerums kommun med hänsyn till infrastruktur och läge
The aim of this master thesis was to find and grade suitable sites for wind turbines in the rural district of Lerum at the reguest of Göteborg Energi. The rural district of Lerum consists of very complicated terrain which was the reason why we picked Lerum.The assignment was achieved by using the software program ArcGIS and its attendant tools. In step 1 an overall analysis was made in order to sort out the least suitable sites. Step 2 consisted of a 3D analysis in ArcScene together with a more precise analysis in ArcMap. As result we found two interesting sites, which met our demands and specific constraints.
Stormskador i lärk och gran : en jämförelse efter stormen Gudrun
The storm Gudrun January 8-9 2005 felled about 70 millions cubic metres forest in southern Sweden. The majority of the wind damaged forest was spruce (Picea abies). In order to decrease the risk of wind damages in the future other trees species are of interest for forestry in southern Sweden.
The purpose of this master thesis was to study if larch were more wind tolerant than spruce. The method was to compare larch, Japanese larch (Larix kaempferi Lamb.), European larch (L.
Småskalig elproduktion i urban miljö : Fallstudie av elproducerande system på ett handelscentrum
This thesis investigates if a system for small scale electricity production located in anurban environment can be profitable. The work has been divided up into two parts,one extensive literature study and one case study. The purpose of the literature studywas to investigate the area, resulting in a choice of which technology to be studied indepth in a case study.In the case study a system containing small scale wind turbines and photovoltaicsmounted on Gränby Centrums roof was examined. From data containing wind power,wind direction and total irradiation, possible production from a system weresimulated. Three products of each technology were examined in the simulations.From the simulated production an economic analysis was carried out, this toinvestigate if a system is profitable.
Utvärdering av konsekvenserna för nätanslutning av vindkraftparker i Sverige vid införandet av nätkoden Requirements for Generators
Grid codes are becoming more demanding on power generating units due to the factthat the complexity of the power grid is increasing. The penetration of wind powerhas grown over the last years and it is clear that wind farms need to be addressedwith the same type of grid codes as conventional generation units. There is howeveran undeniable difference between the technology in conventional synchronousgeneration units, and the asynchronous generation units in wind farms.This thesis has reviewed the current grid code in Sweden and compared it to the newcode proposed by ENTSO-E, ?the Requirements for Generators?, in the aspect ofwind farms with an installed power of 30 MW or more. The comparison has beencomplemented by an analysis of how wind farms of two different technologies(Doubly fed induction generators and full power converters) can meet therequirements and technical proposals have been given on how to be able to meetcompliance with the new grid codes.The Requirements for Generators contains many non-exhaustive and optionalrequirements, because of this it has been difficult to, at this stage, exactly point outthe technical impact on the grid connection of future wind farms in Sweden.
Supermarket Strategies : Kvalitativ studie av Ica Maxi, Coop Forum och Citygross konkurrensstrategier
This thesis investigates if a system for small scale electricity production located in anurban environment can be profitable. The work has been divided up into two parts,one extensive literature study and one case study. The purpose of the literature studywas to investigate the area, resulting in a choice of which technology to be studied indepth in a case study.In the case study a system containing small scale wind turbines and photovoltaicsmounted on Gränby Centrums roof was examined. From data containing wind power,wind direction and total irradiation, possible production from a system weresimulated. Three products of each technology were examined in the simulations.From the simulated production an economic analysis was carried out, this toinvestigate if a system is profitable.