Sökresultat:
1271 Uppsatser om Waste of Electrical and Elektronic Equipment - Sida 62 av 85
Hus på väg : En kostnadsstudie över flyttning av tre enfamiljshus
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
Pekplattan leksak eller didaktiskt verktyg?
The information technique is developing at a fast pace and almost all new technique is being welcomed with opened arms. The newest on the market is the tablet device, it´s a device used for surfing the web, sending email, watching movies and playing games. It is now also being used in some schools for educational purposes. My research goal has been to find out how the teachers feel about using the tablet device for educational purposes. I have conducted interviews to find the answers to my questions.
Idrott och hälsa ? ett livsviktigt ämne : en kvalitativ studie om vad som utmärker gymnasieelever som deltar i ämneskursen idrott och hälsa 1
AimThe overall aim of this study has been to gain knowledge about what characterize upper secondary school students participating in the subject course physical education and health (PEH). To investigate this, the following questions are formulated:What motivates the students to attend PEH?How do the students experience teaching?What influences the students' opinions of the subject?MethodWe conducted a qualitative study using interview as method. Six students, from year 2; three girls and three boys, from different studying programs at an upper secondary school in the region of Mälardalen were interviewed. The students had been recommended and asked to participate by their teachers in PEH.
Från kraftvärme till energikombinat : En fallstudie av kraftvärmeverket i Sala
In 1997, the Swedish parliament adopted a decision on Vision Zero (nollvision) in the road and transport system. Vision Zero means that no one should be killed or seriously injured in traffic accidents in the road transport system (Prop. 2003/04: 160). For the Transport Administration in Sweden (Trafikverket), this means increased demands on security and signage at road work sites around the country. This in turn means increased demands on the contractors that carry out road work for the Transport Administration.
Utveckling av vippgunga för barn i åldrarna 1-3 år
Under våren år 2013 har Emilia Andersson, en designingenjörsstudent på Högskolan i Skövde, utfört ett produktutvecklingsprojekt i samarbete med HAGS Aneby AB. Syftet med projektet var att utveckla en vippgunga vars storlek skulle vara anpassad för barn i åldrarna 1-3 år. Målet var att vippgungan ska kunna säljas över hela världen samt uppfylla den amerikanska standarden och europastandarden för lekredskap.Projektet inleddes med en förstudie och teori-fas, där bland annat litteraturstudie och konkurrentanalys genomfördes och annan information samlades in för att få djupare kunskaper inom ämnet. Därefter började idéer och koncept genereras, som sedan genomgick utvärderingar, så som användartester, vilket ledde till ett slutkoncept. Konceptet utvärderades med hjälp av bland annat hållfasthetsberäkningar och en antropometrisk analys.Den slutgiltiga vippgungan kan trots anpassningen för åldersgruppen, inte bara användas av 1-3-åringar utan också av äldre barn, tack vare att konstruktion och framförallt handtag ger extra lekvärden.
Vakuumbrytare i småskaliga vattenkraftstationer
This master thesis has been performed at Vattenfall Power Consultant in Gothenburg and Trollhättan for Vattenfall Vattenkraft. In this report vacuum circuit breaker in small-scale hydropower stations with the rated power 4 MVA and below has been studied. Models of the stations are modeled and analyzed in PSCAD/EMTDC to study the high voltage transients that are created after current chopping with vacuum circuit breaker. Vacuum circuit breaker may chop the current before it reaches zero value, which means that high voltage transients can be created. The equipment of the stations can be destroyed by high voltage transients.The purpose of this thesis is to examine the use of vacuum circuit breaker in small-scale hydropower stations and the risk for high voltage transients from current chopping.According to the results there is a risk of high voltage transients after current chopping with small synchronous generators in stations with the operating voltages 0.4 kV and 3.6 kV.
Designprojektet BEDÅRANDE BARN AV SIN TID - Ett innovationsprojekt om material, traditioner och en arbetsmöbel
ADORABLE CHILD OF ITS TIMEThis text will describe a inovative project about material, traditions and someideas about furniture for work in an home inviroment. The content is partlyabout exploring ancient marine- and textile techniques to find somethinguseful for furniture of the twenty first century. It is also about the designprocess of creating a sustainable piece of furniture that questions the paradigmathicsabout usage and the context about manufacturing furniture.The text will briefly describe the design process and then reason about theresult in a deeper sense. Questions that has been considered from the verybeginning of the project as well as those one stumbled across during theevolution of the work will be objectives for the discussion. The result will bein focus as a foundation for the discussion and also the values and issuesabout that.
Reducering av ledtid genom en värdeflödesanalys En fallstudie på Lammhults Möbel AB
The purpose of this study is to increase the understanding of activities, flows and waste in a company's production process. By performing a value stream analysis, non-value adding activities are identified in a production process and then the suggested improvements that can reduce lead times will be stated. The value-stream mapping identifies the flow of information and the flow of material in a production process and this provides the basis for the identification of non-value adding activities.We conducted the study at Lammhults Möbel AB in Lammhult Sweden, where the production flow of Spira-21 has been investigated. This to identify any non-value adding activities that affect the flow negative and consumes time and money in a non-value adding way.A reasonable approach for the project was taken by studying the methodologies and theories. We conducted interviews and site surveys at Lammhults Möbel AB where the flow of information and material in the production process were investigated.
Konstruktion och prototypframtagning av pallväxlare
This thesis was conducted at AB Fredr Wagner in Ösmo in Nynäshamn, Sweden.AB Fredr Wagner provides solutions for the graphic industry and has been asked by acustomer to develop a product that can simplify handling of EUR-pallets, namely amechanical arrangement, further called pallet exchanger that can switch from anempty pallet to a fully loaded one using only hand force.The goal with the thesis was to create design documents for a pallet exchanger, andalso from those documents to manufacture a prototype for testing and evaluation.A field trip was made to the customer, IKAB mailing in Huddinge, where the palletexchanger is thought to be placed. The purpose of this field trip was to get an insightinto the current work condition and need of change, as well as to gather informationregarding the requirements when it comes to size and robustness of the palletexchanger. Existing equipment on the market that can perform similar tasks werestudied in order to find an optimal solution for the actual pallet exchanger.After the field trip and gathering of information the concept generating phase began.The method used for generating concepts was brainstorming. To decide on whichconcept to use, a concept selection matrix was created. The selection criteriaincluded in the matrix came from the requirements for the pallet exchanger.
Tekniska system i förskolan : 3-5 åringars uppfattningar om mobiltelefoni
This report will describe a project between two students from Karlstad University and Markus Norström from Hovercraft solutions. The project aim was to develop a cabin for the hovercraft 380TD. The project was divided into two sub parts; one concerning the design of the cabin and one concerning the engineering. Throughout this rapport you can follow the engineering part of the project. The project has followed a systematic product development process resulting in optimized results for material selection and engineering solutions.
Metodik för analys av batteriets laddningscykel i entreprenadmaskiner : Prototypbyggnad och teori
Volvo Construction Equipment AB, Volvo CE, är en global tillverkare av entreprenadmaskiner. Detta exjobb fokuserar på batterierna i dessa entreprenadmaskiner som försörjer maskinens elsystem och startmotor vid start.Med dagens teknik ställs nya krav på strömförsörjning i entreprenadmaskiner. Den största skillnaden är att förbrukare är igång när motorn är avstängd och strömförsörjningen kommer enbart från batteriet. Ett startbatteri av bly-syra typ är inte konstruerad för detta användningsfall. Volvo CE jobbar därför med att ta fram kunskap om hur laddningen i batterierna används och cyklas under drift.Frågeställning om vilka parametrar och trender som är relevanta för att utvärdera batteriladdning har behandlats i detta arbete.
Ny teknik för småskalig kraftvärme : - med fokus på Organisk RankineCykel (ORC)
As a part of the fight against the global warming the energy production needs to be more efficient and redirected towards sustainable options. One alternative is cogeneration, which means that electricity and heat is produced in one plant. The purpose with this survey is to examine if there are any commercial available combined heat and power techniques, based on combustion of solid moist biomass, which are suitable to small-scale applications. The technique must be able to produce between 2 and 10 MW thermal and the heat demand is a Swedish district-heating system. When already published reports had been studied, the Organic Rankine Cycle (ORC) was chosen as the most suitable technique.
Kompressionsdokumentation och kompressionens inverkan på patientstråldos vid ländryggsröntgen
Enligt arbetsmiljölagen ska arbete planläggas och anordnas rätt, så att det kan utföras i en säker och sund miljö. Trots det inträffar arbetsplatsolyckor i Sverige av olika anledningar. Ett uppdrag har tilldelats författaren för att öka förståelsen för hur anställda på Peab Anläggning AB i Region Mellansverige anser att företaget kan nå sitt mål att halvera antalet arbetsplatsolyckor till år 2017. Sex semistrukturerade intervjuer genomfördes med anställda på företaget. Intervjuerna transkriberades och analyserades genom en manifest innehållsanalys.
BIM i produktionsskedet
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
Utvärderingsmodell för förpackningar och dess hantering i dagligvaruhandeln : ? en jämförelse av ergonomi-, miljö- och logistikparametrar
Companies become more and more aware of the added values of the packaging. A well chosen and developed packaging can reduce the costs for the companies through reduced costs for transports, reduced quantity of waste and discards and increased goodwill for example. The companies? costs for salaries can also be reduced due to the increased packaging handling efficiency and the reduced costs for sick leave, reduced work capacity and rehabilitation etc. that can arise when handling poorly developed products and packaging.