1882 Uppsatser om Waste heat recovery unit - Sida 4 av 126

Norrkila arena : visuell beskrivning av arena

A home for elderly is planed to be built at Zakrisdal, Karlstad, Sweden. The heat source for the building was at the time not determined. In order by the local government of Karlstad this report is meant to examine if the need of heat could be provided only by solar heat combined with a seasonal heat storage. The problem to solve is, if the need of heat from the home for elderly is provided from only solar heat, whitch dimensions of the solar collectors and the storage is needed?.

Biogas på Wapnö : Analys av framtida energisystem

Considering that the price and demand for energy gradually has risen over the past decade and a wider discussion about the human impact on the environment has become increasingly more important and given a clearer role in modern society. This has contributed to increased incentives to reduce the use of fossil fuels and increase the use of renewable energy.The agriculture currently accounts for 20 % of Sweden's total greenhouse gas emissions. A way for an agricultural company like Wapnö AB to reduce their emissions could be to utilize existing renewable energy sources within their own premises.The report's aim is to create an energy audit of Wapnö?s existing energy system and how it changes with a future biogas plant in operation. The energy audit is used to illustrate how the company?s climate footprint could change.

Energikartläggning vid biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production. The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with the measured time of usage.

Energikartläggning av biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.

Fra?n passivhus till NNE-hus : va?gen till ha?llbar utveckling

sustainable development by reducing the energy use by EU:s directive of energy efficiency and the UN Convention. The second purpose is to present the technical solutions regarding ventilation and heating system that is being used in passive houses. This was done using 8 passive houses, 4 germany and 4 swedish passive houses. Even the international and Swedish system requirements for passive houses have been addressed in this project. The goal was also to explain how and why the mechanical system in passive houses has developed to the technology used today.

Torkning och pelletering av organiskt hushållsavfall - en konstruktionslösning

The research in this paper aims to producing a home version machine thatcan dry and make biological waste into compact pellets. This product ismade primarily for those who want to improve the environment and reducethe energy consuming process of separating the biological leftovers fromother waste in the large processing plants and save money due to reducedpickups of waste. Since there is no commercially available product thatdoes what we want to achieve we had to start from the beginning with boththe design and the mechanical aspects. The result is a machine, that fits inour homes, and in an easy and inexpensive way reduces the amount ofbiological waste that needs to be collected by the public wastetransportation system. This is done without reducing any of the energy inthe waste and it can still be used to compost or by large-scale plants that usethe waste to make electricity.

Utredning om en ökad biologisk behandling av matavfall i Halmstads kommun

Environment and sustainable development are very current topics in today's society, bothnational and international. The government's bill 2004/05:150 ?Swedish environment objectives - a common commission? contains several environmental quality objectives, that in turn is divided up in smaller secondary objectives. One of the secondary objectives says: ?Latest year 2010 shall at least 35% of the food waste from households, restaurants, largescale kitchens and shops be recycled through biological treatment.

Materialspill i byggnadsproduktionen : Waste of Material in the Construction Industry

This report deals with issues related to construction waste. Building material that has not been built into the project is defined as construction waste. Cost of construction waste amounts to 4-12 % of the total cost of the project. Moreover, cost of construction waste is 1-3 % of the production cost. The aim of this study is to increase knowledge about the main causes of waste within the construction industry.

Low Temperature Waste Heat Solutions : with proposals for energy technological actions based on Scania?s building 64

The report comprises two separate parts:part 1:  Temperature needs for district heating in the paint shop for axles in building 210part 2:  Energy and low temperature waste heat solutions in heating and cooling systems for   building 64 with surroundingsThe paint shop for axles in part 1 has air quality requirements in places for coating of axles. Toachieve desired air properties there are different process ventilation systems, which consist ofventilation coils for heating and cooling, plus air humidifier. The ventilations coils for heating usedistrict heating. Today the ventilation coils use water of 100°C to achieve necessary air demands inthe coating boxes. This part of the report investigates whether the existing system would achievethe air requirements with a water temperature of 75°C instead of 100°C in the ventilation coilsduring the coldest parts of the year.

Rening av avloppsvatten med anaerob membranbioreaktor och omvänd osmos

This master's theses was carried out on assignment from Stockholm Vatten AB as a part of a project developing new waste water treatment techniques. The goal of the theisis has been to evaluate an anaerobic membrane bioreactor for treatment of waste water from Hammarby Sjöstad. The bioreactor has not been heated and the main interest has been to study the gas production, power consumption and the reduction of organic matter and nutrients.The system has been completed with a reverse osmosis unit and a total of four batch runs have been made with good results. The use of reverse osmosis allows nutrient in the waste water to be reintroduced into circulation as the reverse osmosis concentrate can be used as crop nutrient.The membrane unit is of VSEP ("Vibratory Shear Enhanced Processing") type and an extensive membrane test has been conducted. This so called L-test helped determine the most suitable type of membrane for the system to allow a higher ±ux and thus lower power consumption.

Avfallsförebyggande arbete i Norrbottens läns kommuner : En studie om kommunal avfallshantering och avfallsdirektivets påverkan

This study aims to evaluate the waste management in Norrbottens municipalities in key areas such as possibilities to reach the two national waste goals, information to the public, the effect of legislation, future of waste management and differences in geographic- and demographic areas. The Waste Framework Directive (WFD) issued by the EU and incorporated into Swedish law plays a major part in waste management by defining a hierarchy in five steps how waste should be treated. Interviews conducted with each of the fourteen municipalities aimed to find out what step in the hierarchy they are at and what effect the implementation of EU-legislature into Swedish law has had. Based on the interviews a diverse range of answers was found in relation to the questions asked, generally the more populated municipalities saw a more positive future of waste management, mainly because more developed infrastructure to handle waste is already in place. However the smaller the municipality is the harder it is to allocate resources for waste management and problems arise in the form of expensive transports of waste.

Energianalys av hygieniseringssystem : jämförelse av befintlig pastörisering med integrerad termofil hygienisering på Kungsängens gårds biogasanläggning i Uppsala

The biogas plant Kungsängens gård, owned by Uppsala Vatten och Avfall AB, produces biogas and biomanure from organic household waste, food processing waste and slaughterhouse waste. In year 2012, 4.4 million Nm3 of biogas were produced from 25 200 tons of waste. Before digestion all substrate is sanitized by pasteurization at 70°C in order to kill pathogens. Another method, integrated thermophilic sanitation (ITS), is of interest in order to decrease the energy demand. The method implies that the substrate is sanitized during ten hours in the digestion chamber, where the temperature is 52°C.

Beräkning av värmeförluster och energieffektivisering av elbussar

The ?civilized? world is in need of fossil fuel in order to function. Hybricon AB is a company in Umeå that is developing a technology that hopefully can reduce parts of this need. They are currently testing their two electrical busses (with Hybrid backup) in city traffic on the roads of Umeå in cooperation with the county of Umeå.                               The busses are originally diesel-busses, but the diesel motor has been replaced with two electrical hub-motors with a power of 145 kW each that are powered by batteries.The batteries are charged at the end station after each route. In case the batteries should run low on capacity during driving, they can be recharged by the so called genset.

Återhämtning från psykossjukdom

The objective of this study is to understand how people with psychiatric diseases who are enrolled at a psychiatric clinic experience the recovery process and which internal motivations and external factors influence the process. The study is based on interviews with five people who have been enrolled at a psychiatric clinic. Another aim of the study is to understand how the importance of the outpatient care for the personal recovery and the improvement opportunities of the support from the rehabilitation unit that the interviewees see. The study is qualitative and abductive approach was chosen. This means that the study is based on empirical data supported by established theories.

Energianalys av hygieniseringssystem : jämförelse av befintlig pastörisering med integrerad termofil hygienisering på Kungsängens gårds biogasanläggning i Uppsala

The biogas plant Kungsängens gård, owned by Uppsala Vatten och Avfall AB, produces biogas and biomanure from organic household waste, food processing waste and slaughterhouse waste. In year 2012, 4.4 million Nm3 of biogas were produced from 25 200 tons of waste. Before digestion all substrate is sanitized by one hour?s pasteurization at 70°C in order to kill pathogens. Another method, integrated thermophilic sanitation (ITS), is of interest in order to decrease the energy demand.