Inställning av automatikermed spänningsreglerande verkani det sydsvenska 400-130 kV nätet

The voltage level in the power grid varies due to variations in load and production. Normally these variations are manageable, but they may be excessively large during a disturbance. If the voltage is too high it may damage the equipment in the grid and too low voltages may cause problems like voltage instability. The magnitude of the voltage variation depends on the short circuit power capacity of the point of interest.This problem may become lore prominent due to automatic voltage regulation that acts on shunt reactors and shunt capacitors. When the shunt reactor is connected or disconnected to the grid it may cause such large changes in the voltage that the shunt reactor starts hunting.

Spänningsstyrd underfrekvenslastfrånkoppling i elektriska kraftsystem

This report is a Master?s Thesis performed by Andreas Adolfsson and David Jacobsson atChalmers University of Technology. The purpose of this master?s thesis is to evaluate anew method for load-shedding, the voltage controlled underfrequency load-sheddingdeveloped by ABB. This report presents a comparison between conventionalunderfrequency load-shedding and this new method for load-shedding.

Internet : som kompletterande kommunikationskanal till Event Marketing

The aim of this essay is to examine how the Internet functions as a communication channel to Event Marketing. We have investigated what makes the Internet unique as a communication channel for events and how Internet has been used for event marketing. We have mapped fundamental theories within marketing, media, communications and human-computer interaction, which together describe event marketing. We have carried out case studies on two event-marketing projects where the Internet has played a major role. The first project was XCT which is a project developed by the company Eventum AB.

Framtidens elbilar utmanar nutidens elnät : Påverkan av ett ökat antal elbilar på ett halländskt elnät

The challenges facing low voltage grids are rising as an increasing number of domestic houses transition from fossil fueled heating to electricity based heating. Several environmental goals and visions have the same transition from fossil based power to electricity based power in mind for the transportation sector. One of the most important tools for this transformation is widely regarded to be the electric vehicle. With the demands of the electric vehicle pressuring the power grid, several questions arise regarding the growth of the electric vehicle market and what repercussions it may have on the grid. This paper focuses on a typical low voltage grid in southern Sweden and what effects a growing electric vehicle market may have on it. Through computer-assisted simulations based on several future scenarios regarding the EV market, this paper finds that few modifications and reinforcements are needed on this particular grid within the next 10 to 15 years.

Validering av metoder för analys av Cu, Fe och Na i processvatten med AAS-grafitugn

Södra Cell Mörrum is one of the five paper pulp plants that are included in Södra Cell, and the paper pulp that is produced here is not only sold to Swedish paper mills. Most of the paper pulp is exported to different countries in Europe. In the manufacturing process the plant needs different kind of process water and there are guideline values for how much copper, iron and sodium this water is allowed to contain. Analyzes of this water is in the current situation done with an atomic absorption spectrometric instrument (AAS-instrument) with a flame. Measurements done with flame-AAS of samples that have concentrations near the guideline values for copper, iron and sodium, are not reliable. The reason for not being reliable is that the quantitation limits of these metals are higher than the limit values.

E-tjänstutveckling ur ett medborgarperspektiv : Att skapa beslutsunderlag baserat på medborgarärendens lämplighet för olika kommunikationskanaler

Citizens? interaction with governments is an area with unique implications for channel management. Governments need to take the citizens perspective into further consideration in order to be successful in delivering high-quality e-services. This paper aims to determine if a categorization of citizen-initiated contacts from a citizen-centric perspective can be a valuable basis for decisions regarding e-service development. The study consisted of three steps.

Åsktransienter och överspänningar : En spänningsfylld simulering av elkraftsystemet vid Forsmark 3

A power system will inevitably be subjected to transient overvoltages, most often produced by switching operations and lightning strikes. These transient overvoltages may harm sensitive equipment without sufficient protection, but it is not an easy task to predict what transients may occur or how they affect the system. A fault occurred in a low voltage system at Forsmark 2012 and overvoltages from lightning were concluded as the probable cause. The three aims with this thesis are to develop and test a model of the power system at Forsmark 3, analyse the transient behaviour of the system when subjected to lightning surges and identify critical parameters, and lastly to provide a tool for investigating the protection of the system. The modelling and simulations were performed in the freely available simulation program LT Spice.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.