Sökresultat:
9524 Uppsatser om VBX; Ventilation-system; Heat recovery - Sida 9 av 635
Energieffektivisering av Åhlénshuset i Umeå : Utredning av åtgärder för ventilation, värme och kyla
Sweden is a country that has made some progress in developing energy efficient solutions. The problem in Sweden is that many houses and apartment buildings are old and have inefficient ventilation- and heating systems. This energy is lost when systems are inefficient, which then results in huge economic costs. Luckily, more and more people are becoming aware of this, which means that Sweden is on track to become even better within energy efficiency.Energy use for the housing- and service sector amounts to 166 TWh of total use at 616 TWh. Without distribution and conversion losses, these figures show that the housing- and service sector accounts for almost 40 % of the country's total energy consumption.
Varför, varför inte? : En studie om två skolors syn på läs- och skrivprogrammet Reading Recovery
Syftet med studien är att undersöka, beskriva och problematisera Reading Recovery samt att ta reda på varför två nyzeeländska skolor har valt att behålla respektive sluta med programmet. Undersökningen baseras på fyra kvalitativa intervjuer samt en kvalitativ observation, vilka skedde på två skolor där den ena slutade med Reading Recovery för några år sedan och där den andra skolan fortfarande använder programmet. Undersökningen syftar inte till att jämföra de båda skolornas språkundervisning, utan till att ge en bild av hur det kan fungera på en nyzeeländsk skola. Intervjuerna ägde rum på Nya Zeeland och de intervjuade hade olika anknytning till Reading Recovery. I uppsatsens bakgrundsdel beskrivs den tidigare forskningen om uppsatsens tre grundteman, det nyzeeländska skolsystemet, språkpedagogik samt stödundervisning.
Planering och projektering för individuell mätning och debitering i flerbostadshus
The study aims to reduce energy consumption in apartment buildings where individual metering and charging of heat is applied. The aim is to develop planning and design for individual metering and charging in apartment buildings.The study is based on literature review, interviews and case study that include analysis of existing documents. Interviews were carried out with the property developer and the involved consultants who planned the apartment building Yasuragi. To investigate the differences the condominium association has noted in heat consumption between flats, the debit values of the heat were used to discern which houses that were furthest from the average consumption. On these flats there were temperature measurements and thermal photo shoots made for discriminating behavior and possible construction techniques which could be the explanation for the heat spread.Boverket shows that the consumption of heat can be reduced by 10-20% after insertion of individual metering and charging in an apartment block.
Värmeöverföring i bergvärmesystem : En numerisk analys av den ringformade koaxiala borrhålsvärmeväxlaren
The borehole heat exchangers of today suffer from poor thermal and hydrodynamic performance. The purpose of this thesis is to improve the performance of ground source heat pump systems and thermal energy storages by increasing the energy efficiency of the borehole heat exchangers. For this reason, the annular coaxial borehole heat exchanger (CBHE) has been analyzed. This type of heat exchanger is interesting in terms of both thermal and hydrodynamic performance. A model has been set up in the program Comsol Multiphysics in order to investigate the heat transfer characteristics along the borehole.
Studie av verkningsgrad potentialen för ett vatten baserat Waste Heat Recovery system med kolvexpander
SammanfattningEn ånganna monterades i EGR (Exhaust Gas Recirculation) slingan på en 12,7 liters Scania Euro V motor (DC1306). En modell som beskriver Rankine cykel togs fram med vatten som köldmedium i simuleringsverktyget GT-Power. Ångpannan i GT-power modellen kalibrerades m.h.a experimentell data.Simuleringarna visade att det optimala ångtrycket, det trycket där högst effekt kan erhållas från expandern, är beroende av EGR temperaturen. Det innebär att ju högre EGR inloppstemperatur desto högre optimalt ångtryck. EGR temperaturen i punkt 2 i ESC cykeln är 514? C för denna motor, vilket resulterar i ett optimalt tryck på 120 bar enligt simuleringen.
Utsikten : Hållbara uppvärmningsalternativ för vandrarhemmet på Finnhamn
Finnhamn is a small group of islands in the Stockholm archipelago. At Stora Jolpan, the biggest island, there is a hostel. The main building was built in 1915 and is called Utsikten. The purpose of this project is to on behalf of the Archipelago Foundation (Skärgårdsstiftelsen) find alternative systems that can replace the existing heating system of Utsikten (an oil-fired boiler and electricity heaters) to a system with renewable energy. The alternative system that this project focuses on is a system of solar collectors combined with a wood chip boiler.
Kan jag inte läsa och skriva drunknar jag: en undersökning i
hur man arbetar med läs- och skrivinlärning på Nya Zeeland
med inriktning på modellen Reading Recovery
Syftet med min praktikresa till en skola på Nya Zeeland var att observera deras undervisningssystem för läs- och skrivinlärning och då framför allt specialmodellen Reading Recovery. Utifrån delar av deras metod skulle jag utforma ett förslag på arbetsmodell, som kunde användas i den svenska skolan för att hjälpa lässvaga elever. Praktiktiden delades mellan klasserna 1-3 bestående av elever mellan 5 och 7 år samt med dagliga lektioner i Reading Recovery. Jag gjorde intervjuer med både elever, lärare och föräldrar med erfarenhet av Reading Recovery. Under mina observationer har jag funnit att den nya zeeländska skolan har en väl utvecklad och fungerande metod för läs och skrivinlärning och utifrån detta har jag utarbetat ett förslag på metoder som jag funnit användbara.
En jämförelse av RDF och avfall som förbränningsbränsle
In the EU the amount of waste increased by 14 percent during the years 2000 to 2010. EU?s target to reduce waste generation runs parallel with the aim of increasing the efficiency and profitability aligned with energy recovery. In Sweden the energy recovery through incineration is increasing steadily, and 46 percent of the municipal solid waste (MSW) is treated by combustion. This report aims to examine the profitability of processing MSW into Refuse Derived Fuel (RDF) from an economic-, energy- and environmental perspective.
Energieffektivisering genom förvärmning av flis till kokare med sekundärvärme
The Swedish pulp and paper industry meets higher demand for energy efficiencyi mprovements with increasing energy prices and changes in the Swedish renewable energy certificate system. One action of energy efficiency improvement is by using secondary heat, that otherwise would have been treated as waste heat, for use in a system with lower temperature demands. The aim of this Master´s thesis is to identify possible secondary heat sources in a typical Swedish pulp and paper mill and to investigate what economic benefits the secondary heat will provide when being used for pre heating of wood chips to a kraft digester.The Master´s thesis focuses on three secondary heat sources; dry warm air, warm water and moisture saturated warm air located inside the pulp or paper mill. Two types of kraft digesters are simulated within this study, a typical Scandinavian digester and a modern twin vessel steam phase digester.Due to quality aspects and low temperature level drying is the drying technology with dry warm air rejected. Using warm water in direct contact with wood chips increases the quantity of water to the evaporation plant and thus reduced pulp or paper production and is therefore also rejected.
Service recovery : ?To err is human; recover, divine?
Uppsatsen handlar om hur företag hanterar missnöjda kunder, vilket i teorin benämns service recovery. Uppsatsen behandlar ett företag som sedan mindre än ett år tillbaka är en sammanslagning av fyra olika varumärken. Syftet med uppsatsen är att kartlägga hur fallföretaget hanterar missnöjda kunder samt att undersöka möjligheter till förbättringar. Uppsatsen bygger på teorier om service recovery skrivna av Grönroos, Bowen, Hart, Spreng och Best. Avsikten med uppsatsen är att skriva en plan för hur företaget kan förbättra sitt hanterande av missnöjda kunder.
Design and evaluation of an AGV-system for Tetra Pack in Lund using simulation
This examination work is the final work in our education to become a Bachelor of Science inMechanical Engineering by the University of Lund.The main purpose with this work has been to develop a new effective material handling system for TPPM AB in Lund since the existing system starts to become out of date. The future system that is going to be installed shall have the capacity to support all machines with unit-, semi- and finished goods during full production. The work has also included studying the possibilities to change the material flow in a positive way between the storage and the production when one is using existing buildings.During our work we have been used a simulation program called AutoMod, performing company visits, interviews and reviewed internal and external information to create a picture of what the best conclusion can be. During the work we have contacted five suppliers to receive system solutions and quotatioris. The suppliers, which have been contacted, are Swisslog, Moving, Rocia, Christensen & Hansen and ABB.
Varmt Sköljvatten
In cooperate with Asko Cylinda we have developed a new heat system too short the processtime and reduce the energy consume in a dishwasher and still have it too be a class AAA.The environment and quality is important for the company too still be the number one onthe market, If they want too keep that position the product developed of new innovations willbe very important. The systems we have developed are more effective and reduce energy uptoo 25 %. The process time is reduced too less than two hours, from the today two andhalf-hour. The solutions are too heat up the rinse water and the dishwater at the same time,with a new heating system and it make are solutions unique and effective. Its good for thedish and the environment.
Spillvärmeåtervinning ur kylvattensystemet ismältverket på Sapa Profiler AB i Sjunnen
The smelting process at Sapa Profiler AB in Sjunnen generates large quantities of waste heat which is absorbed by the cooling water when the aluminum is cooled down. This paper is the result of a Master?s Degree Project aiming to present the conditions for recycling the waste heat. The cooling water absorbs the heat from the aluminum at an average rate of 600 kW and the paper shows that it can be used to replace electrical power consumption for heating the production plant?s facilities.
Turbinkretspump system - Kraftvärmeverket i Borås
The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.
Uppvärmd konstgräsplan : Beräkning av utnyttjningstid för en uppvärmd konstgräplan med alternativa rörplaceringar
For Skattkärr IF a turf field with warming has been projected to increase field?s utilization hours and to have a longer period for athletes to perform their activities outdoors. The technique chosen to heat the plan is a type of a geothermal heating system without a heat pump. The brine, which is water with 30% ethanol, collects heat from the borehole and discharges it to a coil in the field. There is at position 11 boreholes but it is planned to increase the number to 31, which is the design for the facility.