Sök:

Sökresultat:

136 Uppsatser om Turbine - Sida 7 av 10

Diskret ickelinjär analys av geometriskt föränderliga linsystem

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

En bakgrund till skadorna på Slussens bärande konstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Energikartläggning i Sundbybergs stad

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Övervakning och detektering av sprickor i betong med en elektriskt ledande färg

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Analys av beställarkrav vid upphandling av entreprenader

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Orsaker och sammanhang kring avvikelser i processen med prefabricerat byggande

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Flödesmätning i vattenkraftverk : Studie av alternativa mätmetoder

Flow measurement is one of the greatest challenges in order to calculate efficiency in hydropower. Most hydropower plants in Sweden use differential pressure methods for flow measurement. These methods are dependent on constant conditions in the waterways. A change in these conditions, like Turbine improvements, prevents differential pressure methods to verify efficiency improvements. Since efficiency improvements can?t be verified by one measurement system, another method, which isn?t affected by changing conditions, can be used.

Forsmark 3 ?Ett Framtida Biobränslekraftverk?

Recent turmoil surrounding nuclear power as an energy source, especially since the accidentat Fukushima, has largely contributed to the debate of whether or not nuclear power should beused as an energy source. This study has examined the economic feasibility of replacingForsmark?s 3rd nuclear reactor with a bio fueled power plant, and find out how this could bedone.The power generation that has to be replaced is equal to 1170 MWe. To replace this, 6 largescaleCFB-boilers, each providing over 200 MWe, were necessary. In addition to this, eachboiler required their respective Turbine sets, comprising one high-pressure-, and one lowpressureTurbine with intermediate reheating capacities.Based on this, a rankine-cycle was modeled using the software EES, to be able to calculatethe total heat required in the power plant.

Framtidens Hus

The company Sol & Energiteknik wanted to examine the possibility to make a standardhouse totally energy independent. Based upon this I have, during the spring of 2007,examined the possibilities available at the market today through litterature studies, contactwith several companies and reading reports at the internet.The first thing to examine has been to determine the energy consumption for a standardhouse, and find out if there are better technologies to be used for energy conservation.My conclusion in this matter is that there are possibilities today for building a house moreenergy efficient.When I had reached the point at which my design for the house was decided, I also hadto choose the different products to use to produce energy as well as to store that energy.To produce heat and electricity to the house I decided to use a wind Turbine and a solarwater heater.The most difficult part of designing a house that is energy independent is that theproduced energy must be stored somehow. Storing the heat is relatively easy beacuse theheat can be stored in a large water tank. The electricity is a bigger problem beacuse itmust be stored in batteries, which today are too expensive to be used in a standard house.In the future producing and storing hydrogen might be used to produce electricity, buttoday that technology is both expensive and not tested enough.My final conclusion is that a standard house can not be built to be totally energyindependent today, unless it is very expensive to connect the house to the electricitynetwork. As an alternative solution I came up with a proposal for a house which isconnected to the electricity network and have some amount of own produced energy.This house prooved to be a good investment if you choose to build it today, and it couldbe a very good investment in the long run beacuse energy prices increase every year..

En kombinerad Organisk Rankinecykel och värmepump integrerat med ett fjärrvärmesystem : Där värme- och elproduktion samt lönsamhet studeras och avfall är huvudbränslet

The demand for district heating is expected to decrease in the future, due to competition from heat pumps and energy efficiency measures in buildings. Development of existing district heating systems is therefore necessary for district heating companies to maintain market shares. This Master?s thesis describes and investigates the heat and electricity production and profitability of a combined Organic Rankine Cycle (ORC) and heat pump that is integrated with an existing district heating system. The studied district heating system is utilizing heat from waste incineration. In Sweden waste constitute 20 % of the fuel mix used in district heating systems, and this share is expected to increase in the future.

Analys och organisering av ö-drift för en samförbränningsstation vid Åmotsfors bruk

Åmotfors Bruk AB (ÅBAB) has today an inefficient production of steam for the manufacturing of paper. Unpredictable energy prices and modernisation of the current equipment has been the underlying factors to invest in a thermal power plant, mainly driven by garbage. This facility will not only use the steam for paper production, it will also generate electricity through a steam Turbine. Today, when a fault on the supplying line occurs which leads to disconnection of the external grid, all the support of electricity to Åmotfors Bruk (ÅB) will disappear. This will lead to major interruptions in the paper production, which will cause severe economical losses.

Energianalys av etanolproduktion : en fallstudie av Lantmännen Agroetanols produktionssystem i Norrköping

In this thesis an energy analysis of ethanol production at the ethanol plant of Lantmännen Agroetanol in Norrköping has been performed. The ethanol plant has been studied in combination with Händelöverket, the combined heat and power plant which provides the ethanol process with steam. The purpose of this study was to determine the energy consumption for the whole production chain from grain to ethanol. The analysis has included the energy consumption for cultivation of grain, production of chemicals, the production chain for wood chips, the steam production and the ethanol plant. The grain and wood chips are both considered raw materials there for the energy content in these are not included as energy input in the system.

Energianalys av etanolproduktion : en fallstudie av Lantmännen Agroetanols produktionssystem i Norrköping

In this thesis an energy analysis of ethanol production at the ethanol plant of Lantmännen Agroetanol in Norrköping has been performed. The ethanol plant has been studied in combination with Händelöverket, the combined heat and power plant which provides the ethanol process with steam. The purpose of this study was to determine the energy consumption for the whole production chain from grain to ethanol. The analysis has included the energy consumption for cultivation of grain, production of chemicals, the production chain for wood chips, the steam production and the ethanol plant. The grain and wood chips are both considered raw materials there for the energy content in these are not included as energy input in the system.

Vindkraftsetablering i skog

This thesis assignment at C-level is focused on calculation models and prediction methodswhish can be used in the stage we call ?prospecting? of possible windmill locations. Thelocation is southeast of Halmstad at the Farm ?Stjernarpsgods?. The rapport has two mainareas directed towards this task.

Analys av lageregenskaper utifrån mätningar i testrigg

Vertical hydropower units has a rotating mass of up to 1000 tons. For the generator and Turbine to work well the rotating system is required to be centered in relation to the surrounding structure. This is achieved by means of radial bearings. The dynamic characteristics of these bearings have a strong impact on the overall rotational dynamics of the total system and thus influence the vibrations in the unit. At Vattenfall Research & Development in Älvkarleby ongoing research is taking place on how the bearing parameters should be represented in the rotor dynamic calculations.

<- Föregående sida 7 Nästa sida ->