Sök:

Sökresultat:

10004 Uppsatser om Time-report SABO AB - Sida 3 av 667

HACCP-Implementering och tillsyn

 The food-safety legislation in Sweden were changed and updated in 1996, much because of demands from the European Union for a common legislation regarding the food-safety issues in the EU. This report discusses how the Swedish authorities are dealing with the new legislation in Sweden. Further on the report presents how the food safety officers in the municipalities in Sweden are implementing this new legislation in their daily work, especially the requirements regarding the HACCP, Hazard Analysis Control and Checkpoints. The report shows that the implementation is quite slow and that many foodsafety-officers don?t implement the legislation in the same way all over the country.

Testrigg för glidlager

This report will detail the participator view of partnering in Kvarteret Frodeparken. Kvarteret Frodeparken is a new construction project being jointly delivered by Skanska Sverige AB and Uppsalahem AB. The report will focus on the comparison between the participators view of partnering with an emphasis on common partnering goals. The report will also focus on the economical benefits, the time benefits and the social environment benefits you can find in partnering.The principals of partnering are; participants together make the common goals for the projects, make ice breaking activities to improve stakeholder engagement and working with an open economy to find the profitable choice for the project. With a combination of the three principals the team together decide the best solution for the project.

Utveckling av projektlaborationför signalbehandling : med digital signalprocessor programmeradmed LabVIEW och Matlab

This report describes how to process audio signals in real time with a digital signalprocessor. The digital signal processor used in the thesis and described in the reportare the Blackfin processor ADSP-BF537 from Analog Devices.In the body of this report there is theory of the processor characteristics and thevarious programming languages used. All experiments that were made on theprocessor are described, these descriptions also help in understanding the annexeswhere the experiments will be presented. The body of this report also describes theprogram used to do experiments. Testing the CPU limit was done and the results arepresented to get a good view of what it can handle.

Grundläggning med cellglas : En studie av byggtid och lönsamhet

This report describes a new foundation method and compares it with a traditional founding of concrete. This new method is called the Koljern technique and uses cellular glass which is called Foamglas. The Foamglas is compounded to founding elements by lightweight steel beams. Foamglas is an insulation material with high compressive strength, and is rot, insect, vermin and acid proof. The cellular glass is also fire proof and watertight, which makes it a very good construction material.The report contains a study of a number of cases for which the Koljern technique is compared with a foundation of concrete.

Produktivitetsförbättringar : - förhöjning av produktiviteten vid mekanisk verkstad genom förkortade transportsträckor och standardiserad bearbetning

The aim of this project has been to raise the production efficiency of Daliff Precision Engineering through reduced transportation time and a more standardized manufacturing process. The problem has upraised because of a big and diversified product flora without any standard products and with just small batches ordered. The report also tries to show the work procedure with general analytical methods and be an example of how a similar problem can be resolved. The transportation time is being proposed to be reduced through a change in the layout of the factory. By moving a few manual machines, dispatch and burring to more efficient locations, the total transportation time will be reduced by 55 %.

Simulering av simulinkmodeller med Extended Kalman Filter

Simulations of simulink models using Kalman filters are often very time-consuming. This problem depends mainly on the fact that the Kalman correction has to be performed at each sample instance through the whole simulation. The goal for this thesis work is to reduce that time-consumption for the filtering part (the integration partis treated in a complementary report) of a simulation. Furthermore a Matlab routine to perform parameter tuning and finally a graphical user interface is developed.The filtering part of the simulation in this thesis is based on an Extended Kalman Filter (EKF). The time optimization of this filter considers searching for the possibility to replace the today?s existing Matlab functions that is used to perform the filtering calculations.

Design och implementation av konfigurationsverktyg för funktionsblock

Abstract In high voltage substations there is an increasing demand for computerized equipment, and automation of operation and supervision. The future primary equipment will provide the possibility to collect more information and to provide better control for improved effectiveness. Since ABB has got a large customer target, each product must be custom made to fulfil the customers (often from different countries) demands. Later these products will be configured by engineers who may not be familiar with the tools used at ABB. This is a very expensive and time consuming.

Duschhållare

This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.

Aktörernas syn på partnering i Kvarteret Frodeparken : Med fokus på ekonomi, tid och det sociala.

This report will detail the participator view of partnering in Kvarteret Frodeparken. Kvarteret Frodeparken is a new construction project being jointly delivered by Skanska Sverige AB and Uppsalahem AB. The report will focus on the comparison between the participators view of partnering with an emphasis on common partnering goals. The report will also focus on the economical benefits, the time benefits and the social environment benefits you can find in partnering.The principals of partnering are; participants together make the common goals for the projects, make ice breaking activities to improve stakeholder engagement and working with an open economy to find the profitable choice for the project. With a combination of the three principals the team together decide the best solution for the project.

Parametrisering av lyftok

This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.

Mätutrustning för ytjämnhet

This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.

FNA-klassad lastbilspåbyggnad

This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.

Analytisk dimensionering av räddningstjänsten i Skåne Nordväst

This report is a part of the process of enhanced cooperation between fire rescue services in the region of North West Scania. The aim of the report is to study and analyze how the fire rescue service should be structured, in terms of rescue units and personnel, if no account is to be taking to the current organization. Two types of accident are considered in the report, traffic accidents and building fires. These are more affected by decreased response time than other accidents. Several suggested organizations are presented and they are evaluated with the computer program REP.

Avvikelserapportering : en rapport om sjuksköterskors erfarenheter

The purpose with this essay is to investigate which factors that are decisive for nurses? propensity for incident reporting. The study uses a descriptive cross-section design. Included are nurses that works at a care unit and who have worked as a nurse for > 1than one year. The survey was sent out to all nurses embraced by the criteria within a subdivision at a hospital in the middle of Sweden.

Hang n' GO : Cykelhållaren som alltid finns tillgänglig

This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.

<- Föregående sida 3 Nästa sida ->