Sök:

Sökresultat:

4052 Uppsatser om Stage project - Sida 3 av 271

Projektledning inom mjukvaruutveckling : En studie om betydelsen av teknisk kompetens utifrån projektmedarbetares perspektiv

More than half of the implemented IT-projects go over budget, deadline or simply fail. The processes in an IT-project requires technical competence to be present among the project participants to ensure the achievement of business goals and to make organisations competitive. The success of an IT-project largely depends on the project manager which makes it interesting to further investigate what impact the project manager?s technical competence has on the project. Previous research shows differing opinions whether technical competence is considered important for the project manager to be successful or not.

TRIM : ? Metod för att identifiera risker och uppskatta projekttider

ITT Flygt is a world leading company that mainly manufactures submersible pumps. A problem of ITT Flygt is that product development projects rarely manage to hold the estimated project time. It shows that something unexpected occurs in projects quite often, which results in delays. The delays can both be due to an optimistic time plan of projects and risks in product development projects which are not discovered at an early stage. This added with unforeseen delays makes it difficult for ITT Flygt to estimate the duration of their projects.The goal with the Master thesis is to examine a suitable method for simulation of project time.

Framtidens Teater finns inte. En beskrivning av ett icke-linjärt projektarbete

This is a non-traditional examination paper written after three years of studies at Malmö University and the Kaospilot Program. It is written in Swedish and in the spring of 2009. It describes a non-linear project based on a process-orientated theory called Theory-U by Otto C. Scharmer (2009). The project aims to investigate the changing conditions of Stage Theatre and deals with non-linearity as phenomena.

Det uppätna monopolet : Initiativ, inflytande och resurser vid planeringen av kvarteret Druvan genom projektet Mitt I City

The purpose of this essay is to examine if the municipality has a real freedom of action to control the use of the land and the shaping of the buildings in a large and prestigious building project.In Karlstad there is now (2006) a large building project in form of a shopping mall. This project is in its final stage of completion and offers me a suitable case to examine. To undertake the purpose of the essay, the following research question is formulated:Do the municipality have a real freedom of action to control the use of the land and the shaping of the buildings in a large and prestigious building project as the Mitt I City project?In an attempt to examine the project and the planning process, three themes are applied. The first theme derives from the hypothesis that the part that initiate the process gets the upper hand as future discussions are taking place in relation to the original ideas.

Produktionsoptimering av Kv. Hunden

For many years, there has been a housing shortage in Sweden. Many have been expecting a construction boom in the housing sector, but that has yet to arrive. With the current legislations and guidelines surrounding modern, energy efficient housing; production costs have increased dramatically in recent years. As a result, having a negative effect on housing production despite the high demand for homes.This exam work is carried out on a construction project of Sjötorpshus AB and its purpose is to evaluate how to optimise the construction process for the production of a new residential settlement, "Kv.Hunden", located in Katrineholm. In an interview with the company's MD, Pär Knutsson, four main issues were defined to focus on.

Konstruktion och design av arbetsplats - för kablagemontör

This degree project has been performed with Mega Teknik AB in Landskrona. The project has resulted in a workplace for the cable installers of Mega Teknik. The workplace contains a workbench and a cart.The first stage in this project was to make an analysis of the current workplace to identify the needs the installers had.The different principle construction proposals of how the workbench would look like and which functions it would have was made during brainstorming, in groups and alone. These proposals were compared against each other using a functional analysis that has been put up to get the principle construction that fulfilled most points in this analysis.The proposal chose for further work was a cart and a bench with a module intends, the table got a formulation that creates a better reach for the installers.This proposal was generated in Catia V5 to get a better overview of the suggested proposal.During the primary structure phase drawings over all the products were made and the components were chosen. Calculations were made and the product got the dimension required.

BIM Building Information Model : Hinder & Drivkraft

The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.

Foldback System

This project concentrates on musicians who work in a professional music studio.The task of this project was to design a new headphone system called Foldback system.The advantage of this system is that all involved in a music project could influence their ownlistening during the project. With a couple of adjustments should each and everyone get theirown individual listening from their headphone station.This report shows different methods, theories and results that came along in development ofFoldback system. The project has resulted in a finished product that will be in use atStudiomega..

Jakten på legitimitet : En studie om konsult/klient relationens initieringsfas

Introduction: The work process of a consultant can be divided into five different stages, where the entry stage is the most important when linking the subject to legitimacy. A great deal of research regarding legitimacy exists, although within areas outside of consulting. Through examining consultant's and potential client's perception of what legitimacy is and how it is created we can determine the importance of the phenomena in building a business relationship between these parties. Research question: How does legitimacy arise between a consultant and a client in the entry stage of a work relationship? Purpose: The purpose of this study is to develop a deeper understanding of how legitimacy is created in the initial stage of a new consultant/client relationship. We also intend to examine the qualities and circumstances which lead to a consultant to acquire an assignment. Method: We have, from an inductive approach of research, collected empirical data in order to gain a deeper understanding of legitimacy in the initial stage of a consultant/client relationship.

Scenografi för en landskapsarkitekt :

Stage Design is design for action and contains décor, side-scenes and properties, as well as costume and grease-paint. The one responsible for this is the Stage Designer, who together with the Director, creates the best conditions for the actors to perform in. The stage, where the play takes place, could be either in a theater, an auditorium, or in another sort of room, at another place, inside or outside, and where the place itself inspires to theatrical performance and expressions. This type of theater is called Site-specific theatre. Two examples of this is the workshop ?Skogen sjunger? (eng.

Hur ett industriföretag ökar kundvärdet genom
tilläggstjänster

The purpose of this thesis was to investigate how an industrial company can increase customer value by offering added services to their core products. Theses added services can be categorized into the three different parts of the buying process. The company that was investigated is Smurfit Kappa Kraftliner in Piteå, a large international industrial company active on a business to business market. We have conducted a case study and made interviews with three respondents within the company. The result of the study show that the company offers value added services in each stage of the buying process.

Faveo Project Management Tool : Framtagning av verktyg för projektstyrning

There are several Project Management Softwares onthe market today. These tools are powerful andextensive to the degree they become too timeconsumingand complex and therefore often defeatits original purpose. This is the case especiallywhen the project manager is inexperienced and/orthe scope of the project is moderate.The purpose of this thesis arose from this context,there seems to be a gap between a home-made MSExcel spread sheet and the advanced softwaresavailable. The thesis and the product has beendeveloped in alliance with Faveo ProjectManagement with the shared goal to create a toolwhich is easy to use but still covers the essentialareas of project management theory. The tool willbe used internally by Faveo-employees as well asexternally together with Faveo?s clients in aneducational purpose.

Slusseneländet

Stockholm is constantly growing and changing. Despite this, for various reasons, it is difficult to execute large building projects. With starting-point in decision making theories we have tried to investigate these difficulties. More specifically we have chosen to study why it has not been possible to rebuilt Slussen in Stockholm. To help us structure our study we have based our research on another large comparable building project, the Globen City project.

Vitrification in sealed containers : Evaluation of a new technique (Rapid-i?) for cleavage stage embryos and blastocysts

Ovarian stimulation in assisted reproduction often leads to the production of a high number of oocytes. After fertilization of these oocytes, the resulting embryos can be cryopreserved for later use. Vitrification is a recently introduced method for cryostoring embryos, showing high survival rates for both cleavage stage embryos and blastocysts. Characteristic of vitrification are high concentrations of cryoprotectants and ultra fast freezing which makes the material glassily. A major concern with vitrification has been the direct contact of the cryo-solutions with liquid nitrogen.

Tre projektmodeller och två fallstudier : - ett steg mot fördjupad kunskap om landskapsarkitekters projekt och process

The formulation of visions into practical projects is an important part of the professional expertise of landscape architects. This expertise includes the gathering, structuring, improvement and utilization of knowledge. Project models have been developed to provide tools for the implementation and governance of projects, as well as means of learning, reflection and survey of individual projects. The aim of this thesis is to describe some general project models and their theory, and to describe practical, real-life examples of project models used within landscape architecture. Questions asked are: ? How do the processes of idea to construction in landscape architectural projects lool like? Do project models have a relevance for the mission of landscape architects? ? Is a common project model used within such projects, or is the project model varying depending on e.g.

<- Föregående sida 3 Nästa sida ->