Sök:

Sökresultat:

685 Uppsatser om Solar heat - Sida 11 av 46

Småskalig biobränsleeldad kraftvärmeproduktion : teknik och investeringsutrymme

To achieve the requirements to decrease emissions of greenhouse gases by 20 % by 2020, Swedenneeds to increase its use of bioenergy. In doing so it seems natural that those who already haveaccess to large amounts of biofuels in the form of by-products such as straw, wood chips anddigestible materials take advantage of these assets locally. By combining production of heat withpower production at the farm it may be possible to not only reduce the direct use of fossil fuel forheating but also reduce energy costs.The purpose was to simulate different cases of using a small scale biofueled combined heat andpower plant for farm-based systems. A MatLab-model was developed and used to draw conclusionsabout the costs for production of heat and electricity with different conversion technologies.The model uses climate data to simulate the variations in heat energy demand on a day-to-day basis.The given heat demand is the base of the simulation and from this the possible electric output iscalculated. This study has focused on the impact of the following properties: electric-, heat- andtotal efficiency, fuel, fuel price and specific fuel requirements.

Vibrationsdämpning av värmepump

Thermia Värme AB is one of the market leading manufactures of heat pumps. In order tomaintain this position, the company wants to improve the vibration characteristics of theirproducts. The aim of this thesis is to develop product design changes that lead to a reductionof vibrations in the heat pump Thermia Diplomat 8.The main cause for vibrations in the system is flow pulsation and mechanical forces inducedby the scroll compressor. Vibration is transmitted through the compressor piping and receivedby the heat exchangers, from where it is further transmitted to the connection points for theradiator and heat source circuits.A number of design changes in order to improve the vibration characteristics have beenevaluated through calculations and practical experiments. The changes have included thecompressor and heat exchanger mountings, the compressor suction and discharge line pipingand also pulsation dampening.The results of the experiments show that the vibration levels in the connections for the heatingand brine circuits can be decreased strikingly through changes in suction and discharge linepiping.

Studie av skyddsavstånd mellan bergvärmeanläggning och skyddsobjekt i ett vattenskyddsområde

During installation and operation of a geothermal heat pump system leakage of an antifreezing agent can appear in a borehole and leak out in surrounding groundwater. To guarantee high quality drinking water for generations to come Sweden has dedicated some areas as water protection areas. The local authority gives permits for the installation of heat pump systems within water protection areas. Before giving a permit the local authority makes an evaluation of the risks involved in installation and operation of the system within the area. By keeping a certain distance between the protected object in the area and the heat pump system the risk of polluting the protected object with an anti-freezing agent can be reduced.This thesis makes a comparison between three different methods of calculating an appropriate distance between the protected object and the heat pump system.

Energianalys av Svensk Växtkrafts biogasanläggning i Västerås

Svensk Växtkraft is the owner of the biogas plant in Västerås. The company is planning to increase their treatment capacity at their biogas plant. In connection to this work it is also possible to make some energy saving changes to the biogas plant. The objective of this study was therefore to make an electricity and heat survey of the biogas plant, a detailed study of the heat consumption in the sanitation step and also a comparison of energy consumption with the present sanitation method and an alternative strategy where the waste is treated in 55 °C during 10 hours (the current method is heating to 70 °C during 1 hour). The energy survey was conducted in close collaboration with staff at the biogas plant. The current during normal operation was measured, power was calculated and multiplied by the time of usage to obtain the energy consumed.

Soldriven kylning i Sverige

This thesis has been performed at the system development company Verendus System AB, together with the home care company Basic Care Unit (BCU).The thesis has consisted of developing a web based informationsystem for BCU in which they can administrate their business. At the time of writing this thesis, BCU was using a windows-application to administrate their activities, which was both costly aswell as resulting in an unnecessary burden. The aim the thesis has thus been to create a platform-independent information system that simplifies and streamlines BCUs work by being user-friendly aswell as imposing some simplifying features.The students has been developing the system by the help of a work method they themselves developed. The method consisted of working in several iterations that each had several milestones. The method resulted in the students knowing easily when each iteration was finished or not.The thesis resulted in a working platform independent prototype.

Sapa Heat Transfers koldioxidspår : En kartläggning av verksamhetens koldioxidutsläpp

Sapa Heat Transfer is a company that produces aluminum heat-exchanger strips for the automotive industry. Sapa Heat Transfer wish to chart their emissions of carbon dioxide in order to meet future demands on carbon dioxide reporting. They also would like to examine the meaning of the term ?green electricity? which is marketed as carbon dioxide free, and the sort of electricity that they purchase. This report includes both direct (liquefied petroleum gas and diesel) and indirect (water, process-water, long distance heating, waste) emissions from their company.

Planering och projektering för individuell mätning och debitering i flerbostadshus

The study aims to reduce energy consumption in apartment buildings where individual metering and charging of heat is applied. The aim is to develop planning and design for individual metering and charging in apartment buildings.The study is based on literature review, interviews and case study that include analysis of existing documents. Interviews were carried out with the property developer and the involved consultants who planned the apartment building Yasuragi. To investigate the differences the condominium association has noted in heat consumption between flats, the debit values of the heat were used to discern which houses that were furthest from the average consumption. On these flats there were temperature measurements and thermal photo shoots made for discriminating behavior and possible construction techniques which could be the explanation for the heat spread.Boverket shows that the consumption of heat can be reduced by 10-20% after insertion of individual metering and charging in an apartment block.

Solenergi på Nordvästra Kungsholmen

The energy that the earth receives from the sun hourly has potential to cover a year?s energy demand in the world. Further, this type of energy is environmentally friendly, natural and free of cost. This report covers solar energy in an urban environment and consists of a case study of installations of photovoltaic cells in a part of the city of Stockholm. It is mainly the economic aspects that are covered but there is also a discussion about the practical consequences and the sustainability as a result of integration of solar energy in an urban environment. The aim of the study is to present results from economic calculations for utilization of solar energy in chosen buildings in Kungsholmen in Stockholm.

Vad påverkar fjärrvärmepriser i Sverige?: En ekonometrisk analys

The purpose with this thesis is to analyse different factors that can explain district heating prices for energy companies in Sweden. We are further interested in examining if the prices is affected by the use of industrial waste heat in their production and the company?s ownership structure. The method applied is a multiple regression analysis using a panel data set of 50 companies over 5 years (2008-2012). The data used is yearly data obtained from the Swedish district heating association.

Sommargården - Hållbara uppvärmningsalternativ för stugbyn Sommargården, Finnhamn

Finnhamn is a group of islands that are located in the middle north part of Stockholm?s archipelagos. On the main island Stora Jolpan there is a camp called Sommargården, which consists of eleven different buildings in various sizes. The assignment given by the Archipelago foundation (Skärgårdsstiftelsen) is to analyze if it?s benefited to replace Sommargårdens current heating system that consists of electricity radiators, with a more energy efficient heating system. This research is done with help of the literature review and a visit to Finnhamn in order to map Sommargården?s current state and its energy usage.

Potentialen av värmebesparing i ett avlopps luftningsledning

This thesis aims at determining the heat losses in a property vent stack and its roof valve. Upon request of a company, the vent stack is analysed for possible heat recovering solutions to be implemented, while relining of the drain system is executed and with a suitable payback time for the economic investments. The heat loss calculations are based on data for properties that are located in the Stockholm region, but also easy to change depending on the situation. The calculations are done on pipes made out of cast iron, which still is the most common type of drain pipe in Sweden, and these are the pipes that relining is usually made on. The calculations that needed to take several variables into account have been done in MatlabR2014a and the thermos dynamical properties that were used in those calculations have been extracted from EES.Three different types of heat losses in the vent stack have been taken into consideration in this thesis.

Energieffektivisering av skolbyggnad från 60-talet : Studie av Hållsta skola i Eskilstuna

In June 2006 the Swedish government decided that the use of energy in buildings should be reduced by 20 percent until 2020, compared to the level of energy used in 1995. To contribute to this goal, the real estate company ?Eskilstuna Kommunfastigheter AB?, set up own goals for their buildings. In 2009, the goal for schools was to have a maximum energy use of 118 kWh/m2year for heating and hot water.The school ?Hållsta skola?, just south of Eskilstuna, exceeds the limit since it used 270 kWh in 2008.

Fördelning av samkostnader - En studie över hur svenska energibolag fördelar samkostnader mellan el och fjärrvärme i ett kraftvärmeverk

Cost allocation ? a study of how Swedish energy companies allocate costs between electricity and district heating in a combined heat and power plant District heating is today the most utilized alternative for heating in Sweden. In a combined heat and power plant (CHP) electricity and heat are cogenerated. The environmental and economic advantages with this kind of production are high. A problem in a CHP-plant is to allocate costs between electricity and heat since both products are generated in the same process.

Opera i Stockholm, Galärvarvet

Suggestion for a new operahouse in stockholm, förslag på nytt operahus i stockholm. Stockholmsoperan..

Planering, förutsättningar ocheffekter av implementering avsolceller i stadsutvecklingsprojekt.

Today, buildings utilize 40 % of the total energy consumption. New energyrestrictions and directives have entered the construction industry. Photovoltaic is asustainable, clean and quiet solution that integrates well in the urban environment buthave not yet reached a breakthrough on the Swedish market. The conditions for solarenergy production are often set in the early planning stages where they rarely arebeing prioritized.This master of engineering project focuses on identifying problems regardingimplementation of photovoltaic in city development projects and giving suggestions topossible improvements in the planning- and construction process. It also givesrecommendations on how the conditions for energy production can be optimized inthe early zoning stage.By conducting simulations with PVsystV5.21, on three ongoing city developmentprojects in Umeå, Malmö and Stockholm and by carry out and analyzing interviewswith city planners, constructors and architects, some conclusions have been made.Several improvements, both politically, with changes in the subsidization systemand/or instatement of a new law with feed-in tariffs, and within the solar- andconstruction industry itself, with better communication between different parts of theprocess as well as better use of experience, can be made.

<- Föregående sida 11 Nästa sida ->