Sök:

Sökresultat:

10045 Uppsatser om Sapa Building System AB - Sida 11 av 670

Uttorkning av lera : Orsaker och följder

When building a house or similar the stress on the ground increases and deformations can arise. The deformations create a foundation that the building is not constructed for and damages on the building arise. The increased stress on the ground can be derived back to the building, but it is possible that the increased stress may well derive from different sources such as other buildings or trees.       The building is an older property, built in the late 19th century alternatively early 20th century, and is today used for rental housing and has suffered severe damages due to subsidence. The goal of the thesis is to find possible causes for these subsidences. The thesis was executed as a combination between literature- and casestudie. After careful studies it has been found that a probable cause for these subsidences is trees. Through field- and lab studies it has been found that the trees has effected the ground through there accumulation of water.

O?verla?mnandet inom byggarbetsmiljo?samordning : Riktlinjer och konsekvenser

The concept of building work environment co- ordinator is a relatively new concept that has its origin in the amendment to the Working Environment Act which came into force on 1 January 2009. The terms; building work environment co-ordinator appointed for planning and design and building work environment co-ordinator for the execution of building or civil engineering work ushered in the industry. Once these disciplines complement one another, you can achieve a smooth handover to ensure a good and healthy working environment.In this thesis, we study a company in Uppsala and their operations and handover by interviewing the relevant staff in question. The result shows that there are currently no present guidelines for how and when the handover should take place, it is up to each individual to provide themselves with the relevant information.If the handover of the work environment would occur to the extent it should it would lead to minimized proportions of unforeseen risks and events that may occur during the production phase, which ultimately leads to a better and healthier working environment..

Hälsoeffekter från trafikbuller vid Bäckegatan

The purpose of the study is to investigate the possible effects of an unstable ventilation system and its influence on energy use and thermal comfort. The report also explores how qualified personal working with HVAC view and handles system control.In order to meet the requirements in energy efficiency and a comfortable indoor climate control regulation is a prerequisite. With optimized increased complexity of the climate systems, it becomes more challenging to control the system and the risk of unstable control increases. No previous studies about what affect an unstable system can have on energy use and thermal comfort have been found.The report is based on several tests were the controlling variable has been increased until the system becomes unstable. Two different types of unstable systems have been investigated.

Arboga Mekaniska Verkstad : Förslag på saneringsåtgärder gällande gjuteriet och plåtverkstaden

The industrialization in Sweden has increased the large number of areas that have been contaminated with various types of pollution. One of those sites are the property Höjen 3:24 in Arboga where ?Arboga Mekaniska Verkstad? once been. The property wants to increase the use of the old former foundry building with the adjacent ?plate-workshop? and believe there are two options for the building: That the building either should be used as a warehouse/concert hall, or rebuilt into a cultural center. An environmental evaluation has shown that the levels of heavy metals are over the Swedish environmental protection agency guidelines of less sensitive land.

Kyla på Swedavia Stockholm Arlanda : Kartläggning av nuvarande fjärrkylasystem och framtida utvecklingsmöjligheter

Arlanda airport is Sweden?s largest airport. The demand for comfort cooling of the airport?s buildings is high and is mainly provided by district cooling. District cooling is based on the same principle as district heating.

Bedömning av loggbok : Bedömning av loggbok med en uppgiftsspecifik matris

The purpose of my independent work was to develop and test a task-specific assessment matrix to the students writing logs that occurs in connection with their APL (workplace-based learning). The matrix is based on upper secondary school subject plan House building from The Swedish National Agency for Education and the four courses House building process, House building 1, House building 2 and House building 3 - conversion. Due to the matrix structure, I used the example matrix of Malmö University. The task-specific assessment must both serve as a guide for students in the implementation of the log writing, and in the evaluation of the assessment work. Both students and teachers then get a common assessment tool for evaluation.

BIM för landskapsarkitekter : virtuell design och kommunikation

The purpose of this thesis is to describe what Building Information Modeling, BIM, could mean for landscape architects, and also hopefully to make sense of the possibilities and problems of the system. BIM is about virtual design and is based on all consultancy groups in the design team modeling in 3D. Intelligent objects and metadata, such as price and material, are used. The project group has a common interchange format for simple sharing of information. To get an idea of how the situation with BIM for landscape architects looks like today, I collected information mostly through interviews.

Hållbara projekteringsverktyg : Från byggnadsinformationsmodell till simulering ? en utvärdering av Revit och Virtual Environment

This study examines the use of building modeling and energy simulations in the design process  of  a  building.  The  take-off  point  is  the  notion  of  energy  simulations  being needed early and throughout the building design process, and that the lack of energy simulations may be explained by the fact that they are time consuming and therefore often too expensive. A greater interoperability between software tools used by relevant disciplines,  such  as  the  architect  and  the  energy  specialist,  would  create  smoother workflows, which would reduce this cost and open up for more frequent and iterative energy  simulation  processes.  The  study  is  an  assessment  of  the  modeling  tool  Revit and  the  simulation  tool  Virtual  Environment  and  whether  they  can  create  smoother workflows, and make leeway for a more frequent use of energy simulations throughout the  design  process.  It  also  investigates  the  limitations  of  what  can  be  examined  by simulations in Virtual Environment. This will hopefully help clarify the future role of energy  simulations  in  design  processes.  The  method  is  a  trial  by  error  approach  of testing the two software tools by building and simulating a model. The results of these tests  show  that  the  workflow  is  not  optimal  (and  therefore  time  consuming)  for frequent  and  iterative simulations  throughout the  design  process,  but  it  also  reveals some  great  possibilities  of  what  can  be  performed  with  these  two  powerful  tools  at hand.  Further  development  with  regards  on  platform  independency  of  the  building information  model,  including  seamless  exporting  and  importing,  seems  necessary  to strengthen the future role of energy simulations..

Förhandling vid tomträttsavgäldsreglering av kommersiella tomträtter - Med fokus på beräkningsmodell för avgäldsunderlag

The objective of a site leasehold is to allow the lessee to occupy a specific plot of land. In return, the lessor imposes an annual ground rent. The ground rent ownership gives the lessor the possibility to capture the increasing in land value. As such, the rent is based on the value of the land multiplied with a percentage that reflects the yield of the land value. It is renegotiated every ten years.

iPad på en byggarbetsplats : Det effektiva och papperslösa sättet att arbeta på

Quality assurance of construction projects and create effective ways of working, is intoday's pressed position, major objectives for building contractor companies. This thesis is an attempt to see if it is possible to achieve these goals with the new modern tool iPad.The author of this thesis has during the latter half of his one year practice work in Uppsala for the Swedish building construction company NCC Construction Sverige AB, conducted a study on the possibility of using the iPad on an construction site. This has been done with active field studies in which applications have been tested and also the supervisors receptive. The usability of the iPad has always been in focus since it is important that the applications are easy to use and easy to learn.The results of the work, as presented in this report, points at opportunities in efficiency if the iPad is introduced and used on construction site. There are many useful applications for the iPad, and with a system that can handle the synchronization between the iPad and the computer, the workflow will be streamlined significantly..

Metodval i projekteringsfasen : Bostadshus Ljusbojen 1

This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.

Bakom fasaden: Haninge kulturhus - en organisationsteoretisk studie med fokus på den fysiska strukturen

This master thesis aims to describe and examine Haninge cultural centre, inaugurated in 2002. We study the centre from an organization theory point of view, with focus on the buildings physical appearance. The question we want to answer is to what extent, and if, Haninge cultural centre fulfills the underlying vision, formulated by the municipality of Haninge. Is the centre the symbol of a new era of Haninge and a vivid democracy as it was meant to be? Is there a congruency between the image the building creates and the vision that was formulated by the municipality? We also seek out to see how the cultural centre relates to an older tradition of cultural centres.

Energihushållning och varsamhet för äldre byggnader : Chefsbostaden i Strömsholm, ett timmerhus från 1900-talets början

This report is the result of a degree project in building engineering, at an advanced level. The project evaluated a building from a technical and historical point of view, and focused on its energy consumption, particularly the energy used for heating. The building in question was a small apartment building in Strömsholm, Sweden. It was made in 1902, from vertical logs, a not so common form of the traditional log house. The goal of the project was to evaluate if the energy consumption could be reduced in accordance with building preservation regulations, that is without damaging any of the building?s cultural or historical values.The building was surveyed with the help of archive and literature studies, interviews and inspections.

Utredning av fastighetsel i ett äldre och ett ombyggt flerbostadshus i Gävle

The residential and service sector in Sweden accounts for approximately 38% of the total energy usage and Sweden has an aim to reduce the total energy use by 20% by 2020 compared to 2008, which means residential sector will have to improve energy efficiency. As part of that a law was instituted by the Swedish parliament that all properties must have an Energy Performance Certificate (EPC) to thereby give the property owners a greater insight into energy use in their buildings and propose recommendations for energy-efficiency measures. On the EPC, a value on the building's energy performance in terms of energy use in kWh / m2 per year is declared, of which electricity is a share of it. Instructions on what to include in the amount facility electricity for running the facilities is regulated by the authority for building, Boverket while SVEBY has made an interpretation of the regulations in their report "Brukarindata bostäder" where they have a table on what should be included in the amount and what not to include.This report is a study of two similar apartment buildings, where one of the buildings recently underwent renovation, to see if the declared amount of energy for electricity, in the EPC, is consistent with the measured value, and whether there has been any reduction in facility electricity in the renovated building after the renovation.The result shows that the measured value of the building electricity was 2.6 kWh / m2 per year, 28,8 %, lower than the declared value in the building that have not undergone a renovation. Calculation of values from previous years (2011) by the same percentage of facility electricity as in the results of the measurements, 56.7%, it becomes clear that the declared value for facility electricity in the EPC of the renovated building do not correspond with reality and that there has been an increase in use of facility electricity after the renovation..

Cykelgatan

Mitt arbete innefattar en "Urban building" med bostadsrätter och kontor där utgångspunkten har varit cykeln då jag ansett den vara det mest stadsmässiga elementet. Placeringen för byggnaden är Hornsbruksgatan på Södermalm där det med projektet blir till 130 nya bostäder och 1200 kvm kontor som är väl anpassade för cykling såväl som cyklister..

<- Föregående sida 11 Nästa sida ->