Sökresultat:
1424 Uppsatser om Requirements specification - Sida 4 av 95
Flödeslayout på Fehrer Sweden AB : med hjälp av simuleringsverktyget Quest
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Utformning av kanbanstyrning i SAAB s pressfabrik
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Uppgradering till ISO 9000 2000 : Monteringsfabriken, SAAB Automobile AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Kartläggning av spånproblem i GG8 : avdelning 9460 Volvo Aero Corporation
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Dekoration av plasttallrikar
A group of two people, Jelena Durkan and Johan von Heideken, have worked together on an assignment from the company August Lundh AB. The company manufactures plastic products for all sizes of catering establishments. The basis for this thesis is a pre-study which shows that many of the users would be more drawn to the plates that the company manufactures, if there was a motif on the plates.This thesis will present the method of application for the motif that best benefits the company, with regard to the requirements placed on the motif, application method and the costs. The group found five relevant methods that were more carefully examined and compared to each other. Those are:Laser engraving, Hot-stamping, Injection molding, In-mould labeling and Pad-printing.The tools that have been used to solve this problem are: Requirement specification, QFD and OEE.
Deriving ECA-rules from timed-automata specifications.
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Termomekanisk analys av svarvstål : Volvo Aero Corporation
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Införande och systemanpassning av Process Engineer i målerifabriken, Saab Automobile AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Automatisk rengöring av Primary Charge Roller : Invegon Equip AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Projektering av ett småhus med fördjupning i uppvärmningssystem
This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.
Passivhus : En jämförelse mellan olika byggnadstekniska lösningar för ytterväggar
This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.
Stomme i småhus ! : - En teoretisk studie av olika bärande vägglösningar !
This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.
Användarinvolvering i ett systemutvecklingsprojekt -Är det effektivt?
In most software engineering project, users are only involved in the beginning
of the project as a help to design the Requirements specification but users can
be involved after this phase too, but is it effective to do so?
With this report we would like to investigate how effective it is to involve
users after the Requirements specification has been written and approved.
To find out how effective it is to involve the users we try some fast and
simple involvement techniques on a quite far gone project. These techniques
include ethnographic studies, prototypes and surveys. We also interviewed a
couple of people who work with usability and finally delivered a report with
our results to them to find out if they found our result relevant. By also
documenting how much time we spent involving users we will show to which degree
user involvement is effective.
We found out that a couple of fast techniques could get very much result in the
form of usability enhancing suggestions to the developers.
Ett planeringsverktyg för TV-postproduktion
This report describes the process of outlining a design proposal for a resource planning tool for TV post-production. A feasibility study in form of a participant observation has been carried out on-site, which has resulted in a requirement specification. Based on the requirement specification, mockups have been created to illustrate the functions and features that a final planning tool should have. In addition to developing a design proposal, an evaluation of the existing resource planning tool Ganttic has been conducted. Ganttic has been reviewed based on how well it meets the list of requirements.
Förstudie för implementering av affärssystemet Oracles tidrapporteringsmodul OTL (Oracle Time and Labor) : Kravhantering och GAP analys för tidrapporteringsprocess i Oracle EBS R12
This is a report for our thesis that was conducted as a conclusion of our bachelor degree in Business engineering at the Royal Institute of Technology (KTH). The work is done in cooperation with the firm Navigate Consulting Business Solutions AB.They have their leading expertise in Oracle E-Business Suite and has previously chosen to implement Oracle EBS R12. The modules that are planned to be implemented are general ledger (GL), accounts payable (AP), accounts receivable (AR), project module (PA), purchases, and CRM. For a consulting company like Navigate, it is particularly important to have a simple and effective time reporting process. We were therefore asked to provide new tabs with a decision-making process to determine if Oracle Time & Labor (OTL) is a useful time tracking system for their business.In order to achieve the company´s aim and objective we decided to follow a development method with five different phases.