Sök:

Sökresultat:

502 Uppsatser om Recycling station - Sida 6 av 34

Distribution of wild boar (Sus scrofa) damage and harvest loss in crop fields

The last decades the populations of wild boar (Sus scrofa) has increased rapidly over the species? entire European range, including Sweden. This is followed by increasing human-wildlife conflicts as a result of the wild boar foraging behavior, causing damage to agricultural crop fields due to trampling and feeding. To be able to minimize damage we need more knowledge of where in the fields the risk of damage is high and what features in the landscape that affect this risk. I analyzed damage distribution in relation to the distance to six different landscape features; forest, road, ditch, building, game field and bait station, in the study area, the Island Mörkö in eastern central Sweden.

Nya metoder för vibrationsmätning på vindkraftverk

This project has revolved around finding better ways of overseeing vibrations of the gearbox at a wind power station. The gearbox has been a huge problem at the stations located at Gässlingen and the sooner the warning of an incoming breakdown is at hand the more money you can save from preparations. The work has been carried out together with Askalon AB in cooperation with consults from ÅF. Askalon is a company with a department focused on overseeing vibrations and it is in collaboration with that department the work has been carried out. During this work, new positions for the sensors and new methods of gathering and analyzing data have been worked out. This was then implemented at a wind power station to be tried out on site.

PLASTHANTERINGEN I SVERIGE En kvalitativ studie om storstadskommunernas plasthantering utifr?n EU:s Plastdirektiv (EU) 2019/904

The aim of this essay is to examine the handling of plastic waste on a local level in the three municipalities of Gothenburg, Malm? and Stockholm. This is achieved with the help of guidance within the theory of Multi-level Governance. By applying the EU directive 2019/904, about disposable plastic, and examining the global plastic problem, the efforts to promote sustainable use, and recycling of plastic, is analyzed. The method involves a qualitative content analysis, where the 2022 waste plans of the three municipalities, ?Sveriges handlingsplan f?r plast? by the Government Office, and the 2019/904 EU directive constitutes the base of the study.

Konstruktion av en autonom vindstation

Construction of an autonomous wind station was a project with the goal of creating a product that could collect wind data from a sensor and then transfer this data to a server wirelessly over the GSM network. The device would be powered by batteries and solar cells and function fully without requiring external power supply. This required that a small computer was constructed and programmed to store and send data at predetermined cycle times and programming of a server that received the sent data. The project also required optimization of power consumption and dimensioning of solar cells and batteries based on this. The construction of this station demanded research both for the selection of hardware and programming software. The computer was based on a microcontroller and a GSM module that sent the data over the 2G network.

Småskalig vattenkraft vid Olofsfors bruksmuseum : Med faunapassage

In Sweden there are 1894 small-scale hydropower plants in operation, which together generate 4.3 TWh of electricity per year according to Swedish hydropower compound (SVKF, 2011). This corresponds to the annual consumption of about 860,000 Swedish households (based on an annual consumption of 5000 kWh). In the mid-1950s there were around 4000 small-scale hydropower plants in operation in Sweden before cheap fossil fuels and uranium competed with them, in the current situation only 1,894 of these are in use. If slumbering small hydropower plants once again would be taken into use and some new ones are built, we would be able to extract about 7 TWh of renewable electricity from these annually in Sweden, representing about 1.4 million households.The thesis intends to calculate and construct a hydroelectric power plant at the existing dam in Olofsfors and give suggestions on how the power station should run during the time that fish migration is greatest in Leduån.The turbine and generator to the station in Leduån at Olofsfors is designed by the height of the fall and the water flow through the dam. The turbine selected for the station is a CK-1000RM turbine with a 4-pole 250 kW generator from Cargo & power turbine Sweden AB, which is expected to deliver 1.2 GWh per year.

Rening av avloppsvatten efter skärprocess

ABB I-R Waterjet Systems combines the robotics and motion expertise of ABB Flexible Automation with high-pressure intensifier/pumping technology from Ingersoll-Rand to provide and continue to develop innovative waterjet cutting systems for global markets. The purpose of this assignment is to develop a process water purifier. The purifier should be applicable as an option to ABB I-R?s production cell Cutting-Box. At first hand the process water should be purified well enough to let out in the municipal sewage system, but the ultimate solution is purifying the process water to the range that recycling is possible.

Effektivisering av destruktionsprocess : En förstudie om hur Fresenius Kabi kan effektivisera befintlig destruktionsprocess

This thesis is a feasibility study into how Fresenius Kabi may rationalize their destruction process in regards to cost, recycling, and work environment. The two main objectives are to identify scrap flows and the possibility to improve or replace the equipment that is now carrying out the physical scrapping. The flow has been visualized by a flow chart of the material and communication. A chart of the problem established to visualize where improvements are necessary. Based on the problems proposals are presented on how to improve the flow thru the plant.During analyze of the physical scrapping equipment it was also necessary to take a deeper look at how they are carrying out there work today, how does the procedure look like, working environment and where are the weaknesses.

Erfarenheter av forcerad materielförsörjning av Vapensystem 01

This Thesis in Military Technology deals with experiences drawn from the forced introduction of Weapons Station 01, 2009. The work aims to identify the experiences regarding the forced procurement of military equipment to see how they can develop normal and fast procurement of equipment. The main conclusions of  this work, is to achieve greater capability and increase the military utility, are: -          Common objectives and priorities of stakeholders-          Response and joint types shall determine requirements for system-          Ensure an integrated project team also at lower levels-          Engage the integrated logistic support early in the materiel process-          Include Armed Forces staff as early as possible in the testing and validation-          Prioritize work to facilitate the rapid development of decision on use (BOA)-          Provide back up for increased redundancy in the mission area .

Levbart transportsystem i Uppsala

In this thesis a transport system is sought after thatif realised in the city of Uppsala could provide bothwell-being to all its inhabitants and sustainability,here jointly refered to as liveability. It is found thatthe car dominated transport system that is inoperation today provides two fundamental values,namely accessibility in both time and space, whichsets it apart from other transport solutions. Thesetwo values are of immense importance for theliveability in our modern world. On the other handthe car dominated system decreases the liveabilityof Uppsala in several different ways. Some of theseproblems, it is argued, could be solved within thecar system, through the adoption of moreenvironmentally friendly cars etc., but otherproblems are inherent in the car system and willremain no matter what changes are made.

Analys av produktionsflödet

Detta examensarbete utfördes våren 2007 på industriverkstaden Ducorail i Luleå. Målet med examensarbetet är att få in tre nya arbetsstationer i den nuvarande produktionskedjan, dessa tre stationer är en demontering/monterings station för cylindriska lager, och en liknande station för TBU lager samt att en tvättanläggning ska nyinstalleras. Den befintliga kedjan ska ses över eftersom en del stationer kan hamna i vägen om man låter dem vara kvar. Utan omorganisation skulle det leda till onödigt truckanvändande eftersom hjulen måste lyftas över stationer som ligger felaktigt. Några alternativa lösningar togs fram, efter utvärdering av dessa valdes en idé att arbeta vidare på.

Rening av avloppsvatten efter skärprocess

ABB I-R Waterjet Systems combines the robotics and motion expertise of ABB Flexible Automation with high-pressure intensifier/pumping technology from Ingersoll-Rand to provide and continue to develop innovative waterjet cutting systems for global markets. The purpose of this assignment is to develop a process water purifier. The purifier should be applicable as an option to ABB I-R?s production cell Cutting-Box. At first hand the process water should be purified well enough to let out in the municipal sewage system, but the ultimate solution is purifying the process water to the range that recycling is possible. When investigating the different principle of purifying water, a research of different products and their manufactories was done. These different products were compared and the principle of filtration was the most applicable, as most of the products were designed for far larger applications. As the process water contains quite large amount of particles, it is necessary to perform the filtration in different steps. The process water purifier is therefore composed of a module of coarse filtration and one of micro filtration. In the module of coarse filtration the mainly amount of fibres and particles are eliminated. They are kept back in the container unit with the larger fragments and dumped with these when the container is emptied. In the module of micro filtration the filtration is performed in two steps. In the first step particles larger than 50?m are eliminated, in the second step the micro filter is setting the range of purifying, in this case 10?m.

Integrering av ekodesign i produktutvecklingsprocessen hos Blå Station

Eco-design is all about improving products environmental performances throughout the products lifecycle by including the environmental aspect into the product development process. There are a large number of different tools that can be used for this, but there are several factors that can affect which one will be the best to use. Some tools for eco-design takes comprehensive studies and can only be performed by experts, while some tools can be used more time- and cost efficient and with basic knowledge. The choice of tool should be based on the company?s situation.This report describes the research of how the design and furniture company Blå Station could include a tool for eco-design in their product development process.

Development of green space in Dar es Salaam, Tanzania

In Dar es Salaam, as in many cities in developing countries, green areas are decreasing due to the fact that the growth of buildings, infrastructure and services has become a priority. As the population increases more buildings and infrastructure are needed and much of the building activity takes the form of uncontrolled settlements, which encroaches the public green space. Dar es Salaam has approximately three million inhabitants, of which about 70 percent are living in informal settlements. The aim with this study is to make a design proposal for a park and recreation area where the Msimbazi river basin in the centre of Dar es Salaam is today. The basin consist of a few playing fields, footpaths and some urban farming, but apart from this it mostly consists of unused grasslands, swamps and forests. Because it is an unsafe place and badly connected to the rest of the city infrastructure, it has become a barrier. The annual flood combined with the constant still shallow water creates a good breading ground for malaria mosquitoes.

Värmeåtervinning av gruvventilationsluft - LKAB i Kiruna

For att brytning under jord ska vara mojlig maste stora mangder frisk luft pressasned till brytningsnivan, vilket gors fran olika gruvventilationsstationer. For att undvikanedisning i schakten varms tilluften upp till 1. innan luften transporteras nedi berget. Idag sker denna uppvarmning av varmebatterier som nyttjar spillvarmefran kulsinterverken. Finns ett extra varmebehov spetseldas det med olja.Franluften ar fuktig och varm.

Tjänligt vatten i kranen - Membranteknik gör det möjligt : En utredning av pilotförsök i Glemmingebro

Nanofiltration is a proper way of preparation of drinking water. The process has a lot in common with reverse osmosis where a semipermeable membrane is used to separate a pure water flow from the remaining water. A pilot plant was used to ensure that nanofiltration is a suitable technology for a specific waterworks station in Glemmingebro, Ystad. The purpose was also to find out if a pH-adjustment is needed for feed water in a possible full scale plant.  In this case nanofiltration is used mainly to remove sulphate and calcium since the raw water contains concentrations of these substances which exceed the limits for potable water. It is important to receive a high recovery (RC), otherwise the deliviery of water won?t be high enough.

<- Föregående sida 6 Nästa sida ->