Sökresultat:
12020 Uppsatser om Project accounting system - Sida 36 av 802
Design och konstruktion av strandspel
This project was conducted during the spring semester 2013 at mechanical engineering program at University Halmstad. The project was conducted in collaboration with MPQ Consulting in Halmstad. MPQ Consulting is a newly established company looking to take step into the product development world. The company has already had ideas and existing products. One of the ideas is to construct and design a form of beach games whose rules are based on the volleyball rules.
Visualisering av tomten Pelarsalen, Välle Broar
This Degree project summarizes how it is to work in the CAD program Revit Architecture. This was done because AQ Arkitekter in Eskilstuna is interested in how Revit works. Especially compared to AutoCad which is the software they are using today. Will their work become more efficient with the new software?The starting point was to find out how it is to work with Revit when you only used AutoCAD Architecture before.
External thoughts
External Thoughts is a studio based project with its purpose to throughworkshops establish contacts and create a dialouge about the content of contemporarygraphic design. The project also aims to apply a design curaticalmethod where the designer is both client and contractor, client and designer.We also wanted to investigate the design content as open-source and examinethe school versus the Internet?s future role in the design and for thedesigner. The project is a collaboration with Rasmus Östgård Ohlson fromBeckmans..
Adaptive QoS Management in Dynamically Reconfigurable Real-Time Databases
During the last years the need for real-time database services has increased due to the growing number of data-intensive applications needing to enforce real-time constraints. The COMponent-based Embedded real-Time database (COMET) is a real-time database developed to meet these demands. COMET is developed using the AspeCtual COmponent-based Real-time system Development (ACCORD) design method, and consists of a number of components and aspects, which can be composed into a number of different configurations depending on system demands, e.g., Quality of Service (QoS) management can be used in unpredictable environments. In embedded systems with requirementson high up-time it may not be possible to temporarily shut down the system for reconfiguration. Instead it is desirable to enable dynamic reconfiguration of the system, exchanging components during run-time.
FNA-klassad lastbilspåbyggnad
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Mätutrustning för ytjämnhet
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Parametrisering av lyftok
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Att våga förnya för att förmedla : Förnyandet av den moderna sakrala konsten sett ur tre konstverks uppkomst tagna från konstprojektet "Kyrkorummet"
In this essay the renewal of the modern sacred art has been examined through the creation of three works of art from the art project ?Kyrkorummet?. The aim has been to show that renewal of the modern sacred art is best accomplished by the combination of the artist history and Bible knowledge and the open mindness of the beholder towards the new and creative, in order to communicate the gospel in modern time.The large extend of the art project demanded a selection of the art works. Therefore, three were chosen and they show the last supper and the baptism in a renewal way including both symbolism and creativity. To complete and facilitate the analyses, a theme, light and water, have been used as well as relevant theories in art history with Kandinsky as main art critic.Through the art project and it?s teaching, history in combination with present time through visits in different and modern churches, thoughts have been stimulated and the result has been new works of art that speaks of our time.
Skadedjursbegränsare i horisontella avloppsrör
The purpose with this project was to invent a product that secures buildings sewersystems against rats. The problem was presented to us by a local building maintainer inHalmstad, who had experienced big problems with rats in his real estate. The project hasbeen carried out by Per Johansson, Robert Lidén and Niclas Nilsson under our ownauspices. We are primarily sponsored by AMLI Business Partner but also byInnvationsgruppen, Halmstad Fastighets AB and Anticimex.To be able to secure a whole building with only one product we came to the conclusionthat the product must be placed in the horizontal sewer pipe that connects with themunicipal sewer system. Our goal was to invent a product that prevent rats from passingand at the same time not affect the water flow.
Användarinvolvering i ett systemutvecklingsprojekt -Är det effektivt?
In most software engineering project, users are only involved in the beginning
of the project as a help to design the requirements specification but users can
be involved after this phase too, but is it effective to do so?
With this report we would like to investigate how effective it is to involve
users after the requirements specification has been written and approved.
To find out how effective it is to involve the users we try some fast and
simple involvement techniques on a quite far gone project. These techniques
include ethnographic studies, prototypes and surveys. We also interviewed a
couple of people who work with usability and finally delivered a report with
our results to them to find out if they found our result relevant. By also
documenting how much time we spent involving users we will show to which degree
user involvement is effective.
We found out that a couple of fast techniques could get very much result in the
form of usability enhancing suggestions to the developers.
Implementering av mjukvarubaserat PLC-system för reglering av magnetiseringen av en synkrongenerator
In order to reduce the price for, and improve the performance of automatic control systems for magnetization of synchronus generators, the possibilities of using a PC based software PLC system, Programmable Logic Controller, has been investigated. The result is a system based on the CoDeSys software PLC with runtime environment from 3S-Software, communicating with external units via Modbus fieldbus. System price is reduced from ?5000 to ?2000 and system processing speed is reduced from 10 ms for a Siemens S7 PLC to 4 ms with the CoDeSys PLC system though unsolved problems with runtime seizure caused by improper settings in the PC BIOS..
En undersökning av projicerat ljus i inomhusmiljö
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Hylluppställning i förändring ? En studie över svenska folkbiblioteks alternativa hylluppställningar
The aim of this thesis is to study how public libraries in Sweden use alternative shelf arrangements that differ from the library?s original classification system, which in Swedish public libraries usually is the SAB-system. I sent out a survey to 169 public libraries, where I received 114 replies. 77 of these stated that they had some kind of alternative shelf arrangement, therefore these are the ones that are included in my study. I wanted to investigate in what way the libraries had changed their shelf arrangement and why this decision was made.
Optimering av fackverksmodellering : Ett makro för Tekla Structures
This project is the result of a cooperation between HalmstadUniversity and EABAB. The aim of the project was to create a macro that would help EABAB automate the process of designing steel trusses. When run in Microsoft Excel, the macro imports and processes coordinates from a calculator program. The data is then imported into the Building Information Modelling software Tekla Structures, which creates a 3D structural model of the steel truss.The macro saves much time in the project planning process and also helps minimize the risk of design flaws caused by human error. .
Resefria möten : Ett projekt för att minska slöserier på arbetsplatsen
AbstractThis degree project is about having meetings in The Swedish Social Insurance Agency, which is awide organisation. This work will concentrate on one of the projects going on within theorganisation which is travel-free meetings, where they are building a video meeting system thatallows the employees in the organisation to be able to meet with each other through the use ofvideoconferencing instead of physical meetings.In this work we will show how Kaikaku (radical system changes) along with Kaizen (continuouschange) can support an organisation to become more efficient and reduce wastage. We have donethis work in an organisation that is present in over one hundred locations in Sweden.The Social Insurance Agency has over 13 000 employees at over one hundred locations inSweden.The organisation has to be close to their customers and provide the best service aspossible. To be able to work in a uniform way, the employees get together and have meetings.Some meetings are just progress meetings and takes perhaps no more than two hours to complete.However, if seven employees from seven different locations need to have meetings, in the worstcase, they all have to meet in a common place.This is expensive for the organisation in travel costs, time and absence from work, but thetravelling also contributes to environmental pollution if the employees are travelling by a fuelpoweredvehicle.A whole day could go lost for having a meeting in about two hours if all sevenemployees went from their own cities to e.g. Stockholm for the meeting.Muda (wastage) of travel created several different types of Muda, namely:? Wastage with anticipation when the employees had to wait for e.g.