Sök:

Nybyggnad till fårproduktion

In Sweden we need more lambs during March to June. I decided to calculate on a spring lamb production, because to many of the Swedish lambs go to slaughter in the autumn. I counted on 1000 ewes which have 2000 lambs each year, 200 of these lambs stays on the farm and replace old ewes. The buildings are 3600 square meters. I have counted on two different sorts of buildings, the first one is a shed, the second one is three polytunnel sheephouses. I feed them with a TMR wagon onto three electric bands. Each band is 100 meters and has a 4 by 100 meter box on each side. The purpose of this work is to see if a spring lamb production is profitable. I have calculated so I saw the profit after 1, 2, 3 and 11 years and I choose to pay back the hole investment in ten years. In the results you can se that there is a loss over the hole 30 year period. There is about 3000 hours of work yearly in this production. If you pay wages the hole time you will not be able to repay them. The polytunnel houses are cheaper to build, but they probably have to be replaced after 15 years. The shed will probably last for 30 years.

Författare

Anders Norlén

Lärosäte och institution

SLU/Dept. of Agricultural Biosystems and Technology

Nivå:

Detta är ett examensarbete.

Läs mer..