Sök:

Sökresultat:

5583 Uppsatser om Production company - Sida 2 av 373

Miljövärdeflödesanalys av Risifruttiproduktionen : En utvärdering av värdeflödesanalys och miljövärdeflödesanalys

This report is the result of a thesis work carried out on the Risifrutti production at the company Procordia Food AB. The thesis is at a master level and is the final work for the author to receive a Master of Science in Innovative production at Mälardalen University. The thesis comprises 30 credits and has lasted for 18 weeks. The thesis is mainly a research on whether it is possible to perform an Environmental Value Stream Map (E-VSM) in a food processing industry and an evaluation if the tools E-VSM and Green Performance Map (GPM) are useful in this type of industry. An extra part to this research is to use the results from the E-VSM and give Procordia Food AB information on improvement potentials in the Risifrutti production. The author has found it difficult to collect some of the quantitative data to the E-VSM, mainly regarding energy, but by using the Value Stream Mapping (VSM) tool and other Lean tools the author was able to identify and quantify several wastes in the Risifrutti production. Recommendations for improvements based on these wastes have been given to the company. In the research part of this report the utility of the Value Stream Map, Environmental Value Stream Map and Green Performance Map in a food processing industry have been analyzed. The author has found that the Value Stream Map has been a useful tool since waste and unevenness in the tact of the production has been identified. The Environmental Value Stream Map and the Green Performance Map are also great tools when a company wants to analyze their environmental impact and then invest in environmental improvements. However, no profound energy analyzes has been done in the Risifrutti production because of the lack of energy meters for steam, electricity and compressed air in the production lines..

Outsourcing ? Ett verktyg för resurseffektivitet?

AbstractOutsourcing is a business strategy that has developed over the last 40 years. Outsourcing means to let another company do some activity within the company, for example production.The thesis for this paper is: How is outsourcing used in a manufacturing company today and how is the resource efficiency affected by it? The research is divided into two parts, a theoretical part and an empirical part. The theoretical part consists of a study of literature. The works in this study is books, text books, bachelor thesis paper and scientific articles.

Utveckling av produktionslina

The company is currently in a stage of improvement and has therefore taken the help of students at School of Engineering, Jonkoping University. The current production is batch, production layout is fixed. A bottleneck is created after the first station which leads to large efficiency loss.  The meaning of this report was to provide a layout suggestion with balanced workstations to a new production line. The conditions were that the production line would be one-way, driven by customers order and meet a demand of 40 products per week.

Ledtidsreduktion vid ACG Nyström

A report has been made at a company in Borås at a company called ACG Nyström. Thecompany is today international and is marketing advanced equipment, systems and furthereducation to the manufacturing industry. A part of ACG Nyström?s production is a machinethey call Unimat. ACG Nyström doesn?t just stand for the actual production of the machine,but also for assembling and installation of the machine at the final customer.

Reducering av ledtid genom en värdeflödesanalys En fallstudie på Lammhults Möbel AB

The purpose of this study is to increase the understanding of activities, flows and waste in a company's production process. By performing a value stream analysis, non-value adding activities are identified in a production process and then the suggested improvements that can reduce lead times will be stated. The value-stream mapping identifies the flow of information and the flow of material in a production process and this provides the basis for the identification of non-value adding activities.We conducted the study at Lammhults Möbel AB in Lammhult Sweden, where the production flow of Spira-21 has been investigated. This to identify any non-value adding activities that affect the flow negative and consumes time and money in a non-value adding way.A reasonable approach for the project was taken by studying the methodologies and theories. We conducted interviews and site surveys at Lammhults Möbel AB where the flow of information and material in the production process were investigated.

Decentraliserat lager - ett steg mot flexibilitet

This study was conducted at Glimek AB, a company that has chosen to decentralize its central storage unit in order to increase production efficiencies. The purpose of the study was to identify the problems in the production cycle that lead to the decision to decentralize the central storage unit, as well as identifying what the decentralization entails. The effects of the decentralization have not been analyzed in the study, and consequently neither financial nor production disadvantages have been considered.Appropriate questions were formulated based on the chosen underlying theories, and were asked to selected individuals with relevant knowledge. The study is based on the information that was gathered from interviews with management as well as staff within the company. In addition, supporting information such as flowcharts, drawings, orders and decision support documents were supplied by the company.

Uppskärningsmaskin : Underlag till CE-märkning

Abstract (in English)The work that lead to a CE- marking and the creation of a total drawing foundation on an existing machine carried out on the company Polytec Composites Sweden AB in Ljungby. The company have design an machine that exist in six example that runs in the production. To be able to use the machine the company have to work out a CE-marking. The process that summed up all the document that needs for the machine to make a CE-marking. The documentation includes a total drawing over the machine and a risk analysis performed by a group employers on the company.

Att reducera ledtiden i en produktion med hög variation och låg volym - En casestudie på Lab.gruppen

Due to increasing product availability and higher demands on fast deliveries, the competition between companies is growing. To be able to satisfy the customers? requests an efficient logistics system with short throughput time is required. By using tools associated with Lean production companies are able to make great improvements in their manufacturing systems and reduce lead times to satisfy customer demands.There are two classifications associated with manufacturing, high variety and low volume (HVLV) and low volume and high variety (LVHV). The general belief is that the concept of Lean production is difficult to implement in a production environment with high variety and low volume due to the concept being adapted to mass production.

Analys av tidsåtgång vid montering av aggregat på Haldex Barnes Hydraules

Haldex Barnes Hydraulics (HBH) is a company which produces hydraulic aggregates for use in forklifts, construction equipment, and trucks. The last two years the company has expanded. This has lead to an insufficient production of aggregates. Thus wishes HBH to increase their production without making to large investments.This report includes a now-state analysis of the problems and where they are. From this a further analysis of possible improvements are made.HBH works mainly with assembling and this is made manually.

Problemanalys vid Aros Quality Group Enclosure Systems AB

The aim of this report is to increase the knowledge and understanding of the problems within the production at AQ Enclosure systems, and thereby achieve a more stable flow throughout the whole process, a better working environment and better competition advantages. The internal flow along with the external cooperation is very important for the company, because it views flexibility and short leadtime as it is the most important competitive means. The part of AQ production that?s been investigated is the manufacturing of ATM-machines, where the costumer is Banqit. This company is a rater small company with about 4 % of the world market of ATM-machines.In order to achieve the aim of the report extensive interviews have been carried out with employees at AQ.

Sammanställning och produktion av ritningsunderlag till båt

Hanterbara båtar is a new company who builds alumina boats customized for people in wheelchairs. Due to the fact that the company only built two boats yet, the production documentation is not complete. The drawing that does exist is not in an exact standard which makes production planning harder.The purpose of this work has been to make the production of the boat easier and simplify further development and modification. Product development in the form of optimizing details is also one of the main purpose of this work.This is all done by making a 3D-assembly of all the existing drawings. After this is done new drawings will be made and added to the main assembly.

Effektivisering av produkionsflödet för stora cylinderrör på Företaget AB

 This study was conducted in autumn 2008 on the Company AB, which is currently in a growth phase. The company manufactures hydraulic systems for the heavy vehicle industry and has annual sales of approximately 250 MSEK with 165 employees.The rapid growth and unchanged planning is the starting point for this report. It all began in 2005 when the company received an unusually large order. During this period, the first priority was to satisfy customers and all other focus was disregarded. This has primarily resulted in a messy production and long throughput times.

Information ochmaterialflödesförbättrings analys

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Analys av miljöaspekter för en planerad svensk fabrik i Kina

A Swedish company, company F, will establish a new factory in China. Company F is adivision within Company F. The factory in China will manufacture wire products. Thepurpose of this final thesis is to analyse which legal and practical measures the company hasto undertake during the process of localization to get approval from the Chineseenvironmental legislation.An analysis of the influencing factors on the environment from the production in theconstruction in Sweden was carried through. A material-balance was analysed according tothe flowchart of the production.

Utformning av ett materialflödessystem anpassat för HSP-Gripens produktion

Like many small-time companies there is a need to improve the flow of materials at HSP-Gripen AB. The company develops and manufactures hydraulic-powered grapples for the machine- and forest industry. By mapping the material flow in the current production and gathering necessary data, suggestions on how different parts of the production could be controlled is presented in this dissertation. This has been achieved by the study of relevant scientific literature. The suggested ways of controlling the production consist of 2-bin systems, hybrid material flow system as well as a cyclic product-planning.

<- Föregående sida 2 Nästa sida ->