Sök:

Sökresultat:

1409 Uppsatser om Plant and equipment - Sida 5 av 94

VSM och 16 förluster

With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.

Investeringskalkylering : en kartläggning och analys av kalkyleringsarbetet på Volvo Construction Equipment

Problems: How does Volvos CE: s four Swedish plants work with investment appraisals? Does the work differ between the plants? If differences exist, what can be improved in order to make the work more uniform?  Purpose: To map the work with investment appraisals at Volvo CE: s four Swedish plats, to analyze differences in work between the plants and give proposals to a more homogenous working.Method: A method of qualitative nature. The study mainly contains raw data from semi structured interviews. Secondary data, such as internal policy documents and documentation of completed investment projects, has supplemented the raw data. Analysis: The mapping shows significant differences in work with investments between Volvo CE: s Swedish plants.

Ekosystemstödjande och multifunktionella växtval i urban miljö : En fallstudie med utgångspunkt i Nacka stadsbildning

This study has investigated how urban vegetation can be used in a multifunctional way to support ecosystem services in urban environments. Nacka municipality is in the start-up phase of building what is to become Nacka city. This provides a unique possibility to study and analyse what role the vegetation play in making the city a healthy living environment and how it needs to be adapted in order to be resilient against changing climate conditions and how the effects of those changes can be regulated. The study further investigates how airborne pollution, caused by urbanization processes, can be regulated or reduced by vegetation or species selection. Methods used in this study were a combination of qualitative interviews and literature studies, seeking to answer the questions: Which specific ecosystem functions are needed in the urban environment and which aspects will influence the ecosystems ability to deliver the functions in demand? And which plant species have the right mechanisms needed to deliver those functions? These questions have been studied and analysed in a local based context where the local conditions ands site specific needs of Nacka define criteria for plant selection.

Fröskörd av hampa : metoder och tekniker för fröskörd av industrihampa

Hemp is an ancient cultivated plant that came to Sweden in the 1st to 2nd Century and was particularly interesting for use for food, clothing and building materials. Over time, other applications have been developed for hemp, e.g. in energy and health products. Interesting new uses for hemp continue to be identified and this fascinating plant has incredibly versatile applications.In this project, seed production of industrial hemp in Sweden was studied and evaluated. Five different methods are described, four of which are proven under Swedish conditions.

Styrsystem : För en forskningsutrustning

The division of Engineering Materials at Linköping University, department of Management and Engineering, conducted a research project concerning Fatigue life of thermal barrier coatings during 2009. During this project equipment to provoke these fatigue failure by rapidly heating and cooling test subjects in cycles, was ordered.Design and manufacturing of the equipment was handled internally at LIU.The equipment was built using a furnace that is lowered and raised over the table where the test subject is placed. To keep the temperature of the furnace a lid slides in place to close the downward facing opening of the furnace when it is in the raised position. On this door there is nozzle that is used to cooling of the test subject by air.To make sure that the equipment can work independently you need an automation controller that can evaluate if movement can occur without danger of collisions. The control system also needs to monitor that all elements are performed according to plan.This degree project is based on a modular system from OPTO 22 and includes the configuration of a PLC that will be supplied with logic and a user interface.The degree project resulted in a graphic interface in which a user can set desired values for different parameters and get information about current values for them.

Analys och organisering av ö-drift för en samförbränningsstation vid Åmotsfors bruk

Åmotfors Bruk AB (ÅBAB) has today an inefficient production of steam for the manufacturing of paper. Unpredictable energy prices and modernisation of the current equipment has been the underlying factors to invest in a thermal power plant, mainly driven by garbage. This facility will not only use the steam for paper production, it will also generate electricity through a steam turbine. Today, when a fault on the supplying line occurs which leads to disconnection of the external grid, all the support of electricity to Åmotfors Bruk (ÅB) will disappear. This will lead to major interruptions in the paper production, which will cause severe economical losses.

Mätutrustning för kosmisk strålning

The purpose with this examination is to build a measureequipment to AerotechTelub AB (AT), who will registrate fault in SRAM-memory in contact with cosmic radiation. The equipment will be created around developcard from Memec Design with FPGA from Xilinx. The logic in the FPGA will be implemented with the hardwaredescribed language VHDL. The SRAM-memory that will be tested is build in CMOS-teknologi. The memorycells will be loaded with a predecided bitpattern.

Geotermisk fjärrvärme i Gunsta

Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW. To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.

Energikrav i upphandling av bygg- och anläggningsprojekt

The building and plant sectors represent a large part of Sweden?s energy use. Putting energy requirements in public procurement as a tool for reducing energy consumption in the building and plant sectors is therefor an opportunity that operators can take advantage of. The aim of this thesis was to map the energy requirements in procurement that operators in the public sector use today in building and plant projects. The analysis was made with respect to if the energy requirements corresponded to the parts with large energy use in building and plant projects and also in which way energy requirements in procurement are written in the contract.

Utredning av potentiella hälsorisker i samband med slagg- och slaggvattenhantering vid Hedenverket, Karlstad

In this study potential health risks for employees in connection with handling of bottom ash and bottom ash water at a Municipal Waste Incineration (MWI) plant have been investigated. Air surrounding the bottom ash and the bottom ash water has been examined. MWI is one of the primary ways to manage solid household waste, and bottom ash is the main solid residue produced by the incineration process. Bottom ash constitutes about 15-20% of the original waste. The bottom ash is extinguished in a water bath (bottom ash water).The study was carried out in a MWI plant in Karlstad, Sweden.

Aquaculture effluents as fertilizer in hydroponic cultivation : a case study comparing nutritional and microbiological properties

This paper evaluates the prospects for utilizing aquaculture effluents as a nutrient source in organic hydroponic, as is the case in aquaponics. The development of organic hydroponics is dependent on replacing synthetic fertilizers with organically derived nutrients, such as those found in aquaculture effluents. Also, in hydroponic cultivation the establishment of a plant pathogen suppressive micro flora is part of the plant protection strategy. Therefore, both nutritional and microbial qualities of aquaculture water and organic hydroponic nutri-ent solution were analyzed and compared. Results showed both aquaculture water and or-ganic hydroponic solution to be deficient in a number of essential elements, although or-ganic hydroponic solution was closer to recommendations.

Dynamisk modellering av kärnreaktor

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Lantbruket som energiproducent : tekniska, ekonomiska och miljömässiga förutsättningar för fjärrvärmeproduktion med lokalt skogsbränsle

A third party access to district heating networks has been proposed in Sweden, to increase the competition on the district heating market. Such third party access could create opportunities for the agricultural sector as an energy producer. This study describes the technical, economical and environmental prerequisites for a farmer cluster to build and run a heating plant, fueled with local wood fuel. The heating plant in the described scenario is 8 MW and will supply a village of 1000 houses, and is fueled with wood chips exclusively. Supplying a heating plant with fuel puts high demands on the logistics, since there need to be a continuous flow of fuel. In the scenario, wood residues from felling and thinning is stored in stacks in the forest, and a few times a year chipped and transported to a storage area at the heating plant. In the study, an estimation of the profitability has been made by estimating the cost of the investment, personnel, operating and maintenance costs and costs for the fuel and ash handling.

Momentfördelning i pelardäck av armerad betong

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Kvalitetsarbete i samband med byggande av betongkonstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

<- Föregående sida 5 Nästa sida ->