Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Strategier hos de stora svenska byggföretagen 1992-2006
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Att mäta effektivitet i utvecklingsarbete : En kartläggning av förutsättningarna på Saab Aerosystems
Ökad kunskap och kännedom om sin organisations prestanda är något som alla företag eftersträvar. Att kunna prediktera vilka resurser ett utvecklingsarbete kräver är en förutsättning för att kunna genomföra ett bra offertarbete. Dessutom krävs prestandakännedom för att kunna sätta mål för det interna målstyrningsarbetet. Kännedomen uppnås genom ett etablerat mätsystem, som innefattar insamlande och användande av mätdata, det är inom detta område som vårat examensarbete har sitt fokus. Närmare bestämt belyses framgångsfaktorer vid implementationen samt hur användandet av mätdata bör gå till.
Projekteringshandbok i praktiken. En studie om hur en projekteringshandbok används och kan förbättras
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Brand equity and corporate responsibility : a review of brand valuation methods
During the last decades, brand equity has been a priority topic for both practitioners and academics. In accordance with the structural changes in the economic settings caused by the so-called "new economy", corporations being confronted with a shift on perceived business value structure from tangible assets to intangibles. On the other hand firms increasingly are adopting more responsible behaviour towards their societies. In this context, one critical question is to understand how corporate conduct may affect brand equity. The purpose of this study was to find how brand equity (BE) measurement methods embrace corporate responsibility (CR), based on a literature review.
Systemanalys av skogsbränsletransporter :
At the end of 70s and the beginning of 80s, 18 terminals was built and used for chipping wood residue from clear cuttings. Most of the terminals was terminated before the 2000s but with the high oil- and energy prices that we can see today there might be a place for these terminals again. The goal with the study was to analyze and compare economical differences between 5 different logistical systems, collected data was used with a set of formulas. The systems include long range transport of slash, chips and bundles. Three of the systems include transport by lorry to industry the last two includes a terminal with access to train transport.
Kraft och Deformationsmätningar på Snap Load gummi
The power consumption has grown rapidlyin the last decade. Fossil fuels and theneed for alternative energy sources aregreat. Ocean waves are a renewable andsustainable source of energy that hasbeen relatively untapped. At UppsalaUniversity research and development havebeen done for several years. Severaltypes of wave energy converters (WEC)have been created.
Mätning och undersökning av elkvalitén i elnätet på reningsverket GRYYAB, Göteborg
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Uppföljning av räckesreparationskostnader inom Vägverket Region Norr/Sydöst
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ekonomiska konsekvenser för energisparande åtgärder vid ombyggnad. Upprustning av miljonprogrammet
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Key Performance Indicators inom en industriell inköpsorganisation
Världen befinner sig i en ekonomisk kris och många företag jobbar dagligen med effektivisering. Det finns många företag som oroar sig över framtiden och alla måste se över sina kostnader så man klarar sig även om en rådande lågkonjunktur råder. Ett sätt att förbättra effektivisering är att förnya inköpsavdelningen, att göra bättre inköp helt enkelt. Examensarbetet har utförts på LKAB som jobbar med ett effektivitetsprojekt som heter LKAB 370. Det innebär att man ska effektivisera företaget på så många sätt som möjligt Målet med LKAB 370 är att uppnå ett nytt kostnadsmål på 370 kr/ton järnmalm.
pm3-revision : En välgrundad metodutveckling av metod för revision av förvaltningsstyrning
In the field of maintenance management there are but a few models an organization can use. The one model that has risen to the status of being the de facto standard in Sweden is pm3(på maintenance management model). The aim of this study is to lay the groundwork for a new method of evaluate the use of pm3within organizations. Today there is no uniform way of performing such an evaluation, which is necessary in order to diagnose the performance of the systems maintenance organizations.In the process of creating our own method for performing this kind of pm3audit, we further developed the ideas from a study by Lagsten & Nordström (2013) that was performed at the county Region Skåne. The authors of that study had developed ideas about using method rationale as a basis of creating a method for pm3auditing.