Sökresultat:
3650 Uppsatser om Motor test - Sida 6 av 244
En analys av testprocesser med TMap som testmetod
Today there are many system development projects that break both budget and time plan. Often this depends on defects in the information systems that could have been prevented. The cost of test can in some cases be as high as 50 % of the projects total cost and it's at the same time an important part of development. Test as such has moved its focus from the software it self and its faults to a wider perspective on whole infrastructures of information systems where assure a good quality is important. Sogeti in the Netherlands have developed a test method called TMap (Test Management approach) that can be used for structured testing of information systems.
Repeterbarheten hos Schirmer I test
Syfte: Syftet med den här studien var att undersöka repeterbarheten hos Schirmer I test samt att undersöka om det fanns något samband mellan Schirmer I test och enkäten TERTC-DEQ.Metod: 26 personer deltog i studien. Innan första mättillfället fyllde försökspersonerna i ett informerat samtycke och enkäten TERTC-DEQ. De undersöktes med hjälp av ett biomokroskop och deras ögon graderades med hjälp av Efron och CCLRU grading scales innan första mättillfället. Schirmer I test mättes vid tre tillfällen med en veckas mellanrum.Resultat: Resultatet av mätningarna visade att det var låg repeterbarhet hos Schirmer I test om man utför tre upprepade mätningar. Resultatet visade också en korrelation mellan testresultaten och enkäten TERTC-DEQ (r=-0,6184), det vill säga de försökspersonerna som hade ett högt resultat på Schirmer I test hade också en låg summa på enkäten TERTC-DEQ.
Redo för reflektion? : en studie om ledarskapet i Trollhättans Scoutkår, Svenska Scoutförbundet
Today there are many system development projects that break both budget and time plan. Often this depends on defects in the information systems that could have been prevented. The cost of test can in some cases be as high as 50 % of the projects total cost and it's at the same time an important part of development. Test as such has moved its focus from the software it self and its faults to a wider perspective on whole infrastructures of information systems where assure a good quality is important. Sogeti in the Netherlands have developed a test method called TMap (Test Management approach) that can be used for structured testing of information systems.
Grafisk produktion i mindre spelutvecklingsföretag
Detta arbete avslutar magisterutbildningen inom Industriell design vid Luleåtekniska universitet. Arbetet har utförts på uppdrag av Agency-9, utvecklareav Javabaserade 3D-motorer. De har tekniken för att producera dataspel avtoppklass men ingen grafisk formgivning och produktion, och är i stort behovav att få igång detta. För att visa upp funktionaliteten i deras 3D-motorAgent FX vill de även ta fram ett demo. Metoderna som använts under arbetet baseras på teorierna om systematiskproblembehandling som lärs ut vid Institutionen för arbetsvetenskap, LTU.
En studie av sex ISA-system
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Dynamisk simulering av avfallskraftvärmeverk
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Fysprofilen hos puckelpiståkare på elitnivå och en jämförelse av fysisk prestation över tid
AimThe aim of the present study was to evaluate physical performance according to ?fysprofilen? in skiers of the Swedish mogul ski team and to compare their physical performance at three test occasions during one year.MethodsAll eight elite mogul skiers at the Swedish national mogul ski team during the seasons 2011/2012 and 2012/2013 participated voluntarily in this study. The test battery ?fysprofilen? was performed at three test occasions, October 2011, May 2012 and October 2012. Muscle strength was evaluated with squats, bench press and grip strength; power was evaluated with power clean, squat jump, countermovement jump with and without arm swing, Harre´s test and the 30 meters sprint.
Rationell plattläggning. Studie av ett arbetsmoment
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av Vikan Kross och Asfalt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Prognostisering av höga grundvattennivåer med Chalmersmodellen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Design and performance of Small scale sensory consumer tests
Small scale internal consumer tests provide a company with a cheap way to get valuable information regarding their products advantages and flaws. Therefore the demand for possibilities to do this kind of test has increased. This report is part of a new sensory project at Unilever. It presents a method for sensory comparison of the company?s own products with the corresponding competitor products.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.