Sök:

Sökresultat:

8125 Uppsatser om Model for cost saving potential - Sida 2 av 542

Styrsystem för testriggar till linjära aktuatorer

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Öppenhet och kostnad för eget kapital: En studie på den svenska marknaden

Previous research has discussed how voluntary disclosure relates to the cost of equity capital. Theories of estimation risk support a negative association between disclosure and cost of equity capital, as empirically documented by Botosan (1997) among others. In this Bachelor thesis we investigate whether such a relationship exists on the Swedish capital market. Using the CAPM to estimate the cost of equity capital and a disclosure index based on Aktiespararen?s annual evaluation of corporate disclosure, we test a model where disclosure explains cost of equity capital.

Flödet av elektrisk och elektronisk apparatur i Sverige 1995 - 2011

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Potential för värmeåtervinning från mjölkkylanläggningar

The present climate discussion has made energy efficiency an interesting topic. Saving energy does not only help the climate but also saves money for the energy consumer. The purpose of this thesis was to examine the potential of heat recovering from milk cooling. Two milk farms, one with voluntary milking system, VMS, and the other with conventional milking system was used to measure interesting temperatures and electricity consumptions. The numbers were used both to do theoretical calculations and to construct a SIMULINK model. To calculate the potential for heat at milk farms theoretical calculations were made in MATLAB using a reference farm with different combinations of heat recovery and pre cooling. The farm was assumed to keep a dwelling house with the annual heat consumption 18165 kWh.

Föroreningskällor till sjön Anten. En kartläggning och kvantifiering av kväve- och fosfortillförsel

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Beslutsmodell för inköp och lagerhållning av motorer i ett produktionssystem : En fallstudie på Sandvik

AbstractIt is important to choose which spare parts to keep in stock. With the right spareparts in stock the costs for inventory and production loss will decrease. Cavalieri et al. (2008) highlights that the balance between inventory cost and production loss is underestimated.  It affects the company and must be considered before decision on purchase.The problem with spare engines is that they are all more or less critical for the production. That can be a reason for why no previous research targeting engines and classification of with engine should be kept in stock has been found.

Nyckeltal för ekologiska fotavtryck för stommar i flerbostadshus

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Identifiering och reducering av köer i samband med återbesök

Purpose ? The purpose of this thesis is to develop a total cost model for container transports and create a tool that calculates a suitable transport quantity from an economic view, which fulfills the demands on delivery service. To achieve this purpose the following questions will be answered:Which costs are affected by the decision between the two transport alternatives LCL and FCL?   How does the decision of sending product LCL or FCL influence the delivery service?  How can a tool be constructed to simplify the decision-making process regarding the choice of sending products LCL or FCL?  Method ? A total cost model was developed. This model is supported from existing literature.

Kostnadsallokering genom ABC-kalkylering – en empirisk studie av OMX

As IT service departments in organisations are becoming more complex and customised, the indirect costs are increasing in relation to the total costs. The difficulty of fully estimating and identifying the spread of the cost in the IT service department is increasing. As a result, firms tend to budget the business unit as a total cost rather than as a spread of defined costs. In order to deal with this challenge an ABC calculation will be applied. The Time Driven ABC model will be conducted in OMX´s Servicedesk unit within the IT services.

Kommunikation och samverkan mellan projektering, inköp och produktion (PIP) i ett byggprojekt. En utredning av en PIP-plan och ett förslag på en arbetsplan.

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Energisparläge i automationsindustrin : Potential för att minska tomgångsförluster med industriella styrsystem

Former studies have shown that a considerable part of industries? energy usage can stem from idle times in the production. This thesis, carried out at Siemens Industry sector, evaluates the potential for using the control system to automatically put machines into energy saving mode during idle times. The main part of the thesis consists of a case study performed on machine tools at a Scania production site in Södertälje. Through load measurements the potential for energy savings was determined.The results show that there is a great potential for energy savings during idle times at the site.

Totalkostnadsmodell för distributionsnätverk med internationella containertransporter

Purpose ? The purpose of this thesis is to develop a total cost model for container transports and create a tool that calculates a suitable transport quantity from an economic view, which fulfills the demands on delivery service. To achieve this purpose the following questions will be answered:Which costs are affected by the decision between the two transport alternatives LCL and FCL?   How does the decision of sending product LCL or FCL influence the delivery service?  How can a tool be constructed to simplify the decision-making process regarding the choice of sending products LCL or FCL?  Method ? A total cost model was developed. This model is supported from existing literature.

Systematiserad erfarenhetsåterföring inom byggbranschen. Ett arbete för att minska återkommande produktionsfel inom Tuve Bygg.

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Kostnadsallokering genom ABC-kalkylering ? en empirisk studie av OMX

As IT service departments in organisations are becoming more complex and customised, the indirect costs are increasing in relation to the total costs. The difficulty of fully estimating and identifying the spread of the cost in the IT service department is increasing. As a result, firms tend to budget the business unit as a total cost rather than as a spread of defined costs. In order to deal with this challenge an ABC calculation will be applied. The Time Driven ABC model will be conducted in OMX´s Servicedesk unit within the IT services.

Estimering av kapitalkostnad för onoterade företag

The cost of capital for traded companies is basically assessed on information from thefinancial market. Small and non-traded companies are lack of this necessary financialmarket information in order to determine an appropriate equity risk premium and tocompute the cost of capital.In the absence of financial information necessary for an external investor, it is difficult toevaluate a non-traded company with the Capital Asset Pricing model (CAPM), which isbased on the financial market information. It measures only the systematic risk, which isthe contribution of one share to the market risk of a portfolio. It is therefore important tofind models that reflect the small and non-traded companies? real business value and theirunique characteristics.

<- Föregående sida 2 Nästa sida ->