Sök:

Sökresultat:

3065 Uppsatser om Marginal electricity production - Sida 13 av 205

Produktion och dimensionering av träboj i vågkraft

This thesis gives suggestions as to how to design a wooden-based wave-power buoy. The thesiswas carried out at Uppsala University in collaboration with the Division of Electricity and AppliedMechanical Engineering. The product was conceived and developed taking into consideration anumber of requirements put forward by the supervisor, Magnus Rahm. The most importantdemands were that the material used should be able to withstand pressure from the sea withoutbeing damaged and that the production costs should be low.Department of Engineering Sciences, Division of Electricity at Uppsala University was visitedseveral times to discuss issues including the various ideas with the supervisor Magnus Rahm, andwith several people in the department.The work started by studying available literature in order to get background information aboutsuitable methods available for the project and to see how similar projects were carried out. Thereason for this was to get a better understanding of this particular problem and how to solve it.After consulting the supervisor, the group decided to construct four different buoys using fourdifferent materials.

Turbinkretspump system - Kraftvärmeverket i Borås

The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.

Hälsobeteende bland sjuksköterskor och undersköterskor : En studie om oregelbundna arbetstider på Ålands hälso- och sjukvård

In our everyday life we are faced with many choices that have consequences on the environment. One of these is the food we choose to eat since food production has a big impact on the environment. In organic production the aim is to have a natural production process, where environmental impacts are minimized. By choosing organic food it is therefore possible to contribute to a better environment. A large number of meals are served every day in the public sector, which makes it an important player in the consumer sector that could make a major difference for the environment..

Energikartläggning hos RostiGP i Gislaved

In today?s modern age, energy consumption has become a major issue, both from an environmental viewpoint and cost perspective. Because of a rapid technologic change and increased costs of production of electricity, the demand to develop effective methods for energy efficiency industries have grown.The electricity-intensive industries, such as plastic industry, the demand to reduce energy consumption has grown significantly over the past 10 years, which have led to the development of different methods to determine and locate energy-consuming parts in the industry. This also means being able to prioritize and organize activities in the industry.In this study the measurements of voltage, current, power and PF performance on injection molding machines (K-TEC 275 form Ferromatik Milacron in Germany) with a focus to locate, within a machine, various measures that could improve energy use in the plastics industry, in this case RostiGP in Gislaved. These measurements have been carried out with the help of a power quality clamp meter to carry out time logs of the machines for some time during normal word rate.

Till  framtida utvecklare

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Energiewendes påverkan på det nordiska kraftsystemet

Both the German and the Nordic power markets are seeing dramatically changed conditions due to an ongoing process of expanding the share of renewable production in the systems. For the German part this comes from heavy subsidies which have led to an explosive development in installed capacity of photovoltaic and wind based production. After the Fukushima incident it has been decided to shut down all Germanys nuclear plants. This capacity drop is however not of the same magnitude as the increase in renewables, but will impact the stability of the power system. The Nordic power system which already has a surplus of power sees an even further increase, coming mainly from construction of new nuclear plants in Finland and a general increase in wind farms.

Kostnadsuppföljning avproduktionskalkyler

Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.

Hybridlärkens tillväxt i Snogeholm : hur påverkas produktionen i blandbestånd jämfört med trädslagsrena bestånd?

The hybrid larch (Larix x eurolepis Henry) is a fast growing tree species and was introduced in Sweden for about 50 years ago. The high growth and expected resistance to diseases are probably the main reasons of introducing the tree species into the Swedish forests. The purpose of this thesis was to document the production of hybrid larch planted in the Snogeholm landscape laboratory and to compare the production in the pure hybrid larch stand with the mixture together with pedunculate oak (Quercus robur). The data collection in Snogeholm since the establishment has been carried out by the Swedish University of Agricultural Science (SLU). The fieldwork for the thesis was carried out in 3 stands, containing hybrid larch, pedunculate oak and a mixture of hybrid larch and pedunculate oak, in order to be able to compare the total stand production of the areas. The results show that the total production of hybrid larch in the mixed stand only is 35 % compared with the total production of hybrid larch in the pure stand. Therefore, the hypothesis that the total production of hybrid larch is equal to the planted mixture with pedunculate oak was rejected. The other hypothesis that the total production of a 2 hectare large stand containing a mixture of hybrid larch and pedunculate oak would be greater than the total production of two pure stands of 1 hectare containing hybrid larch and oak each was also rejected. In the studied case the total production was 45 % greater if hybrid larch and pedunculate oak was planted in pure stands. The results from the case-study only indicate that the total production of hybrid larch and oak under the investigated conditions can be higher when planting the two species in pure stands compared with a mixture of the two species.

Biogasprocessen : Bestämning av verkningsgrad

Biogas is increasingly used for fuel in for example vehicles and it´s produced in a biogas processconsisting of the steps of pretreatment, digestion and gas cleaning. The pretreatment is a method usedto increase the gas production and / or destroy pathogens. The digestion is the stage when anaerobicmicroorganisms convert bio-mass of a substrate to a raw gas containing about 65% of methane. Thegas cleaning is used to increase the methane content to about 97% so the gas can be used for motors invehicles. The biogas part of the Ekeby sewage plant in Eskilstuna is using multiple substrates.

Forsmark 3 ?Ett Framtida Biobränslekraftverk?

Recent turmoil surrounding nuclear power as an energy source, especially since the accidentat Fukushima, has largely contributed to the debate of whether or not nuclear power should beused as an energy source. This study has examined the economic feasibility of replacingForsmark?s 3rd nuclear reactor with a bio fueled power plant, and find out how this could bedone.The power generation that has to be replaced is equal to 1170 MWe. To replace this, 6 largescaleCFB-boilers, each providing over 200 MWe, were necessary. In addition to this, eachboiler required their respective turbine sets, comprising one high-pressure-, and one lowpressureturbine with intermediate reheating capacities.Based on this, a rankine-cycle was modeled using the software EES, to be able to calculatethe total heat required in the power plant.

Framgångsfaktorer och hinder med Lean produktion i Kina

AbstractLean production has become one common concept within industries to make the work more effective and to meet today?s hard competition. A challenge for Chinese production is the threat from new low cost countries. It will become very difficult to succeed to produce to a lower cost than these countries; this led to that Chinese companies must develop new strategies, according to Lee and Zhou (2000). This will put China in front of new challenges and new strategies can be needed to retain their strong competitive advantages.

Optimering av ett småskaligtvattenkraftsystem

This master thesis covers the seasonal planning of a small scale hydropower system. The system in this study is owned and operated by Mälarenergi Vattenkraft AB. The total system consists of 4 different main rivers with 24 hydropower stations and several dams. The total installed power in the system is 43.75 MW. Most of the hydropower stations are regarded as small scale hydropower stations and thus entitled to green certificates.In this report the issue of planning is formulated as an optimization problem.

Självförsörjande elgenerering : Kan Orust bli självförsörjande på förnybar el?

Orust Kretsloppsakademi is a nonprofit organisation, with a goal of annually generate the same amount of electrical energy that is consumed. Orust is an island on the west coast of Sweden, north of Gothenburg. The population of 15 000 reaches 40 000 during summer, due to the large amount of vacationer. The total electricity demand is 174 GWh a year with a maximum power need of 32 MW. This report presents an analysis for the plausibility of their plan and from a power system stability perspective, the effects on the electrical grid.The conclusion is that the restraints for development of power generation from wind, solar and wave generation, are the power systems capability to transfer power, primarily in the transformers of the grid.

Risk- och sårbarhetsanalyser för smarta elnät

The electrical grid needs to be changed in the future in order to manage more distributed and renewable generation and also to make it possible for electricity consumers to be more active and aware of their electricity consumption. This future grid is usually referred to as a smart grid. With the transition to a smart grid, new challenges occur. One method to determine those challenges is to perform risk and vulnerability analyses. InStockholm, the new urban district Stockholm Royal Seaport is built.

Implementering av Lean genom TAK och SMED

This graduation work is a result of implementing Lean Production using OEE and SMED at Enics Sweden AB in Malmö. Enics doesn?t have an established improvement concept and therefore should this work serve as an introduction to possibly start with Lean Production. A result in this report is that an OEE value has been identified within a common order at Enics. Other results are that an implementation of a Lean-board has been implemented and furthermore, within SMED, a flag that indicates changeover..

<- Föregående sida 13 Nästa sida ->