Sökresultat:
122 Uppsatser om Manufacture - Sida 5 av 9
Byggnadsfysikaliska riskbedömningar : Metod för tidig hantering av fuktsäkerhetsfrågor
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Rationell produktion av platsgjutna stommar för flerbostadshus
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Nyutveckling av hopfällbar kvistsåg
This Master Thesis has been carried out as a new product development project in collaborationwith G-Man Tools AB located in Edsbyn. The purpose of the project was to construct a newpruning saw there the blade is integrateble in the handle, thus a foldable pruning saw.The work has been performed on the occasion of G-Man Tools AB wanted to improve theirproduct range by creating a saw that complement their range of quality saws. They have a similarproduct today, but they do not Manufacture this product by them selves and it is not directlytargeted against garden use, which is a disadvantage when it is one of their major markets.Even though almost the entire chain from the requirements of the users to drawings has beentaken into consideration, emphasizes has been put on generating ideas. However the first thingthat was carried out was to establish a productspecifikation from interviews with users and thecompany?s experience.
Kartläggning av Kassationerpå Bubs Godis
The waste of material is a big expense for Manufacture companies caused by lack of quality. The cost by lack of quality often totaled to a big percentage share of the turnover when all cost related to lack of quality is included. New manufacturing systems like Lean production or Just In Time demands better internal quality for the Manufacturer. To make those manufacturing system with small and none buffer stock successful the quality improvement continuously have to be developed.Measuring of waste of material in Bubs Candy?s factory where not simple due to the products does not have a permanent weight during the manufacturing process.
Separeringsmodul
In cooperation with the Gislaved company Lerocon AB [1], a separation module wasdesigned as a further supplement to the Module System. The aim of theprojectimplementation was that the separation module could be flexible enough to feed themetal pieces, screws, nuts and other items with large variations of size, appearance andmaterial composition. The module should also be cost effective to Manufacture.A separation module is a design which is ment to streamline the work in industries withautomation of the lineoperations. The module feeds the details such as screws, nuts, washersand pieces of metal in a continuous flow in which traps separate the details from each other.Traps may vary depending on the purpose and of the details that are fed. Perhaps it isimportant for the user that the detail-orientation is right after the separation module, whichmeans that all the pieces witch aren´t are fed back in return.For companies and industries in lineoperations that can be made more efficient withautomation, are production flow an important watchword.
Utveckling av instyrningsfunktionen hos ett dockningsinterface
In this project the task has been to develop a product that will facilitate an operation for personnel working in a sterilization center. The operation is to steer the front of a loading trolley into the chamber of an autoclave, a so-called docking. The moment is complicated because the margins to deviate from ideal docking position and still succeed, is very small.The principal Getinge's desire was that the product could be retrofitted at the customers on their existing systems. One of the demands was that the product should fit two types of trolleys, one with a adjustable working height and one with a fixed working height. Getinge is supposed to purchase the system from a subcontractor who shall Manufacture it and the requirement from Getinge is that the cost of purchase mustn't exceed SEK 500Initially principles, solving the problem was developed.
Den mobila prefabriceringsfabriken : Ett nytt produktionskoncept
This is an investigation of a mobile prefabrication factory´s competitiveness and profitability which also will result in a suggestion for a design of the factory. The mobile prefabrication factory is an idea of a new concept for production which is meant to be used in the Manufacture of slab. The main intention with this concept is that by using a fast established prefabrication factory to produce elements near the construction site, thus avoiding transport from the factory to the building site. This means not only an environmental and economic gain, but also that you can avoid risking damage the elements which often occur during transportation. The contractor is owner of the mobile prefabrication factory and can thus avoid long waiting times and cyclicality.
Konstruktion och prototypframtagning av pallväxlare
This thesis was conducted at AB Fredr Wagner in Ösmo in Nynäshamn, Sweden.AB Fredr Wagner provides solutions for the graphic industry and has been asked by acustomer to develop a product that can simplify handling of EUR-pallets, namely amechanical arrangement, further called pallet exchanger that can switch from anempty pallet to a fully loaded one using only hand force.The goal with the thesis was to create design documents for a pallet exchanger, andalso from those documents to Manufacture a prototype for testing and evaluation.A field trip was made to the customer, IKAB mailing in Huddinge, where the palletexchanger is thought to be placed. The purpose of this field trip was to get an insightinto the current work condition and need of change, as well as to gather informationregarding the requirements when it comes to size and robustness of the palletexchanger. Existing equipment on the market that can perform similar tasks werestudied in order to find an optimal solution for the actual pallet exchanger.After the field trip and gathering of information the concept generating phase began.The method used for generating concepts was brainstorming. To decide on whichconcept to use, a concept selection matrix was created. The selection criteriaincluded in the matrix came from the requirements for the pallet exchanger.
Ledinflammationer på häst och intraartikulär behandling med hyaluronsyra : en pilotstudie på hyaluronsyra X
Traumatic arthritis is a common cause of lameness in horses. One of different treatment alternatives of arthritis, is intra-articular injection with hyaluronan. As knowledge about pathophysiology of arthritis and function of hyaluronan is increasing, understanding grows about the mechanism of hyaluronan action in joints. Hyaluronan has, in addition to effects on viscosity, anti-inflammatory and analgesic effects. Extensive research and scientific studies have been made on exogenous hyaluronan.
Evaluation of ELISA and rapid test for the analysis of fecal Calprotectin
ABSTRACTBackground Calprotectin is a protein found in the cytoplasm of neutrophile granulocytes. In the course of inflammatory bowel disease (IBD), calprotectin is released during chronic inflammation in the gut. Activation of neutrophils during the inflammation is followed by activation and secretion of pro-inflammatory molecules such as calprotectin. Calprotectin is stable in stool up to 7 days and can therefore be used as a non-invasive marker for diagnosis, treatment and measurement of the disease activity in patients with IBD. The most common method for analysis of calprotectin concentration is ELISA.
Oljefilmens tjocklek mellan kolvring och cylinderlopp
Hägglunds Drives in Mellansel, Sweden, Manufacture radial piston hydraulic motors foremostwithin applications in the industry. These motors have several sliding contacts, one of these, isthe contact between piston ring and cylinder bore. The radial piston hydraulic motors advantageis to produce high torque in very low rotation velocity, this result in that the maximum slidingvelocity between piston ring and cylinder bore, during the whole stroke, is very low. Theconsequence of this low sliding velocity is that the contact between piston ring and cylinderbore, during the whole stroke, is bound to the boundary lubrication regime. This result in, thatthe piston ring is exposed to wear, thus affect the service life of the complete hydraulic motor.To minimize wear of piston ring, it is essential to determine the oil film thickness between thepiston ring and cylinder bore.
Design av dörr till kaffeautomat : Designing a door to a coffee vending machine
This report was written as a result of a Bachelor Degree Project at the School of Technology and Society at University of Skövde spring 2007, together with Jede AB in Mariestad. The report covers the development of a door to a coffee vending machine that is under construction, and will in a chronological order describe the project from ideas to final product.The project started with a rather extensive feasibility study that thru market research and user tests sorted out the opinions of potential customers, concerning today?s available assortment. Technical areas concerning materials and manufacturing methods were also scrutinized for the consideration of the possibilities of a future production.The next step was to constructively generate ideas and thoughts that later on could grow to be potential solutions. After several weeks of hard work and pieces of good advice and recommendations from the assigner, four comprehensive concepts were built up.
Boktryckaren på Visingsö: en granskning av Sven Almqvists forskning om Johann Kankel
The aim of this thesis is to examine Sven Almqvist?s research on the 17th century book printer Johann Kankel who was employed by count Per Brahe the younger on the island of Visingsö. A model to describe the communications circuit, constructed by book historians Thomas R. Adams and Nicolas Barker are used as well as the historical source criticism method. This model consists of the five phases: publication, Manufacture, distribution, reception and survival.
Flerskiktat papper : en sammanställning av historia, teknik och forskningsresultat
Until the beginning of the 1900:th century the paper making process was handicraft. The paper machines that have been developed since then are as impressing in size as fascinating when it comes to the technique. The process has always been improved to give a better paper for lower costs, with as short Manufacture time as possible. Stratified forming has been a reality since 1830. From the beginning it was applied to board and paperboard.
E-tjänster i kommunala verksamheter : Risker och hot för e-tjänster i Ljungby kommun
The existence for companies today consists of constant challenges with customers that want more individual products with high quality as quickly as possible. For a company to be able to have a short delivery time, it must also have a short production time. This makes streamlining and improvement of processes a big part of a company?s workThis thesis has been carried out together with the company Lasermax Roll Systems AB, a world-leading Manufacturer of feeding, finishing and monitoring systems for high-speed digital printers. They Manufacture their products according to the assembling for costumer order principle.The purpose with this thesis is to map and analyze, the assembling process and the test process at Lasermax Roll Systems AB.