Sök:

Sökresultat:

122 Uppsatser om Manufacture - Sida 4 av 9

Magnetisk separering av malmpebbles i KA3 - mekaniska konceptförslag : Magnetic separation of ore in KA3 - conceptual design propositions

This has been a thesis work for an bachelor degree at Umeå university. The work has been done at LKAB?s facilities in Kiruna and its main purpose has been to investigate and construct some conceptual designs for replacing a screen with magnetic separation in KA3 concentrator plant. First all information available about magnetic separation was gathered and studies of magnetic separation at the sorting plant and studies of the plant KA3 was conducted. Companies that Manufacture magnetic separators were contacted.

Produktionsoptimering av elektromagnetiska omrörare - "ORD 43P" och "EM Stabilizer"

Examensarbetet inom produktutveckling ? konstruktion utfördes under perioden februari till juni 2013 och omfattar 15 högskolepoäng (C-nivå), och är den slutliga kursen inom högskoleingenjörsprogrammet Innovation och produktdesign.Examensarbetet behandlade problematiken kring produktionsanpassning och kostnadsoptimering av två stycken elektromagnetiska omrörare vid företaget ABB, Process Automation, Metallurgy i Västerås. Efter kontakt med handledaren från ABB, Jan-Erik Eriksson, påbörjades projektarbetet med att tillverkningsanpassa konstruktionen av produkterna ORD 43P och EM Stabilizer.För att åstadkomma kostnadsoptimerad och produktionsanpassad konstruktion tillämpade författarna följande produktutvecklingsverktyg: Design for Cost, Design for Manufacture och Design for Assembly. För att kontrollera att konstruktionen blev optimal, men också att den inte brister under belastning använde examensarbetarna det datorbaserade hållfasthetsverktyget finita elementmetoden i CAD-programmet SolidWorks.Val av komponenter baserades på komponenternas pris per kilo.För att välja det optimala materialet, det vill säga högsta hållfasthet till lägsta pris använde författarna materialdatabasprogrammet CES EduPack. De utvalda materialen från programmet kunde inte författarna påfinna som standard på marknaden, varför författarna ändrade strategi till att jämföra och välja material utifrån marknadsundersökning av standardmaterial hos leverantörer.  ORD 43Ps komponenter optimerades konstruktionsmässigt gentemot befintliga komponenter och härvstag och isolerplattor kostnadsreducerades markant.

Rengöringsmaskin av produktionslina : Rengöring av band i produktion

The project was carried out with SwedSafe AB, engaged in hearing and Manufacture of earplugs. Since the company is a world leader in the sale of these products, it is important that they keep a higher level of quality of these products.Production of earplugs is currently a automated manufacturing process that is divided into four conveyor belts and one of the conveyor belts is what will be affected in the project. The belt affected during this process is exposed to various elements such as filling, closing, fermentation and extraction of products. Because the belt gets dirty, degraded products and the work environment is affected. To increase the quality of products and improve the working environment requires an automatic cleaning process, which collects dirt from the belt.The aim of the project is to design a machine that prevents the belt from becoming dirty, preserve molds clean and improve the working environment without disrupting production.

Automatiserad laddning och plundring mellan magasin

This thesis has been carried out within the bachelor program for mechanical engineering at Karlstad University in collaboration with BAE Systems in Karlskoga. The purpose with this work was to design a mechanism and associated parts for loading and unloading of shots between primary and secondary magazine in BAE's new 40mm's ship gun.Parts designed or redesigned among other things a transfer mechanism for shot at loading and unloading, well as a hatch mechanism which makes the shots do not fall out of the primary magazine when making separate use. Various important details have been designed to maintain a good functionality of the mechanism.The construction work has mainly been carried out in the CAD software Solid Edge and its associated FEM module. The construction work has also been carried out on rough calculations for constructed details in order to ensure that they meet the stringent requirements of military use in tough marine environment. Two of the most critical parts of the structure where analyzed with the FEM module for estimating the stresses in the material at the applied load.The final design, which is a result of the thesis, meets the requirement specification and the set targets.

Vändbord : Lokal Logistik

This thesis has been carried out within the bachelor program for mechanical engineering at Karlstad University in collaboration with BAE Systems in Karlskoga. The purpose with this work was to design a mechanism and associated parts for loading and unloading of shots between primary and secondary magazine in BAE's new 40mm's ship gun.Parts designed or redesigned among other things a transfer mechanism for shot at loading and unloading, well as a hatch mechanism which makes the shots do not fall out of the primary magazine when making separate use. Various important details have been designed to maintain a good functionality of the mechanism.The construction work has mainly been carried out in the CAD software Solid Edge and its associated FEM module. The construction work has also been carried out on rough calculations for constructed details in order to ensure that they meet the stringent requirements of military use in tough marine environment. Two of the most critical parts of the structure where analyzed with the FEM module for estimating the stresses in the material at the applied load.The final design, which is a result of the thesis, meets the requirement specification and the set targets.

Hjullyft

The graduation essay has been carried out in co-operation with Kalmar Industries in Lidhult, Sweden. The purpose of our essay was to develop a complete construction solution on a hoist that could lift a laying wheel, lift it up and then turn it 90 degrees. After that the wheel shall be placed in a special holder.The background of the essay is a record of reports of damage wheels when they been incorrect lifted with a forklift. The hoist shall be used together with the same forklifts that manage the wheels today. Together with our instructor at Kalmar Industries we developed a requirement specification and from that we got free hands.However this was not the main task from the beginning, then a simular hoist should be develop but used directly in the assembly workshop without using a forklift.We started to find principle solutions that later was evaluated against the requirement specification.

Effekten av Bisfenol A (BPA) på hanråttors (Rattus norvegicus) reproduktion

Today evidence exist that environmental chemicals deteriorate male sperm quality and that testicular cancer is increasing. Bisphenol A (BPA) is a chemical with estrogenic effects used in the Manufacture of polycarbonate plastic and are found in, for instance, plastic boxes, feeding bottles and food containers. Much of the research on how men's reproductive ability is influenced are performed on rats. This review article complies how male rat reproduction is affected by BPA as a model for humans. Studies have investigated how sperm are affected, hormonal changes during reproduction and how reactive oxygen species (ROS) affects sperm.

Askdeponi i bergrum : Metoder för slurrytillverkning

This thesis work has been carried out at the consultant company Pöyry Sweden AB in Norrköping, whom performs the task for E.ON heating Sweden AB, Händelöverket in Norrköping. The report shows methods to Manufacture slurry consisting of fly ash and water. The slurry shall be pumped into several former oil storage rock shelters that E.ON has put into operation for the specific purpose. The ash mixture also develops hydrogen gas in contact with water.The work has aimed to produce different suggestions of methods and equipment that can be used for the objective. Mixing method and security issues were in centre while working with the suggestions.

CAN-understödda FMS-tjänster för entreprenadbranschen

The comprehensive purpose of this Master of Science thesis is to examine which fleetmanagement services for engineering vehicles, ?Fleetech? preferablyought to develop inorder to reach a broad market and meet the demands of contractors.Scanty explained, fleet management is the management of a company's vehicle fleet and theservices can include a range of functions such as driver management and fuel management. Inshort the thesis encompasses four sections:1.Survey of the general contractor industry: The survey has been preformed toevaluate the potential size of the market for fleet management services in the generalcontractor industry.2.Needs analysis: The needs analysis aim was to define what contractors tasks andgoals are, and to determine what functions they want and need from a system.3.The use of CAN and the technical premises: The prerequisite for developing asophisticated and generic system is that vehicle data can be accessed from the CANbuss.The use of CAN standards in construction equipment has therefore beenexamined.4.Specification: An explicit set of requirements have been set to be satisfied by a fuelmanagement service, based on CAN standard protocol J1939.Important conclusions: The use of CAN protocol standards are extensive and the prerequisitesfor developing elementary and CAN based services good. The services should be compatiblewith different Manufacture?smachines.

Bygga hus i traditionell härjedalsstil

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Energideklarationer - Marknad och Kundkytta

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Utredning av primärluftförvärmning till två avfallseldade pannor

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Inferno Light : Den mekaniska konstruktionen runt ett larmsystem

This thesis describes how the development of a mechanical enclosure to an alarmsystem proceeded. The project was made on behalf of Inferno Light Indusec AB.The goal set to this housing would offer a home alarm in which Indusec?s uniquesound system would give the customer a new alternative on the market. They wantedto, among other things, create an aesthetically but at the same time affordable alarm.The aesthetic theme is something that is missing in today?s market.

Energieffektivisering av stenstadshusen - genom byggnadstekniska energisparåtgärder

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Anpassning av passivhus för ett kallare klimat - teknisk och ekonomisk analys

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that Manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

<- Föregående sida 4 Nästa sida ->