Sök:

Sökresultat:

504 Uppsatser om Load balancing - Sida 4 av 34

Impulsmätning medelst gradvis deflektion av alla sprayer från högtrycks common rail spridare

A method for measuring the total impulse from a multi hole diesel injector, introduced inprevious thesis work, ?Development of a method and a device for measuring the momentumrate of fuel sprays?, by Mikael Lindström, has been further developed and tested. The conceptis to simultaneously deflect all sprays from a multi hole diesel injector by using a bell shapeddeflector. The fuel sprays are deflected straight down from their initial umbrella angle, andthe resulting deflection force is measured in a thin strained section of the load cell. The strainis given by three strain gauges, with quarter-bridge circuitry for each gauge.

Verifiering av Kedertakstolen

The Kedertruss is the loadbearing part in the Keder weatherprotectionsystem and it has been analyzed concerning its loadbearing capacity. The Kedertruss is produced and manufactured by Wilhelm Layher GmbH & Co. KG and this report has been made for their Swedish division Layher AB.  The Kedertruss, designed in Germany according to German designcode, has been recalculated concerning Swedish conditions according to Eurocodes and a ongoing European standardization project. The two-dimensional program Winstatik Frame Analysis has been used for evaluation of load effects. Capacity has been calculated by hand-calculations and it has been verified that the Kedertruss in its larger spans isn?t able to withstand the loads.

Livscykelbaserad miljövärdering av en ny kontorsbyggnad : En jämförande studie mellan två analysmetoder

This Master?s Thesis aims to illustrate in what ways the two Swedish environmental assessment tools, the Environmental Load Profile and EcoEffect differ and if performed valuations gives different results and environmental goals.The built urban environment causes about half the environmental loading in Sweden. The society?s ambition towards sustainable development has resulted in demands reducing the environmental load. One way to accomplish this change is with the assistance of tools for environmental assessment of the built environment.

Verifiering av Kedertakstolen

The Kedertruss is the loadbearing part in the Keder weatherprotectionsystem and it has been analyzed concerning its loadbearing capacity. The Kedertruss is produced and manufactured by Wilhelm Layher GmbH & Co. KG and this report has been made for their Swedish division Layher AB.  The Kedertruss, designed in Germany according to German designcode, has been recalculated concerning Swedish conditions according to Eurocodes and a ongoing European standardization project. The two-dimensional program Winstatik Frame Analysis has been used for evaluation of load effects. Capacity has been calculated by hand-calculations and it has been verified that the Kedertruss in its larger spans isn?t able to withstand the loads.

Analys av designalternativ för snabbare dynamik i kolkraftverk med koldioxidavskiljning

Combustion of fossil fuels is today the dominating source of energy. During combustion,carbon dioxide is formed. The carbon dioxide accumulates in the atmosphere,which raises the global average temperature on earth through the so called greenhouseeffect. The only way to reduce the emissions of carbon dioxide from combustionin a coal fired power plant is through carbon capture and storage (CCS).Post-combustion capture is a technology to separate carbon dioxide from the uegas after the combustion for efficient transport and storage. The steady state operationof coal fired power plants with post combustion capture has already beenthoroughly investigated on a pilot scale, however much work remains to investigatethe plants dynamic operation.

Terminallokalisering med tyngdpunktsberäkning och kostnadsanalys

The Kedertruss is the loadbearing part in the Keder weatherprotectionsystem and it has been analyzed concerning its loadbearing capacity. The Kedertruss is produced and manufactured by Wilhelm Layher GmbH & Co. KG and this report has been made for their Swedish division Layher AB.  The Kedertruss, designed in Germany according to German designcode, has been recalculated concerning Swedish conditions according to Eurocodes and a ongoing European standardization project. The two-dimensional program Winstatik Frame Analysis has been used for evaluation of load effects. Capacity has been calculated by hand-calculations and it has been verified that the Kedertruss in its larger spans isn?t able to withstand the loads.

TOMO Hugglink

Tomo Hugglink (TOMO Skog) is an innovation for harvest and transport of biofuels. The system consists of a truck, a chipping unit and crane mounted on a link and a wood chip trailer. The system works in such a way that the chipping unit is disconnected and placed on the site and wood chips are loaded directly into the wood chip trailer.The aim of this study was:- To examine the performance of the TOMO Hugglink system under different conditions such as the size, placement and quality of the pile.- To calculate the cost per raw ton for two vehicle combinations at different transport distances and to examine the effect of a reduction in set-up time and an increase in load weight.- To identify possible improvements with the TOMO Hugglink system.A time study was conducted within the thesis work to make it possible to determine production and time consumption. In the subsequent economic analysis the cost per tone at different transport distances was calculated for two different lorry concepts. Furthermore the effect of a reduction in set-up time and an increase in load weight was calculated.Under current conditions the utilization of the chipper is low and only 29 % of the total system time is occupied by chipping.

Vindkraft och elbilar på Öland år 2020 : Är smart laddning av elbilar lösningen på ett framtida flaskhalsproblem?

The Island of Öland has one of the best wind climates for land based wind power in Sweden. An objective for the Island is to become self sufficient using electricity from renewable source of energy such as wind. There is currently 55 MW capacity installed on the Island and it is estimated that grid congestion will occasionally occur if more than 135 MW was installed.The aim of this thesis is to investigate he possibilities for load management by smart charging of electric vehicles, EV. The definition of smart charging is that the charging is done to some extent with an ICT-system, (information and communication technology) that correlates wind electricity generation to the charging of electric vehicles. The purpose is to avoid grid congestions on the sub-sea cable that connects Öland to the mainland because that in turn would curtail wind energy production.

CAP KC3-12 : Design and finite element analysis

In offshore oil production FMC Subsea systems use a product called cap. The cap´s mainly task is to protect hubface and seal areas on inboard hub against dirt, corrosion and mechanical damage under installation of a subsea system. A new model of a cap has been designed and analysed using finite element method. The model is called KC3-12 and has a new function, emergency release, which is a backup method for the ROV (remote operated vehicle) to release the cap from the hubface when it is placed under water. The cap KC3-12 was found to fulfil the criteria under the test load pressure, according to ASME VIII, div2.

Funktionsupphandling av solelanläggningar

This thesis aims to contribute to improved functional procurement of photovoltaic systems, PV systems. Functional procurement means that criteria concerning a function are set rather than specifying technical details or products. Possible advantages and difficulties in using functional procurement have been analyzed by interviews, simulations and a case study. Electricity production and surplus production for different scenarios have been simulated via MATLAB. The MATLAB script was also used to generate rules of thumb on feasible solar fraction for six different load profiles; a church, a farm, a car mechanic, an office, an industry and an apartment building.

Automatisk trimning av drivsystemreglering från MATLAB

This master thesis covers the development of an automatic tuning process for the existing speed controller for drive systems. The drive systems are resonant two-mass systems where a motor is used to drive a load connected by a shaft. The developed method relies heavily on system identification and the construction of a complete mechanical model of the process. With this approach, the common problem with poor load speed control that derives from measuring only the motor speed can be addressed and solved for a majority of such processes.The automatic tuning method has along with general test functions been implemented in a complete tool for automatic tuning, testing and performance evaluation and reporting for drive systems..

Kundanpassning av ett rehabiliteringsverktyg

To be able to move around without having to think about each movement is for most people amatter of course. Todays society contributes to a life at high speed where the sparetime is oftenspend doing somekind of sport, even extreme sports which earlier only a few people wheredoing. This leads to not only good health effects but also to more injuries. One of the mostcommon injuries is the knee injury.Capio Artro Clinic is a clinic specialized in sports medicine and particulary patients with injuriesin knee, shoulder, foot, hip or elbow. They perform a great part of all the crucial ligamentsurgeries in Sweden and has therefor also a lot of patients in need for rehabilitation of the knee.During the rehabilitation the load of the injuried knee is increased in steps.

Processchemaläggare för mångkärniga processorer ? Fördelning av minnesbelastning i NUMA-system

For systems with multicore processors contention for shared resources is a problem that occurs when several memory-intensive processes are executed in parallel within the same memory domain. This contention has a direct influence on the performance of the system and is a complex problem that has been recognized for a long time. An attractive and actively studied way to minimize this problem is by using a process scheduler adapted to allocate processor cores in a way such that contention for shared resources is minimized.With the introduction of multicore NUMA-systems (Non-Uniform Memory Access) the situation has become even more complex. In these systems the access time for processor cores to different memory domains vary depending on factors such as distance and load. Thus, the process scheduler also has to consider where the memory of each process is placed to minimize the distance and balance the load on each memory domain.This report presents a user-level process scheduler for a NUMA-system based on the multicore processor Tilera TILEPro64.

Portning till ARM Cortex M3 och prestandajämförelse

The Anybus CompactCom modules are today using the Anybus NP30 processor. These modules are used for communication between industrial machines and larger network protocols. The communication loads on these systems are increasing every day and the limiting factor for the system is the processor.HMS, the company that develops the Anybus CompactCom, has shown interest for a benchmark test between the old processor and a new processor, ARM Cortex-M3. This project includes that benchmark. To be able to get results that reflect reality a test environment was created to simulate Anybus CompactCom conditions.

Flodpärlmusslans status i Laxtjärnbäcken : Effekter på flodpärlmusslan av sedimentbelastning och förekomst av bäckröding

The aim of this present study was to determine and evaluate whether the presence of brooktrout (Salvelinus fontinalis) and sediment load may be a threat against the reproduction anddistribution of freshwater pearl mussel (Margaritifera margaritifera) in a creek located innorthern Sweden. Freshwater pearl mussel is an endangered species and is dependent ofbrown trout (Salmo trutta) to reproduce. Therefore there are concerns of indirect effects onthe population of pearl mussel by competition between brown trout and brook trout. Ditchesfrom a nearby gravel road have been fixed to lower the sediment load into the creek. I tried toevaluate this action plan.

<- Föregående sida 4 Nästa sida ->